CN202509774U - 一种pccp管承插口外部接缝灌浆装置 - Google Patents
一种pccp管承插口外部接缝灌浆装置 Download PDFInfo
- Publication number
- CN202509774U CN202509774U CN2012200798253U CN201220079825U CN202509774U CN 202509774 U CN202509774 U CN 202509774U CN 2012200798253 U CN2012200798253 U CN 2012200798253U CN 201220079825 U CN201220079825 U CN 201220079825U CN 202509774 U CN202509774 U CN 202509774U
- Authority
- CN
- China
- Prior art keywords
- pccp
- pipe
- grout outlet
- flange
- external joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011513 prestressed concrete Substances 0.000 title abstract 2
- 239000011440 grout Substances 0.000 claims abstract description 27
- 239000000428 dust Substances 0.000 claims description 9
- 239000002002 slurry Substances 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 239000003818 cinder Substances 0.000 abstract 1
- 238000009776 industrial production Methods 0.000 abstract 1
- 239000011241 protective layer Substances 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000002699 waste material Substances 0.000 description 2
- 239000004593 Epoxy Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000011294 coal tar pitch Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009829 pitch coating Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型涉及一种PCCP管承插口外部接缝灌浆装置,本实用新型由料斗支架(1)、锥形料斗(2)、法兰盘(3)、手动卸灰阀(4)、弯管(5)、标准管(6)、标准管支架(7)、出浆口(8)、出浆口支架(9)组成。本实用新型能够工业化生产,拆装方便,可较好地控制一次出浆量,适合于各种复杂地形,可根据施工现场的实际情况灵活安放,稳定可靠,减少对PCCP保护层的损坏,节约了成本,提高了生产效率,大大方便了施工。
Description
技术领域
本实用新型涉及一种对PCCP管承插口钢构件外部接缝进行防腐保护时所使用的灌浆装置。
背景技术
目前,对于PCCP管承插口外部接缝灌浆常采用汽车吊料斗或简易溜槽的方法,汽车吊料斗这种方法长期使用汽车吊,台班费用高,而且料斗不易控制,不能控制一次出浆量,造成浪费;简易溜槽法,支撑结构各异,容易发生倒塌事故,也不能控制一次出浆量,造成浪费,而且其结构直接冲击PCCP管保护层,造成了承插口两侧的环氧煤沥青防腐层甚至水泥砂浆保护层的损坏。
发明内容
本实用新型的目的在于设计一种PCCP管承插口外部接缝灌浆装置,能够工业化生产,拆装方便,能控制一次出浆量,稳定可靠,减少对PCCP保护层的损坏。
一种PCCP管承插口外部接缝灌浆装置的基本原理是通过手动卸灰阀,控制出浆的流量,并通过法兰盘形式将锥形料斗、手动卸灰阀、弯管、标准管、出浆口固定在一起,放置在可靠的料斗支架、标准管支架和出浆口支架上的一种装置。
一种PCCP管承插口外部接缝灌浆装置基本结构由料斗支架(1)、锥形料斗(2)、法兰盘(3)、手动卸灰阀(4)、弯管(5)、标准管(6)、标准管支架(7)、出浆口(8)、出浆口支架(9)组成,其中标准管支架(7)由箍卡(13)、支托平台(10)、支腿转轴(11)、支腿(12)、可调插杆(14)组成;出浆口支架(9)由防溅挡板(15)、抗滑弧形支架(16)和出浆口托撑(17)组成,锥形料斗(2)焊接法兰盘(3)放置在料斗支架(1)上通过法兰盘(3)固定手动卸灰阀(4),手动卸灰阀(4)通过法兰盘(3)与弯管(5)连接,弯管(5)通过法兰盘(3)与标准管(6)连接,根据地形需要若干标准管(6)通过箍卡(13)固定在多个标准管支架(7)上,最后连接放置在出浆口支架(9)上的出浆口(8)形成一种PCCP管承插口外部接缝灌浆装置,实现供浆。
本实用新型可较好地控制控制一次出浆量,装置拆装方便,适合于各种复杂地形,可根据施工现场的实际情况灵活安放,稳定可靠,节约了成本,提高了生产效率,大大方便了施工。
附图说明
附图1为本实用新型的结构示意图。本实用新型由料斗支架(1)、锥形料斗(2)、法兰盘(3)、手动卸灰阀(4)、弯管(5)、标准管(6)、标准管支架(7)、出浆口(8)、出浆口支架(9)组成。
附图2为本实用新型标准管支架(7)正视和俯视图。由箍卡(13)、支托平台(10)、支腿转轴(11)、支腿(12)、可调插杆(14)组成。
附图3为本实用新型出浆口支架(9)三视图。由防溅挡板(15)、抗滑弧形支架(16)和出浆口托撑(17)组成。
具体实施方式
在实际施工过程中,首先根据现场地形,将料斗支架(1)固定放置在搅拌车能直接到达的位置,将锥形料斗(2)放置在料斗支架(1)上,通过法兰盘(3)将手动卸灰阀(4)固定,并调整手动卸灰阀(4)出口的方向使其正对PCCP管承插口钢构件外部接缝的位置,然后再根据PCCP管承插口钢构件外部接缝的位置及沟槽的高差和宽度,调整并固定标准管支架(7)和出浆口支架(9),最后将多节标准管(6)和出浆口(8)通过法兰盘(3)依次固定;其中通过支腿转轴(11)调整支腿(12)的方向,通过可调插杆(14)调整支腿(12)高度,将箍卡(13)和支腿平台(10)连接在标准管上,再通过再次调整可调插杆(14)调整支腿(12)的高度将标准管(6)顶紧固定牢固;将出浆口支架(9)居中放置在PCCP管承插口钢构件外部接缝处,出浆口(8)通过出浆口托撑(17)支撑伸入出浆口支架(9)内并正对接缝,出浆口支架(9)四周用防溅挡板(15)围挡。
Claims (1)
1.一种PCCP管承插口外部接缝灌浆装置,其特征在于:由料斗支架(1)、锥形料斗(2)、法兰盘(3)、手动卸灰阀(4)、弯管(5)、标准管(6)、标准管支架(7)、出浆口(8)、出浆口支架(9)组成,锥形料斗(2)焊接法兰盘(3)放置在料斗支架(1)上通过法兰盘(3)固定手动卸灰阀(4),手动卸灰阀(4)通过法兰盘(3)与弯管(5)连接,弯管(5)通过法兰盘(3)与标准管(6)连接,标准管(6)通过箍卡(13)固定在标准管支架(7)上,最后连接放置在出浆口支架(9)上的出浆口(8)形成一种PCCP管承插口外部接缝灌浆装置,实现供浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200798253U CN202509774U (zh) | 2012-03-06 | 2012-03-06 | 一种pccp管承插口外部接缝灌浆装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200798253U CN202509774U (zh) | 2012-03-06 | 2012-03-06 | 一种pccp管承插口外部接缝灌浆装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202509774U true CN202509774U (zh) | 2012-10-31 |
Family
ID=47062266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200798253U Expired - Lifetime CN202509774U (zh) | 2012-03-06 | 2012-03-06 | 一种pccp管承插口外部接缝灌浆装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202509774U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649336A (zh) * | 2015-02-05 | 2016-06-08 | 中国建筑第四工程局有限公司 | 采用砂浆料斗将砂浆混凝土运至楼层的方法及装置 |
CN117513751A (zh) * | 2024-01-08 | 2024-02-06 | 山西鑫明科技有限公司 | 一种混凝土浇筑溜槽 |
-
2012
- 2012-03-06 CN CN2012200798253U patent/CN202509774U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649336A (zh) * | 2015-02-05 | 2016-06-08 | 中国建筑第四工程局有限公司 | 采用砂浆料斗将砂浆混凝土运至楼层的方法及装置 |
CN117513751A (zh) * | 2024-01-08 | 2024-02-06 | 山西鑫明科技有限公司 | 一种混凝土浇筑溜槽 |
CN117513751B (zh) * | 2024-01-08 | 2024-03-19 | 山西鑫明科技有限公司 | 一种混凝土浇筑溜槽 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104499504B (zh) | 一种道路检查井及其施工方法 | |
CN103243961B (zh) | 火力发电厂烟囱钛板钢内筒倒装施工装置 | |
CN204385622U (zh) | 一种桥梁预应力管道压浆装置 | |
CN202509774U (zh) | 一种pccp管承插口外部接缝灌浆装置 | |
CN203640247U (zh) | 一种高炉水渣排汽筒体的抱箍式可拆卸操作平台 | |
CN103953193B (zh) | 一种用于长距离缓坡度的混凝土输送的施工工法 | |
CN204626453U (zh) | 城市地下综合管廊中管道的支承机构 | |
CN208816844U (zh) | 一种地下水封洞库竖井井口管道支承装置 | |
CN203856209U (zh) | 一种长距离缓坡度混凝土输送装置 | |
CN201133083Y (zh) | 砼泵送用简易布料器 | |
CN204002876U (zh) | 一种用于隧洞施工的钢台车 | |
CN205117363U (zh) | 隧道二衬钢筋精确定位装置 | |
CN106150097A (zh) | 新型构造柱混凝土泵送系统 | |
CN202273180U (zh) | 薄壁高墩半自动喷水养生系统 | |
CN202467221U (zh) | 发电厂主厂房钢屋架吊装起重装置 | |
CN202577327U (zh) | 用于沉管隧道最终接头处的阻浆结构 | |
CN204040044U (zh) | 一种深基坑临边防护栏 | |
CN109577368A (zh) | 一种城市地下管廊内管道快速支撑方法 | |
CN207514380U (zh) | 穿管用减阻器 | |
CN205933040U (zh) | 龙门架起吊装置 | |
CN103334590A (zh) | 大型钢管柱混凝土施工装置及施工方法 | |
CN201762724U (zh) | 树脂混凝土通信管道人孔 | |
CN203394060U (zh) | 桥梁建设用混凝土输送装置 | |
CN108980461B (zh) | 一种受限空间下顶管施工中的起重吊装施工工艺 | |
CN203440854U (zh) | 远距离可移动式pccp管回填土布料机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121031 |
|
CX01 | Expiry of patent term | ||
DD01 | Delivery of document by public notice |
Addressee: Hou Jun Document name: Notice of expiration and termination of patent right |
|
DD01 | Delivery of document by public notice |