CN202467188U - Pipeline opening gap casting clamping mould fixing device - Google Patents

Pipeline opening gap casting clamping mould fixing device Download PDF

Info

Publication number
CN202467188U
CN202467188U CN2012200204503U CN201220020450U CN202467188U CN 202467188 U CN202467188 U CN 202467188U CN 2012200204503 U CN2012200204503 U CN 2012200204503U CN 201220020450 U CN201220020450 U CN 201220020450U CN 202467188 U CN202467188 U CN 202467188U
Authority
CN
China
Prior art keywords
pipeline opening
kato
snap gauge
convex edge
fastening devices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200204503U
Other languages
Chinese (zh)
Inventor
王立乾
李志国
张青
李京涛
郭群录
李志鹏
张玮
刘康
韩永春
王志广
葛玉宾
申志敏
吕玉芝
李桂杰
王艳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Engineering Group Decoration Engineering Co., Ltd.
Original Assignee
HEBEI CONSTRUCTION GROUP DECORATION ENGINEERING CO LTD
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI CONSTRUCTION GROUP DECORATION ENGINEERING CO LTD, Hebei Construction Group Corp Ltd filed Critical HEBEI CONSTRUCTION GROUP DECORATION ENGINEERING CO LTD
Priority to CN2012200204503U priority Critical patent/CN202467188U/en
Application granted granted Critical
Publication of CN202467188U publication Critical patent/CN202467188U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a pipeline opening gap casting clamping mould fixing device. The clamping mould fixing device comprises two clamping supports and two fastening steel clips, wherein corresponding semicircular holes are arranged in the middles of the clamping supports; a pipe-shaped convex edge is arranged at the edge of one side of each semicircular hole; and a pipe-shaped rubber sealing gasket is arranged along the inner wall of each pipe-shaped convex edge. The pipeline opening gap casting clamping mould fixing device has the advantages of simple and reasonable structure, safety in operation, low labor intensity, high working efficiency, easiness in disassembly, high repeated utilization rate, good engineering quality and the like, and can be widely applied to the pipeline opening casting gap of house building, decoration and maintaining engineering.

Description

The snap gauge fastening devices is built in the pipeline opening space
Technical field
The utility model relates to a kind of template equipment of building operations, and the snap gauge fastening devices is built in a kind of specifically pipeline opening space.
Background technology
In building construction, decoration and the maintenance and renovation engineering, a lot of water supply and sewerage pipelines all will pass each floor plate and install, pipe laying for ease, and people often need beat reserving hole with puncher in work progress.Generally speaking, the diameter of the reserving hole of beating is greater than the diameter of pipeline on floor, and like this, finishing the back in piping erection just need be closely knit with the pouring of the space around the pipeline, in order to avoid seepage.At present, the construction work reserving hole to add stifled template following with method: fix three-ply board with two iron wires binding flitch two ends, hold pipeline opening; Then at the floor another side with flitch with two identical iron wire secure both ends, fix pipeline, and then concreting; After having built three-ply board and flitch are removed, the iron wire that is retained in the outside is cut off, and the iron wire of staying in the concrete can't be taken out; Time has been grown the corrosion that causes iron wire, and the seepage phenomenon appears in the later stage easily.In addition, this template is used also needs two people while compounding practice up and down, when floor template lower space is narrow and small, has certain operation easier; When story height is big; Floor below personnel carry out work high above the ground, and not only efficiency of construction is low, and the easy uneasiness that produces is gone hidden danger.Therefore, this method exists labour intensity high, defectives such as operability is poor, inefficiency, workmanship difference and operation danger.
The utility model content
The purpose of the utility model just provides a kind of pipeline opening space and builds the snap gauge fastening devices, builds to solve existing building engineering reserving hole that the operability that the space template exists is poor, inefficiency, recycling rate of waterused are low, workmanship difference and the dangerous problem of operating personnel's operation.
The purpose of the utility model is achieved in that a kind of pipeline opening space builds the snap gauge fastening devices; Said snap gauge fastening devices comprises two Katos and two fastening steel cards; The mid portion of said Kato is provided with corresponding semicircle orifice; Said semicircle orifice one lateral edges place is provided with the tubulose convex edge, and said tubulose convex edge inwall is provided with rubber gasket.
Said convex edge is provided with the installing hole that is used for the fastening steel card of clamping, is convenient to close being fixed on the convex edge of fastening steel chucking, makes the convex edge be sealed tubular and is fixed on the pipeline.
Said Kato is to be plastics, glass fiber reinforced plastic or steel section bar, and people can suitably selection under requirement of engineering and cost-effective principle.
The thickness of said Kato is 5 mm, and the thickness of said rubber gasket is 3 mm.
Said Kato semicircular in shape or right-angled triangle can be pieced together difformities such as forming circle, rectangle according to the construction needs, with convenient construction.
Said Kato is provided with reinforcing rib, has improved the tolerance of Kato.
The utility model adopts Kato and the alternative wooden splint of inefficiency in the past of the fixedly snap gauge of steel card and the fixed form of iron wire, makes pipeline opening build the engineering firm position, simple to operate, singlely can carry out operation; The tight rubber pad of inwall setting can obviously be contained the spillage phenomenon in the tubulose convex edge; And readily removable being prone to of snap gauge unload, and can reuse, and this has not only improved construction speed and quality, and has reduced labor intensity of operating personnel and potential safety hazard.
The utlity model has that simple and reasonable, handling safety, labour intensity are low, high efficiency, quick detachable, advantages such as recycling rate of waterused is high, good engineering quality, can build in the space in the pipeline opening of building construction, finishing and maintenance works and be widely used.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the user mode sketch map of the utility model.
Among the figure: 1, Kato, 2, fastening steel card, 3, semicircle orifice, 4, the convex edge, 5, rubber gasket, 6, reinforcing rib, 7, pipeline, 8, build the space, 9, fastening bolt.
The specific embodiment
As shown in Figure 1; The utility model comprises Kato 1 and two fastening steel cards 2 of two plastic materials; The mid portion of each Kato 1 is provided with corresponding semicircle orifice 3; These semicircle orifice 3 one lateral edges places are provided with tubulose convex edge 4, and the semicircle orifice of two Katos 1 is involutory, and convex edge 4 can be protruding pipe shape.
Be pasted with rubber gasket 5 on the inwall of convex edge 4, its thickness is 3 mm, can increase sealing, and containment spillage phenomenon produces.
Installing hole on the fastening bolt 9 corresponding convex edges 4 that fastening steel card 2 is provided with, fastening steel card 2 can be anchored on tubulose convex edge 4 on the pipe, fixedly positioning.
Kato 1 can select for use glass fiber reinforced plastic or steel to process by requirement of engineering, and Thickness Design is 5 mm.Kato 1 is in the form of annular discs, and this disk is provided with reinforcing rib 6, can improve the tolerance of snap gauge.
As shown in Figure 2; The course of work of the utility model is: two semicircular plastics Katos 1 that contain the convex edge are close to floor slab bottoms are enclosed within on the pipeline 7, two Katos 1 are closed be stitched together, 4 usefulness, two fastening steel folders 2 in tubulose convex edge, bottom are fixedly clamped; With tightly being fixed in the tubulose convex edge 4 of pipeline 7; And then fill with pea gravel concreten and to build space 8, to build the space firmly solid in order to make, and can carry out machinery according to actual needs and vibrate; It is detachable snap gauge that thing to be filled condensed 2~6 hours, and this snap gauge also can reuse.

Claims (6)

1. the snap gauge fastening devices is built in a pipeline opening space; It is characterized in that; Said snap gauge fastening devices comprises two Katos (1) and two fastening steel cards (2); The mid portion of said Kato (1) is provided with corresponding semicircle orifice (3), and said semicircle orifice (3) one lateral edges places are provided with tubulose convex edge (4), and said tubulose convex edge (4) inwall is provided with rubber gasket (5).
2. the snap gauge fastening devices is built in pipeline opening according to claim 1 space, it is characterized in that, said convex edge (4) are provided with the installing hole that is used for the fastening steel card of clamping.
3. the snap gauge fastening devices is built in pipeline opening according to claim 1 and 2 space, it is characterized in that, said Kato (1) is to be plastics, glass fiber reinforced plastic or steel section bar.
4. the snap gauge fastening devices is built in pipeline opening according to claim 1 space, it is characterized in that, the thickness of said Kato (1) is 5 mm, and the thickness of said rubber gasket (5) is 3 mm.
5. the snap gauge fastening devices is built in pipeline opening according to claim 1 space, it is characterized in that said Kato (1) semicircular in shape or right-angled triangle.
6. want 5 described pipeline opening spaces to build the snap gauge fastening devices according to right, it is characterized in that said Kato (1) is provided with reinforcing rib (6).
CN2012200204503U 2012-01-17 2012-01-17 Pipeline opening gap casting clamping mould fixing device Expired - Lifetime CN202467188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200204503U CN202467188U (en) 2012-01-17 2012-01-17 Pipeline opening gap casting clamping mould fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200204503U CN202467188U (en) 2012-01-17 2012-01-17 Pipeline opening gap casting clamping mould fixing device

Publications (1)

Publication Number Publication Date
CN202467188U true CN202467188U (en) 2012-10-03

Family

ID=46915355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200204503U Expired - Lifetime CN202467188U (en) 2012-01-17 2012-01-17 Pipeline opening gap casting clamping mould fixing device

Country Status (1)

Country Link
CN (1) CN202467188U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018669A (en) * 2013-04-20 2014-09-03 昆山友进智能建筑工程有限公司 Concrete pipeline hole repair template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018669A (en) * 2013-04-20 2014-09-03 昆山友进智能建筑工程有限公司 Concrete pipeline hole repair template

Similar Documents

Publication Publication Date Title
CN100537918C (en) A kind of die-shell member for filling concrete
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN103774687A (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN103352471A (en) Container prefabricated house assembling type steel reinforced concrete single-double-column foundation and construction method thereof
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN206625234U (en) The adaptability connecting node of concrete assembled shaped steel mixing purlin and fender post
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103343547B (en) Container type prefabricated house assembling steel reinforced concrete four patten and construction method
CN202787330U (en) Post-cast strip template
CN202467188U (en) Pipeline opening gap casting clamping mould fixing device
CN105507472B (en) Cavity body, cassette ceiling and cassette ceiling manufacturing method
CN203846523U (en) Combined tower crane foundation
CN204080841U (en) The fixed structure of basis GRC fetal membrane
CN102352690B (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN204174496U (en) A kind of novel town road structure
CN104343204B (en) Sectional continuous floating-resistant cast-in-situ hollow slab
CN203429655U (en) Assembly type steel reinforced concrete single-double column foundation for container prefabricated house
CN205804949U (en) A kind of sealing reversed beam model sheetinstallat fixing device
CN205637650U (en) Concrete sump fast -assembling nipple joint
CN2539797Y (en) Special-purpose clamping mould for fast blocking-up provided pipe hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 050000 Shijiazhuang, Xinhua District, Hebei friendship North Street, No. 146

Patentee after: Hebei Construction Group Co., Ltd.

Patentee after: Hebei Construction Engineering Group Decoration Engineering Co., Ltd.

Address before: 050000 Shijiazhuang, Xinhua District, Hebei friendship North Street, No. 146

Patentee before: Hebei Construction Group Co., Ltd.

Patentee before: Hebei Construction Group Decoration Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20121003

CX01 Expiry of patent term