CN205637650U - Concrete sump fast -assembling nipple joint - Google Patents

Concrete sump fast -assembling nipple joint Download PDF

Info

Publication number
CN205637650U
CN205637650U CN201620476769.5U CN201620476769U CN205637650U CN 205637650 U CN205637650 U CN 205637650U CN 201620476769 U CN201620476769 U CN 201620476769U CN 205637650 U CN205637650 U CN 205637650U
Authority
CN
China
Prior art keywords
fast
assembling
steel tube
embedded steel
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620476769.5U
Other languages
Chinese (zh)
Inventor
和奔流
杨爱芹
韩海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lomon Billions Group Co ltd
Original Assignee
HENAN BAILILIAN CHEMICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN BAILILIAN CHEMICAL CO Ltd filed Critical HENAN BAILILIAN CHEMICAL CO Ltd
Priority to CN201620476769.5U priority Critical patent/CN205637650U/en
Application granted granted Critical
Publication of CN205637650U publication Critical patent/CN205637650U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a concrete sump fast -assembling nipple joint, including the pre -buried steel pipe of fast -assembling, the one end of the pre -buried steel pipe of fast -assembling is provided with mounting flange, and the other end is provided with flange, flange's diameter is less than mounting flange's diameter, on -the -spot preparation can make pre -buried steel pipe of fast -assembling and concrete sump wall fixed clamp's fastening roof on the pre -buried steel pipe of fast -assembling, the setting of fastening roof lies in between mounting flange and the flange on the pre -buried steel pipe of fast -assembling. Compared with the prior art, the beneficial effects of the utility model are that: one, reduces the engineering time, reduce construction period, two, after put into operation in the pond, the concrete can continue the maintenance, and construction quality is guaranteed to reinforcing intensity.

Description

A kind of concrete sump fast-assembling pipe nipple
Technical field
This utility model relates to the renovation technique field of concrete sump, relates in particular to a kind of concrete sump fast-assembling pipe nipple.
Background technology
Concrete sump is the most common in daily life.Change (expansion) at some chemical enterprises such as this enterprise builds in engineering, that some have been laid or existing concrete (brick) pond is needed to utilize, but the drain pipe bottom the most existing concrete sump is little or drain pipe lazy weight, when need to increase drain pipe, conventional pond increases drain pipe scheme, system first stops production, then punch hole with electric pick, built-in pipe, formwork supporting plate, casting concrete are installed thereafter, form removal after solidification, maintenance, concrete comes into operation after reaching set strength.According to this conventional scheme, then the engineering time is long, adds that freezing period need to have a strong impact on the production of original production system with about about 15 days time, needed at that time to there is also drawbacks described above when increasing water inlet pipe.
Utility model content
The purpose of this utility model is the defect for above-mentioned prior art, a kind of concrete sump fast-assembling pipe nipple is provided, built-in pipe structure is transformed, can use after reaching to install, overcome the shortcoming that conventional construction is long in time limit completely, greatly reduce the down time of original production system.
To achieve these goals, the technical solution of the utility model is:
A kind of concrete sump fast-assembling pipe nipple, including a fast-assembling embedded steel tube, one end of described fast-assembling embedded steel tube is provided with mounting flange, and the other end is provided with adpting flange, and the diameter of described adpting flange is less than the diameter of mounting flange;On described fast-assembling embedded steel tube, extemporaneous preparation can make the fastening top board that fast-assembling embedded steel tube and concrete-pool-wall fix to clamp, and described fastening top board is arranged on fast-assembling embedded steel tube, between mounting flange and adpting flange.
As the improvement to technique scheme, the inner of described mounting flange is provided with sealing gasket.
As the improvement to technique scheme, described fastening top board is axially disposed the bolt making fast-assembling embedded steel tube and concrete-pool-wall fix to clamp.
As the improvement to technique scheme, described fastening top board includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube Site Welding, and described bolt is arranged on disc.
Concrete sump fast-assembling pipe nipple of the present utility model, punches the position water drilling preparing embedded steel tube, and the punching degree of depth is less than the 30mm of pond wall thickness;Produce stopping production draining, continue to drill through by the position holed on pool wall, take off, then repair hole with electric pick, until can load;Pad sealing gasket, wearing concrete sump fast-assembling pipe nipple, fast-assembling embedded steel tube is through rear welding fastening top board, afterwards, tight upper bolt, uniform stressed, until by sealing gasket compressive strain, then paper with fiberglass inside fast-assembling embedded steel tube pond, ensure not seep water, making cement, and connection pool external pipeline again outside fast-assembling embedded steel tube pond firm by ramming, in pond, at fiberglass paper, fiberglass is cured and just can come into operation.
Compared with prior art, the beneficial effects of the utility model are:
One, reduce the engineering time, reduce the construction period;Two, after put into operation in pond, concrete can continue maintenance, strengthens intensity, it is ensured that construction quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment the utility model is further described.
As shown in Figure 1, concrete sump fast-assembling pipe nipple of the present utility model, including a fast-assembling embedded steel tube 1, one end of described fast-assembling embedded steel tube 1 is provided with mounting flange 2, the other end is provided with adpting flange 7, and the diameter of described adpting flange 7 is less than the diameter of mounting flange 2;On described fast-assembling embedded steel tube 1, extemporaneous preparation can make the fastening top board 5 that fast-assembling embedded steel tube 1 and concrete-pool-wall 4 fix to clamp, and described fastening top board 5 is arranged on fast-assembling embedded steel tube 1, between mounting flange 2 and adpting flange 7.
The inner of described mounting flange 2 is provided with sealing gasket 3.
Described fastening top board 5 is axially disposed the bolt 6 making fast-assembling embedded steel tube 1 and concrete-pool-wall 4 fix to clamp.
Described fastening top board 5 includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube 1 Site Welding, and described bolt 6 is arranged on disc.
Concrete sump fast-assembling pipe nipple of the present utility model, punches the position water drilling preparing embedded steel tube, and the punching degree of depth is less than the 30mm of pond wall thickness;Produce stopping production draining, continue to drill through by the position holed on pool wall, take off, then repair hole with electric pick, until can load;Pad sealing gasket, wearing concrete sump fast-assembling pipe nipple, fast-assembling embedded steel tube is through rear welding fastening top board, afterwards, tight upper bolt, uniform stressed, until by sealing gasket compressive strain, then paper with fiberglass inside fast-assembling embedded steel tube pond, ensure not seep water, making cement, and connection pool external pipeline again outside fast-assembling embedded steel tube pond firm by ramming, in pond, at fiberglass paper, fiberglass is cured and just can come into operation.
Concrete sump fast-assembling pipe nipple of the present utility model, one, reduce the engineering time, reduce the construction period;Two, after put into operation in pond, concrete can continue maintenance, strengthens intensity, it is ensured that construction quality.
The above is only a kind of embodiment of the present utility model; it should be pointed out that, for those skilled in the art, on the premise of without departing from this utility model know-why; can also make some improvement, these improvement also should be regarded as protection domain of the present utility model.

Claims (4)

1. a concrete sump fast-assembling pipe nipple, including a fast-assembling embedded steel tube, it is characterised in that: one end of described fast-assembling embedded steel tube is provided with mounting flange, and the other end is provided with adpting flange, and the diameter of described adpting flange is less than the diameter of mounting flange;On described fast-assembling embedded steel tube, extemporaneous preparation can make the fastening top board that fast-assembling embedded steel tube and concrete-pool-wall fix to clamp, and described fastening top board is arranged on fast-assembling embedded steel tube, between mounting flange and adpting flange.
Concrete sump fast-assembling pipe nipple the most according to claim 1, it is characterised in that: the inner of described mounting flange is provided with sealing gasket.
Concrete sump fast-assembling pipe nipple the most according to claim 1 and 2, it is characterised in that: described fastening top board is axially disposed the bolt making fast-assembling embedded steel tube and concrete-pool-wall fix to clamp.
Concrete sump fast-assembling pipe nipple the most according to claim 3, it is characterised in that: described fastening top board includes the disc being arranged at fast-assembling embedded steel tube perimembranous, and described disc is structure as a whole with fast-assembling embedded steel tube Site Welding, and described bolt is arranged on disc.
CN201620476769.5U 2016-05-24 2016-05-24 Concrete sump fast -assembling nipple joint Expired - Fee Related CN205637650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620476769.5U CN205637650U (en) 2016-05-24 2016-05-24 Concrete sump fast -assembling nipple joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620476769.5U CN205637650U (en) 2016-05-24 2016-05-24 Concrete sump fast -assembling nipple joint

Publications (1)

Publication Number Publication Date
CN205637650U true CN205637650U (en) 2016-10-12

Family

ID=57055714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620476769.5U Expired - Fee Related CN205637650U (en) 2016-05-24 2016-05-24 Concrete sump fast -assembling nipple joint

Country Status (1)

Country Link
CN (1) CN205637650U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704702A (en) * 2016-12-14 2017-05-24 江西自立环保科技有限公司 Simple embedded pipe adding method
CN110173597A (en) * 2019-04-19 2019-08-27 东莞建晖纸业有限公司 Paper mill stock tank and white water chest Fast Installation manhole or line process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704702A (en) * 2016-12-14 2017-05-24 江西自立环保科技有限公司 Simple embedded pipe adding method
CN110173597A (en) * 2019-04-19 2019-08-27 东莞建晖纸业有限公司 Paper mill stock tank and white water chest Fast Installation manhole or line process

Similar Documents

Publication Publication Date Title
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN202099816U (en) Prefabricated waterproof and soil-blocking plate for later poured band of outer wall of basement
CN103422674B (en) Prefabricated concrete structure Cast-in-Situ Segment concrete construction method
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN101575913A (en) Construction method for preventing reserved holes of pipes from water leakage
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN205637650U (en) Concrete sump fast -assembling nipple joint
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN202787330U (en) Post-cast strip template
CN102619329B (en) Expansion restraint construction method for post-pouring belt
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN205662948U (en) Cold area road surface manhole cover
CN208777690U (en) A kind of reserved floor sealing hole template component of drainage pipeline
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN101956402B (en) Rear pouring band with prefabricated concrete edge sealing plate for basement outer shear wall
CN202000379U (en) Blocking device for reserved port on bottom plate of basement
CN205024733U (en) Fixing device for advanced water stop
CN205348421U (en) A bury formula waterproof construction for side wall movement joint
CN204491679U (en) A kind of ater-casting exterior wall plugging structure with elastic waterstop bar
CN205276721U (en) Roof drainage seals eaves mouth mounting structure
CN203113526U (en) Temporary fixing structure of rubber waterstop
CN220686520U (en) Waterproof construction is exempted from to wear by roofing slag layer blast pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 454000 Jiaozuo District, Henan city Feng Feng Office

Patentee after: LOMON BILLIONS GROUP Co.,Ltd.

Address before: 454191 west station, Henan, Jiaozuo Province, three km

Patentee before: Henan Billions Chemicals Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012