CN205637650U - Concrete sump fast -assembling nipple joint - Google Patents
Concrete sump fast -assembling nipple joint Download PDFInfo
- Publication number
- CN205637650U CN205637650U CN201620476769.5U CN201620476769U CN205637650U CN 205637650 U CN205637650 U CN 205637650U CN 201620476769 U CN201620476769 U CN 201620476769U CN 205637650 U CN205637650 U CN 205637650U
- Authority
- CN
- China
- Prior art keywords
- fast
- assembling
- steel tube
- embedded steel
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000002445 nipple Anatomy 0.000 title claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 238000002360 preparation method Methods 0.000 claims abstract description 4
- 238000007789 sealing Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 7
- 238000012423 maintenance Methods 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 239000011152 fibreglass Substances 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000004568 cement Substances 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a concrete sump fast -assembling nipple joint, including the pre -buried steel pipe of fast -assembling, the one end of the pre -buried steel pipe of fast -assembling is provided with mounting flange, and the other end is provided with flange, flange's diameter is less than mounting flange's diameter, on -the -spot preparation can make pre -buried steel pipe of fast -assembling and concrete sump wall fixed clamp's fastening roof on the pre -buried steel pipe of fast -assembling, the setting of fastening roof lies in between mounting flange and the flange on the pre -buried steel pipe of fast -assembling. Compared with the prior art, the beneficial effects of the utility model are that: one, reduces the engineering time, reduce construction period, two, after put into operation in the pond, the concrete can continue the maintenance, and construction quality is guaranteed to reinforcing intensity.
Description
Technical field
This utility model relates to the renovation technique field of concrete sump, relates in particular to a kind of concrete sump fast-assembling pipe nipple.
Background technology
Concrete sump is the most common in daily life.Change (expansion) at some chemical enterprises such as this enterprise builds in engineering, that some have been laid or existing concrete (brick) pond is needed to utilize, but the drain pipe bottom the most existing concrete sump is little or drain pipe lazy weight, when need to increase drain pipe, conventional pond increases drain pipe scheme, system first stops production, then punch hole with electric pick, built-in pipe, formwork supporting plate, casting concrete are installed thereafter, form removal after solidification, maintenance, concrete comes into operation after reaching set strength.According to this conventional scheme, then the engineering time is long, adds that freezing period need to have a strong impact on the production of original production system with about about 15 days time, needed at that time to there is also drawbacks described above when increasing water inlet pipe.
Utility model content
The purpose of this utility model is the defect for above-mentioned prior art, a kind of concrete sump fast-assembling pipe nipple is provided, built-in pipe structure is transformed, can use after reaching to install, overcome the shortcoming that conventional construction is long in time limit completely, greatly reduce the down time of original production system.
To achieve these goals, the technical solution of the utility model is:
A kind of concrete sump fast-assembling pipe nipple, including a fast-assembling embedded steel tube, one end of described fast-assembling embedded steel tube is provided with mounting flange, and the other end is provided with adpting flange, and the diameter of described adpting flange is less than the diameter of mounting flange;On described fast-assembling embedded steel tube, extemporaneous preparation can make the fastening top board that fast-assembling embedded steel tube and concrete-pool-wall fix to clamp, and described fastening top board is arranged on fast-assembling embedded steel tube, between mounting flange and adpting flange.
As the improvement to technique scheme, the inner of described mounting flange is provided with sealing gasket.
As the improvement to technique scheme, described fastening top board is axially disposed the bolt making fast-assembling embedded steel tube and concrete-pool-wall fix to clamp.
As the improvement to technique scheme, described fastening top board includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube Site Welding, and described bolt is arranged on disc.
Concrete sump fast-assembling pipe nipple of the present utility model, punches the position water drilling preparing embedded steel tube, and the punching degree of depth is less than the 30mm of pond wall thickness;Produce stopping production draining, continue to drill through by the position holed on pool wall, take off, then repair hole with electric pick, until can load;Pad sealing gasket, wearing concrete sump fast-assembling pipe nipple, fast-assembling embedded steel tube is through rear welding fastening top board, afterwards, tight upper bolt, uniform stressed, until by sealing gasket compressive strain, then paper with fiberglass inside fast-assembling embedded steel tube pond, ensure not seep water, making cement, and connection pool external pipeline again outside fast-assembling embedded steel tube pond firm by ramming, in pond, at fiberglass paper, fiberglass is cured and just can come into operation.
Compared with prior art, the beneficial effects of the utility model are:
One, reduce the engineering time, reduce the construction period;Two, after put into operation in pond, concrete can continue maintenance, strengthens intensity, it is ensured that construction quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment the utility model is further described.
As shown in Figure 1, concrete sump fast-assembling pipe nipple of the present utility model, including a fast-assembling embedded steel tube 1, one end of described fast-assembling embedded steel tube 1 is provided with mounting flange 2, the other end is provided with adpting flange 7, and the diameter of described adpting flange 7 is less than the diameter of mounting flange 2;On described fast-assembling embedded steel tube 1, extemporaneous preparation can make the fastening top board 5 that fast-assembling embedded steel tube 1 and concrete-pool-wall 4 fix to clamp, and described fastening top board 5 is arranged on fast-assembling embedded steel tube 1, between mounting flange 2 and adpting flange 7.
The inner of described mounting flange 2 is provided with sealing gasket 3.
Described fastening top board 5 is axially disposed the bolt 6 making fast-assembling embedded steel tube 1 and concrete-pool-wall 4 fix to clamp.
Described fastening top board 5 includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube 1 Site Welding, and described bolt 6 is arranged on disc.
Concrete sump fast-assembling pipe nipple of the present utility model, punches the position water drilling preparing embedded steel tube, and the punching degree of depth is less than the 30mm of pond wall thickness;Produce stopping production draining, continue to drill through by the position holed on pool wall, take off, then repair hole with electric pick, until can load;Pad sealing gasket, wearing concrete sump fast-assembling pipe nipple, fast-assembling embedded steel tube is through rear welding fastening top board, afterwards, tight upper bolt, uniform stressed, until by sealing gasket compressive strain, then paper with fiberglass inside fast-assembling embedded steel tube pond, ensure not seep water, making cement, and connection pool external pipeline again outside fast-assembling embedded steel tube pond firm by ramming, in pond, at fiberglass paper, fiberglass is cured and just can come into operation.
Concrete sump fast-assembling pipe nipple of the present utility model, one, reduce the engineering time, reduce the construction period;Two, after put into operation in pond, concrete can continue maintenance, strengthens intensity, it is ensured that construction quality.
The above is only a kind of embodiment of the present utility model; it should be pointed out that, for those skilled in the art, on the premise of without departing from this utility model know-why; can also make some improvement, these improvement also should be regarded as protection domain of the present utility model.
Claims (4)
1. a concrete sump fast-assembling pipe nipple, including a fast-assembling embedded steel tube, it is characterised in that: one end of described fast-assembling embedded steel tube is provided with mounting flange, and the other end is provided with adpting flange, and the diameter of described adpting flange is less than the diameter of mounting flange;On described fast-assembling embedded steel tube, extemporaneous preparation can make the fastening top board that fast-assembling embedded steel tube and concrete-pool-wall fix to clamp, and described fastening top board is arranged on fast-assembling embedded steel tube, between mounting flange and adpting flange.
Concrete sump fast-assembling pipe nipple the most according to claim 1, it is characterised in that: the inner of described mounting flange is provided with sealing gasket.
Concrete sump fast-assembling pipe nipple the most according to claim 1 and 2, it is characterised in that: described fastening top board is axially disposed the bolt making fast-assembling embedded steel tube and concrete-pool-wall fix to clamp.
Concrete sump fast-assembling pipe nipple the most according to claim 3, it is characterised in that: described fastening top board includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube Site Welding, and described bolt is arranged on disc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620476769.5U CN205637650U (en) | 2016-05-24 | 2016-05-24 | Concrete sump fast -assembling nipple joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620476769.5U CN205637650U (en) | 2016-05-24 | 2016-05-24 | Concrete sump fast -assembling nipple joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637650U true CN205637650U (en) | 2016-10-12 |
Family
ID=57055714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620476769.5U Expired - Fee Related CN205637650U (en) | 2016-05-24 | 2016-05-24 | Concrete sump fast -assembling nipple joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637650U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106704702A (en) * | 2016-12-14 | 2017-05-24 | 江西自立环保科技有限公司 | Simple embedded pipe adding method |
CN110173597A (en) * | 2019-04-19 | 2019-08-27 | 东莞建晖纸业有限公司 | Paper mill stock tank and white water chest Fast Installation manhole or line process |
-
2016
- 2016-05-24 CN CN201620476769.5U patent/CN205637650U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106704702A (en) * | 2016-12-14 | 2017-05-24 | 江西自立环保科技有限公司 | Simple embedded pipe adding method |
CN110173597A (en) * | 2019-04-19 | 2019-08-27 | 东莞建晖纸业有限公司 | Paper mill stock tank and white water chest Fast Installation manhole or line process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202000380U (en) | Basement outer wall post-pouring belt backfill protective plate | |
CN104947719B (en) | The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip | |
CN202099816U (en) | Prefabricated waterproof and soil-blocking plate for later poured band of outer wall of basement | |
CN103422674B (en) | Prefabricated concrete structure Cast-in-Situ Segment concrete construction method | |
CN110761322B (en) | Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof | |
CN101575913A (en) | Construction method for preventing reserved holes of pipes from water leakage | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN204343339U (en) | A kind of temporary support columns waterproof base plate | |
CN205637650U (en) | Concrete sump fast -assembling nipple joint | |
CN104988915A (en) | Prefabrication and installation method of detachable steel protection tube device and underwater connection beam | |
CN202787330U (en) | Post-cast strip template | |
CN102619329B (en) | Expansion restraint construction method for post-pouring belt | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN205662948U (en) | Cold area road surface manhole cover | |
CN208777690U (en) | A kind of reserved floor sealing hole template component of drainage pipeline | |
CN206158192U (en) | Concrete pump pipe's simple easily fixable device on concrete face | |
CN204780894U (en) | Can dismantle steel protects wound packages and puts | |
CN101956402B (en) | Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall | |
CN202000379U (en) | Blocking device for reserved port on bottom plate of basement | |
CN205024733U (en) | Fixing device for advanced water stop | |
CN205348421U (en) | A bury formula waterproof construction for side wall movement joint | |
CN204491679U (en) | A kind of ater-casting exterior wall plugging structure with elastic waterstop bar | |
CN205276721U (en) | Roof drainage seals eaves mouth mounting structure | |
CN203113526U (en) | Temporary fixing structure of rubber waterstop | |
CN220686520U (en) | Waterproof construction is exempted from to wear by roofing slag layer blast pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 454000 Jiaozuo District, Henan city Feng Feng Office Patentee after: LOMON BILLIONS GROUP Co.,Ltd. Address before: 454191 west station, Henan, Jiaozuo Province, three km Patentee before: Henan Billions Chemicals Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 |