CN202466556U - Sand blocking box and sandbox dike - Google Patents
Sand blocking box and sandbox dike Download PDFInfo
- Publication number
- CN202466556U CN202466556U CN2012200726999U CN201220072699U CN202466556U CN 202466556 U CN202466556 U CN 202466556U CN 2012200726999 U CN2012200726999 U CN 2012200726999U CN 201220072699 U CN201220072699 U CN 201220072699U CN 202466556 U CN202466556 U CN 202466556U
- Authority
- CN
- China
- Prior art keywords
- sandbox
- sand
- retaining
- dike
- backplate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Artificial Fish Reefs (AREA)
Abstract
The utility model discloses a sand blocking box and a sandbox dike. The sand blocking box comprises a bottom board, a front surface board, a back surface board, a left side surface board, a right side surface board and a top cover board which are all made of reinforced concrete materials, wherein an inner cavity body of the sand blocking box is formed by surrounding the bottom board, the front surface board, the back surface board, the left side surface board, the right side surface board and the top cover board, and the inner cavity body is internally filled with sand. The sandbox dike is formed by detachably connecting multiple sand blocking boxes. According to the sand blocking box disclosed by the utility model, the sand in saltation-way advance can be efficiently and durably blocked; and in addition, the sandbox dike is formed by detachably connecting the multiple sand blocking boxes, thus the sandbox dike can be easily detached even the sandbox dike is embedded by the sand during a perennial use process, a new sandbox dike can be reassembled on a new sand surface, and the new sandbox dike can continuously play a role in blocking the sand.
Description
Technical field
The utility model relates to a kind of sand-protecting barrier setting, relates more specifically to a kind of retaining sandbox and sandbox dike of the sand that can durable interception advances with the saltation form.
Background technology
Desertification and control thereof are one of maximum and the most urgent problems of influence surface in the environment and development global problems.There are more than 100 countries and regions to have the desertification problem in the world.China is one of the most serious country of desertification in the world.Relate to west, northern territories such as Xinjiang, the Inner Mongol, Gansu, Ningxia, Shaanxi, Hebei, Shanxi, Liaoning, Beijing, Tianjin.Dust storm is to ecological environment, agricultural, forestry, animal husbandry, traffic, water conservancy, factory, mine, tourism, town and country construction, the commerce and trade logistics of China; Economic, cultural, social sustainable development and the people's productive life etc. cause great harm.How to strive to find conscientiously, the countermeasure and the means of efficient, lasting control wind erosion desertification (desertification), become the Chinese government and the west, northern numerous people is very great and urgent subject.
Desertification is to be the natural calamity of outstanding feature with the wind-sand activity.See that from fluid-mechanics point of view its essence is the result of stream motion.Stream is the mixed flow of the solid particle (grains of sand) of a kind of air-flow and carrying thereof, and its formation depends on the interaction of the physical medium of two kinds of different densities of the air and the sandy face of land.Wind gets in the air-flow and is handled upside down because wind makes the grains of sand break away from the face of land when the loose sandy face of land, causes the development of sand ground wind erosion, produces dust storm and moves, and stream occurs.
Dust storm motion has suspended, saltation, wriggling and move three kinds of citation forms in the top layer, is principal mode with the saltation.The saltation of the so-called grains of sand is meant that the grains of sand after receiving the wind-force effect of raising up to break away from the face of land to get into air-flow, just constantly obtain the momentum acceleration and advance from air-flow, and under the effect of grains of sand own wt, to fall rapidly with respect to very little acute angle of horizon.Because the density of air is much littler than the density of the grains of sand, the resistance that the grains of sand receive in motion process is less, when falling Shamian Island, still has sizable momentum.Therefore, the grains of sand itself that not only fall might rebound, and continue to bound forward, and because its percussion, and the entering jump of splashing of a part of grains of sand around can also causing to fall and break a little will cause a series of chain reaction like this.The grains of sand are done the motion of jump form so continuously, are called saltation.
A large amount of research of scientist shows, the strong wind sand of carrying under one's arms moves, i.e. the said stream of scientist mainly is to carry out pressing close to the height of surface, sand dune below 10 centimetres.Field inspection shows that also the sand amount overwhelming majority (more than 90%) of air-flow carrying is in the height on 30 centimetres on the sandy face of land, to pass through, and wherein concentrates in the airflow layer that is distributed in 0-10 centimetre (accounting for 80%) especially again.This shows that the dust storm motion is a kind of sand carrying phenomenon of ground proximity.Because the sand amount in the stream more than 90% is in the height on 30 centimetres on the face of land, to pass through, therefore adopt to exceed Shamian Island 20-30 centimetre sand-protecting barrier, just be enough to control the activity of sand dune surface wind sand drift.And set up sand-protecting barrier also is the more general technology of in the measure of sand fixing technology systems engineering, using.On the route that stream passed through, run into stopping of sand-protecting barrier, wind speed will be affected and reduce; The part of sand of carrying under one's arms will be deposited on sand-protecting barrier around; Hinder the saltation of the grains of sand with this, reduce the sedimentary loading of stream, thereby play the effect of control hazards of sand storms.The method of setting up sand-protecting barrier commonly used is with branch, faggot, stalk, gravel, clay, lath, wheat straw, moulds plate and similar material is provided with the various forms obstruction on Shamian Island; Change wind erosion aeolian accumulation environment; Slow down the direct effect of wind-force to the face of land; With control stream direction, speed, structure, reach the effect of fixing the sand, hinder sand, sediment trapping.Specific practice has:
1. straw checkerboard barrier sand-protecting barrier: wormwood is embedded in the sand, expose 10--15cm one section, make length and width and respectively be one meter grid, can prevent effectively that promptly drift sand from moving.Also available careless fence is a frame with timber, is embedded in the sand, is woven into net with wormwood in the wooden frame, and its height is more than one meter.Strong wind can pass in the grass net, and the sand that strong wind is carried under one's arms then is blocked in before the grass net.Straw checkerboard barrier and careless fence have a shortcoming, are exactly the life-span weak point, damage easily.
2. flush system sand-protecting barrier: utilize faggot, stalk, cobble, clay etc. comprehensively or band shape be tiled in husky table.Isolated wind contacts with husky table, though cause wind to cross and the effect of Sha Buqi.The tiling of grass straw can reach the original place tackling quicksand, the effect of protective plant growth.And dust storm evil area, wide vastness with type things such as stalks, is that lid is unequal to lid, separated at a distance from being unequal to, this has determined the humble of its total effect of defending and controlling sand.
3. vertical sand barrier: be divided into high vertical, low vertical.High vertical sand barrier: adopt high culm plant, directly lining out is on sand like reed, shrub branch, cornstalk and jowar stalk etc., and the degree of depth of imbedding in the sand bed is 30-50cm; Expose height more than 1 meter; Or these materials are weaved into the basketry piece, and nail is on wooden frame, and it is husky with choked flow to form high vertical sand barrier.Low vertical sand barrier: exceed Shamian Island 20-50cm, this type of also claims half concealed type sand-protecting barrier, the obstruction that manufacturing materials is made with straw, straw, soft stalk weeds etc.This kind mode is little to the grains of sand interception in the stream.
In preventing and fixing sand prior aries such as straw checkerboard barrier, flush system, high vertical, low vertical sand barrier, material therefor mainly is a vegetable matter, like stalk, wormwood, brush wood etc.; Both very easily addled; Application life is extremely short, and is regional in the dust storm evil because of these materials again, and the one, total amount is limited; The 2nd, the dust storm area just was starved of these plants originally, and can't large tracts of land use.Cut as cut in a large number, be used to build sand-protecting barrier, both can't satisfy the demand because of measuring less, more be as good as to cut the flesh to cure a boil.
Therefore, be necessary to provide a kind of improved sand-protecting barrier setting to overcome above-mentioned defective.
The utility model content
The purpose of the utility model provides the retaining sandbox and the sandbox dike of the sand that efficient, the durable interception of a kind of ability advances with the saltation form.
For realizing above-mentioned purpose; The utility model provides a kind of retaining sandbox; Base plate, front plate, backplate, Left-Hand Panel, right panel and lamina tecti that said retaining sandbox is processed by Reinforced Concrete Materials; Said base plate, front plate, backplate, Left-Hand Panel, right panel and lamina tecti enclose the inner chamber body that forms the retaining sandbox, are filled with sand in the said inner chamber body.
Preferably, be distributed with four perforation on the said base plate, be respectively equipped with two on said front plate and the said backplate and be connected voussoir, said connection voussoir is corresponding respectively to connect said perforation.
Preferably, the bottom of said base plate also is provided with two semi-circular groove along its width.
Preferably, respectively be provided with four first bolts hole on said front plate and the said backplate, respectively be provided with four second bolts hole on said Left-Hand Panel and the said right panel, corresponding said second bolt hole of said first bolt hole and connect through bolt.
Preferably, said Left-Hand Panel and said right panel are respectively the rectangular shape of band groove.
For realizing above-mentioned purpose, the utility model also provides a kind of sandbox dike, and said sandbox dike is removably connected by a plurality of retaining sandboxs and forms.
Preferably, removably connect through four connectors between every two adjacent retaining sandboxs.
Preferably, said connector comprises bolt and junction plate, and said bolt is removably connected on the said retaining sandbox, and said junction plate is removably connected to the bolt that is connected on two adjacent retaining sandboxs.
Compared with prior art, the retaining sandbox of the utility model is processed by Reinforced Concrete Materials, and Reinforced Concrete Materials is made up of sand, rubble, reinforcing bar and cement; These materials have matter heavily fortified point, durable, the strong characteristic of external force resistance (like high wind, severe cold, burning sun, salt marsh, blown sand impact etc.); Therefore make that the retaining sandbox is durable in use, and can tackle the sand that advances with the saltation form efficiently, and be filled with sand in the retaining sandbox; Be used to make the retaining sandbox and be used to fill the sand that keeps off sandbox and can gather materials on the spot in the desert region; Turn harm into good, thus with low cost, and the making of retaining sandbox is also very simple and easy.In addition; Because of a plurality of retaining sandboxs that removably connect are formed the sandbox dike, so, also can at an easy rate the sandbox dike be disassembled even the sandbox dike has been buried by sand in the process of long-term use; On new Shamian Island, re-assembly new sandbox dike, make it to continue to bring into play the function of retaining sand.
Through following description and combine accompanying drawing, it is more clear that the utility model will become, and these accompanying drawings are used to explain the embodiment of the utility model.
Description of drawings
Fig. 1 is the stereogram of the utility model retaining sandbox.
Fig. 2 is the sketch map of the utility model retaining sandbox.
Fig. 3 is the sketch map of the utility model sandbox dike.
The specific embodiment
With reference now to accompanying drawing, the embodiment of the utility model is described, in the accompanying drawing similarly the assembly label represent similar assembly.As stated, the utility model provides a kind of retaining sandbox and sandbox dike, the sand that said retaining sandbox and efficient, the durable interception of sandbox dike ability are advanced with the saltation form.
Please refer to Fig. 1-3, retaining sandbox 1 is long 2.50m, wide 0.80m, and the cuboid facility of high 1.00m, it comprises base plate 11, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15 and lamina tecti 16.Base plate 11, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15 and lamina tecti 16 are processed by Reinforced Concrete Materials.Retaining sandbox 1 has an inner chamber body 17, and inner chamber body 17 is enclosed by base plate 11, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15 and lamina tecti 16 and forms.Be filled with sand in the inner chamber body 17.
Be distributed with four rectangle perforation 111 on the base plate 11, the bottom of base plate 11 also is provided with two semi-circular groove 112 along its width, is used for tying up dress steel cable.The surface of base plate 11 is provided with two circular-arc protuberance bodies 113.
Respectively be provided with four first bolts hole 121 on front plate 12 and the backplate 13.The lower edge of front plate 12 and backplate 13 is extended with two towards said base plate 11 respectively and is connected voussoir 122.Connect voussoir 122 difference corresponding inserted in perforation 111, to connect on front plate 12, backplate 13 to the base plate 11.Also respectively be provided with two circular holes 123 on front plate 12 and the backplate 13, be used for tying up dress steel cable.
Left-Hand Panel 14 is respectively the rectangular shape into the band groove with right panel 15.Respectively being provided with four second bolts hole, 141, the first bolts hole, 121 corresponding second bolts hole and 141 on Left-Hand Panel 14 and the right panel 15 connects through bolt 18.
Lamina tecti 16 is provided with four through holes 161, is used for tying up dress steel cable.
The manufacturing process of retaining sandbox 1 is following: the first step: process template.The template of the reinforced concrete plate of the base plate 11 that constitutes cuboid retaining sandbox 1, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15, lamina tecti 16 is processed in design pattern according to the rules, specification, requirement respectively.Second step: process precast plate.According to design pattern and specification, with requirements such as material and match ratios thereof; Use cement, sand, rubble, reinforcing bar to be material, process the prefabricated chunk of the reinforced concrete plate of the base plate 11 that constitutes cuboid retaining sandbox 1, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15, lamina tecti 16 respectively.The 3rd step: aforementioned prefabricated chunk is assembled into retaining sandbox 1.Press the utility model pattern and specification requirement,, the cuboid box shape facility that can load sand is assembled, is coupled to each prefabricated chunk of steel concrete that constitutes retaining sandbox 1 with bolt 18 and pressing plate thereof.The 4th step: the filling sand is worn iron wire then in retaining sandbox 1.When sand be filled to front plate 12 and backplate 13 on circular hole 123 height such as grade the time be regarded as filling.With four iron leg lines, make four circles respectively.After the circle flattening, pass four through holes 161 on the lamina tecti 16 respectively.At the bottom of the plate face and plate of lamina tecti 16, with the iron wire circle that flattens, each turn-knob goes out four circles, and is one group (circle on the plate face is as hanging circle) with two circles.Lamina tecti 16 hung face on retaining sandbox 1 about 30cm.With two bundles of iron wires, after the end of a thread penetrates from the circular hole 123 of front plate 12 (or backplate 13) respectively, pass and hang two groups of circles that face under 16 of lamina tectis on the retaining sandbox 1, the circular hole 123 from backplate 13 (or front plate 12) passes again.Put down lamina tecti 16, it is inserted in the position of retaining sandbox 1 preparatory caving cover plate 16.Iron wire is pulled out the back tension, after a knot is pricked at the place of appearing, cut off.So far, sandbox is processed.
During use, can will keep off sandbox 1 making and become not homomorphs according to different use targets, like the sandbox dike of tight structure type and the sandbox dike of the trapezoidal formula of cross section etc.The sandbox dike of tight structure type is formed through connector 19 connections by a plurality of retaining sandboxs 1 side by side.Connect through four connectors 19 between two adjacent retaining sandboxs 1.Connector 19 comprises bolt 18 and junction plate 191.On the front plate 12 that bolt 18 is removably connected to retaining sandbox 1 and the backplate 13, and junction plate 191 is removably connected to the bolt 18 that is connected on two adjacent front plate 12 and adjacent two backplates 13.The sandbox dike of the trapezoidal formula of cross section is then formed through connector 19 connections by a plurality of retaining sandboxs 1 side by side and after piling up, and connected mode is with the sandbox dike of aforementioned close structural type, so repeat no more.
Because constituting base plate 11, front plate 12, backplate 13, Left-Hand Panel 14, right panel 15 and the lamina tecti 16 of retaining sandbox 1 is processed by Reinforced Concrete Materials; Reinforced Concrete Materials is made up of sand, rubble, reinforcing bar and cement; When making retaining sandbox 1; Except that need rubble and little cement, reinforcing bar, main and peak discharge is used, be exactly almost be available anywhere, the sand in the dust storm evil area of use without compensation.Therefore, can gather materials on the spot, with husky sand control, turn harm into good.And these materials all are that matter is hard, durable, the strong material of external force resistance (high wind, blown sand impact, severe cold, burning sun, salt marsh etc.).Thereby the retaining sandbox 1 that these materials are made is durable in use.Retaining sandbox 1 is through the detachable organic assembling of connector 19, thus just can form several kilometers, tens kilometers, the long sandbox dike of hundreds of kilometer by making in the very short time, efficiently sediment trapping, hold sand, fix the sand.The sand that retaining sandbox 1 inner chamber is loaded, the change of being stale-proof, quality is heavy, all by the tight parcel of reinforced concrete plate, makes retaining sandbox 1 not ruin because of building materials addle to go bad.At sediment trapping, hold sand, can bring into play efficient, stable, permanent, effect reliably in fixing the sand.When making tight structure type sandbox dike, the trapezoidal formula sandbox of cross section dike; Only need to make common special equipment, the common handling facilities of reinforced concrete prefabricated board piece; And supporting haulage vehicle assists the transportation of building materials, the processing and assembling, the filling of sand of reinforced concrete plate; The dress of retaining sandbox hangs, transports, connects, the construction making of sandbox dike.Thereby the sandbox dike can make easily and fast, safely in dust storm evil area and making uses.In the leeward area of sandbox dike, can improve survival rate, the retention of the grass of planting trees greatly.Thereby dust storm evil problem fundamentally is curbed and even solves.
As stated, because said retaining sandbox 1 is processed by Reinforced Concrete Materials, Reinforced Concrete Materials is made up of sand, rubble, reinforcing bar and cement; These materials have matter heavily fortified point, durable, the strong characteristic of external force resistance (like high wind, severe cold, burning sun, salt marsh, blown sand impact etc.); Therefore make that the retaining sandbox is durable in use, and can tackle the sand that advances with the saltation form efficiently, and be filled with sand in the retaining sandbox; Be used to make the retaining sandbox and be used to fill the sand that keeps off sandbox and can gather materials on the spot in the desert region; Turn harm into good, thus with low cost, and the making of retaining sandbox is also very simple and easy.In addition; Because of a plurality of retaining sandboxs that removably connect 1 are formed the sandbox dike, so, also can at an easy rate the sandbox dike be disassembled even the sandbox dike has been buried by sand in the process of long-term use; On new Shamian Island, re-assembly new sandbox dike, make it to continue to bring into play the function of retaining sand.
More than combine most preferred embodiment that the utility model is described, but the utility model is not limited to the embodiment of above announcement, and should contains various modification, equivalent combinations of carrying out according to the essence of the utility model.
Claims (8)
1. one kind is kept off sandbox; It is characterized in that: base plate, front plate, backplate, Left-Hand Panel, right panel and lamina tecti that said retaining sandbox is processed by Reinforced Concrete Materials; Said base plate, front plate, backplate, Left-Hand Panel, right panel and lamina tecti enclose the inner chamber body that forms the retaining sandbox, are filled with sand in the said inner chamber body.
2. retaining sandbox as claimed in claim 1 is characterized in that: be distributed with four perforation on the said base plate, be respectively equipped with two on said front plate and the said backplate and be connected voussoir, said connection voussoir is corresponding respectively to connect said perforation.
3. retaining sandbox as claimed in claim 2 is characterized in that: the bottom of said base plate also is provided with two semi-circular groove along its width.
4. retaining sandbox as claimed in claim 1; It is characterized in that: respectively be provided with four first bolts hole on said front plate and the said backplate; Respectively be provided with four second bolts hole on said Left-Hand Panel and the said right panel, corresponding said second bolt hole of said first bolt hole and connect through bolt.
5. retaining sandbox as claimed in claim 1 is characterized in that: said Left-Hand Panel and said right panel are respectively the rectangular shape of band groove.
6. sandbox dike, it is characterized in that: said sandbox dike is removably connected by a plurality of retaining sandboxs as claimed in claim 1 and forms.
7. sandbox dike as claimed in claim 6 is characterized in that: removably connect through four connectors between every two adjacent retaining sandboxs.
8. sandbox dike as claimed in claim 7 is characterized in that: said connector comprises bolt and junction plate, and said bolt is removably connected on the said retaining sandbox, and said junction plate is removably connected to the bolt that is connected on two adjacent retaining sandboxs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200726999U CN202466556U (en) | 2012-02-29 | 2012-02-29 | Sand blocking box and sandbox dike |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200726999U CN202466556U (en) | 2012-02-29 | 2012-02-29 | Sand blocking box and sandbox dike |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202466556U true CN202466556U (en) | 2012-10-03 |
Family
ID=46914724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200726999U Expired - Lifetime CN202466556U (en) | 2012-02-29 | 2012-02-29 | Sand blocking box and sandbox dike |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202466556U (en) |
-
2012
- 2012-02-29 CN CN2012200726999U patent/CN202466556U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101502223A (en) | Slope soil-establishing greening apparatus and method | |
CN105874959A (en) | Edge slope vegetation ecological restoration method and system | |
CN205369274U (en) | Civil engineering structure of complete domatic afforestation worker method in rock matter abrupt slope | |
US11700800B2 (en) | Protective tree tube, method, and revetment using tree contained in same | |
CN202509482U (en) | Sand stop grid and sandbox grid embankment wall | |
CN101580305A (en) | Wetland governance method for improving ecological environmental in reservoir falling zone | |
CN105532228A (en) | Water-saving planting method for sand-binding green plants | |
CN111296160B (en) | Method for rapidly planting trees in front edge area for repairing vegetation on windward slope of island | |
CN105075792A (en) | Earth-rock mountain region low-interference artificial afforestation and soil preparation method | |
CN102523970A (en) | Quick ecological rehabilitation method for steep rock slope | |
CN204326083U (en) | A kind of greening structure of rock slope is arranged | |
CN105544567B (en) | A kind of civil engineering structure of the full slope greening engineering method of steep rocky slope | |
CN204466322U (en) | Steep high rock slope hang type greening structure | |
CN103061310A (en) | Novel ecological habitat revetment | |
CN210184018U (en) | Strong acid heavy metal mine stope rock slope ecological restoration plant growth bag structure | |
CN202466556U (en) | Sand blocking box and sandbox dike | |
CN109644762A (en) | A kind of feeding sacsaoul sand-fixation forest low-density planting and establishing method of rain | |
CN208387441U (en) | A kind of river falling zone vegetation cultivation system | |
CN110144849A (en) | A kind of hung type greening plate and rock side slope ecological slope protection system | |
JPS61137922A (en) | Sheathing work for slope | |
CN214628687U (en) | Straw curtain for lawn cultivation | |
CN205546463U (en) | Ecological recovery system of slope vegetation | |
CN214783600U (en) | Compound ecological revetment | |
CN210857107U (en) | Hanging type greening plate and rock slope ecological slope protection system | |
O’Connell | Coastal dune protection and restoration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121003 |
|
CX01 | Expiry of patent term |