CN202423956U - Hoisting device for power transmission line maintenance - Google Patents
Hoisting device for power transmission line maintenance Download PDFInfo
- Publication number
- CN202423956U CN202423956U CN 201120543541 CN201120543541U CN202423956U CN 202423956 U CN202423956 U CN 202423956U CN 201120543541 CN201120543541 CN 201120543541 CN 201120543541 U CN201120543541 U CN 201120543541U CN 202423956 U CN202423956 U CN 202423956U
- Authority
- CN
- China
- Prior art keywords
- support rod
- boom
- upper bearing
- fixed
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种输电线路维修用吊装装置,包括底座和固定在底座上的支撑杆,吊臂的一端固定有连轴,吊臂通过连轴设置在支撑杆顶部,另一端设置有滑轮,在底座上设置有滚轮,钢丝绳的一端设置有挂钩,另一端绕过吊壁上的滑轮和吊臂上的过轮固定在滚轮上,滚轮的滚轮轴与减速电机连接。所述吊壁与支撑杆是活动连接,即吊壁与支撑杆之间设置有上部轴承,上部轴承外圈与支撑杆固联,上部轴承内圈与连轴固联,在上部轴承下部的支撑杆上设置有锁紧螺栓,锁紧螺栓穿过支撑杆与连轴接触。本实用新型有以下优点:将需要吊装的电力工具挂在本实用新型的挂钩上,由于设置在挂钩上的钢丝绳依次绕过吊臂上的滑轮和过轮固定在底座上的滚轮上,启动连接在滚轮轴上的减速电机,就可以带动钢丝绳向上提升工具,方便起吊电力工具。同时在支撑杆顶部与吊臂之间设置有上部轴承,支撑杆上部与支撑臂之间设置有下部轴承,方便吊臂根据具体的工作状况旋转方向,而且多节支撑杆组件可以适应不同高度的维修作业,在吊臂上设置多个滑轮,可以通过调节钢丝绳绕过不同的滑轮和过轮来调节挂钩与支撑杆之间的距离,从而适应不同方向的电力工具的吊装工作。
A hoisting device for transmission line maintenance, including a base and a support rod fixed on the base, one end of the boom is fixed with a shaft, the boom is arranged on the top of the support rod through the shaft, and the other end is provided with a pulley, and the base is set There are rollers, one end of the wire rope is provided with a hook, and the other end is fixed on the rollers by going around the pulley on the hanging wall and the passing wheel on the boom, and the roller shaft of the rollers is connected with the reduction motor. The hanging wall and the supporting rod are movable connections, that is, an upper bearing is arranged between the hanging wall and the supporting rod, the outer ring of the upper bearing is fixedly connected with the supporting rod, the inner ring of the upper bearing is fixedly connected with the shaft, and the support at the lower part of the upper bearing A locking bolt is arranged on the rod, and the locking bolt passes through the support rod and contacts with the connecting shaft. The utility model has the following advantages: hang the power tool that needs to be hoisted on the hook of the utility model, since the steel wire rope set on the hook is fixed on the roller on the base by passing around the pulley on the boom and the passing wheel in turn, the connection is started. The deceleration motor on the roller shaft can drive the wire rope to lift the tool upwards, which is convenient for lifting the power tool. At the same time, an upper bearing is provided between the top of the support rod and the boom, and a lower bearing is provided between the upper part of the support rod and the support arm to facilitate the rotation direction of the boom according to the specific working conditions, and the multi-section support rod assembly can adapt to different heights For maintenance work, multiple pulleys are set on the boom, and the distance between the hook and the support rod can be adjusted by adjusting the wire rope to bypass different pulleys and passing wheels, so as to adapt to the hoisting work of power tools in different directions.
Description
技术领域 technical field
本实用新型涉及一种输电线路维修辅助装置,具体地说涉及一种输电线路维修时用的吊装工具。 The utility model relates to an auxiliary device for maintenance of transmission lines, in particular to a lifting tool for maintenance of transmission lines. the
背景技术 Background technique
在电力线路维修及改造时,需要更换和增加一些成套设备,这些设备的重量较大,需要通过吊装工具才能举升到一定的高度。而电力设备以及变电站受地理空间的限制,不适合在现场使用吊装车辆。因此多由人工起吊这些设备,导致工作效率低,使得电力线路维修时间长,影响电力线路的供电,而且采用人工起吊,安全性差。 During the maintenance and transformation of power lines, some complete sets of equipment need to be replaced and added. These equipment are heavy and need to be lifted to a certain height by lifting tools. However, power equipment and substations are limited by geographical space, so it is not suitable to use hoisting vehicles on site. Therefore, these devices are mostly lifted manually, resulting in low work efficiency, long maintenance time of the power line, affecting the power supply of the power line, and manual lifting is poor in safety. the
发明内容 Contents of the invention
本实用新型的目的在于克服上述不足提供一种输电线路维修用吊装装置。 The purpose of this utility model is to provide a lifting device for transmission line maintenance to overcome the above-mentioned disadvantages. the
本实用新型的目的通过以下技术方案来实现: The purpose of this utility model is achieved through the following technical solutions:
一种输电线路维修用吊装装置,包括底座和固定在底座上的支撑杆,吊臂的一端固定有连轴,吊臂通过连轴设置在支撑杆顶部,另一端设置有滑轮,在底座上设置有滚轮,钢丝绳的一端设置有挂钩,另一端绕过吊壁上的滑轮和吊臂上的过轮固定在滚轮上,滚轮的滚轮轴与减速电机连接。 A hoisting device for transmission line maintenance, including a base and a support rod fixed on the base, one end of the boom is fixed with a shaft, the boom is arranged on the top of the support rod through the shaft, the other end is provided with a pulley, and the base is set There are rollers, one end of the wire rope is provided with a hook, and the other end is fixed on the rollers by going around the pulley on the hanging wall and the overwheel on the boom, and the roller shaft of the rollers is connected with the reduction motor.
上述输电线路维修用吊装装置,所述吊壁与支撑杆是活动连接,即吊壁与支撑杆之间设置有上部轴承,上部轴承外圈与支撑杆固联,上部轴承内圈与连轴固联,在上部轴承下部的支撑杆上设置有锁紧螺栓,锁紧螺栓穿过支撑杆与连轴接触。 In the above-mentioned hoisting device for maintenance of power transmission lines, the suspension wall and the support rod are movably connected, that is, an upper bearing is arranged between the suspension wall and the support rod, the outer ring of the upper bearing is fixedly connected to the support rod, and the inner ring of the upper bearing is fixedly connected to the connecting shaft. A locking bolt is arranged on the supporting rod at the lower part of the upper bearing, and the locking bolt passes through the supporting rod to contact with the connecting shaft. the
上述输电线路维修用吊装装置,所述支撑杆是由多节支撑杆组件组合固装而成,轴承设置在顶端支撑杆组件上。 In the aforementioned hoisting device for maintenance of transmission lines, the support rod is formed by combining and fixing multiple support rod assemblies, and the bearing is arranged on the top support rod assembly. the
上述输电线路维修用吊装装置,所述吊臂与支撑杆之间还设置有支撑臂,支撑臂与顶端支撑杆组件之间还设置有下部轴承,下部轴承内圈与顶端支撑杆组件固联,支撑臂固装在下部轴承外圈上。 In the lifting device for transmission line maintenance, a support arm is further provided between the boom and the support rod, and a lower bearing is further provided between the support arm and the top support rod assembly, and the inner ring of the lower bearing is fixedly connected to the top support rod assembly. The support arm is fixed on the outer ring of the lower bearing. the
上述输电线路维修用吊装装置,在吊臂上水平方向的不同位置上至少设置两个滑轮。 The above-mentioned hoisting device for maintenance of transmission lines is provided with at least two pulleys at different positions in the horizontal direction on the boom. the
采用上述技术方案,本实用新型有以下优点:将需要吊装的电力工具挂在本实用新型的挂钩上,由于设置在挂钩上的钢丝绳依次绕过吊臂上的滑轮和过轮固定在底座上的滚轮上,启动连接在滚轮轴上的减速电机,就可以带动钢丝绳向上提升工具,方便起吊电力工具。同时在支撑杆顶部与吊臂之间设置有上部轴承,支撑杆上部与支撑臂之间设置有下部轴承,方便吊臂根据具体的工作状况旋转方向,而且多节支撑杆组件可以适应不同高度的维修作业,在吊臂上设置多个滑轮,可以通过调节钢丝绳绕过不同的滑轮和过轮来调节挂钩与支撑杆之间的距离,从而适应不同方向的电力工具的吊装工作。 By adopting the above-mentioned technical scheme, the utility model has the following advantages: the power tool that needs to be hoisted is hung on the hook of the utility model, since the steel wire rope arranged on the hook goes around the pulley on the boom and the pulley and is fixed on the base On the roller, start the reduction motor connected on the roller shaft, and the steel wire rope can be driven to lift the tool upwards, which is convenient for lifting the power tool. At the same time, an upper bearing is provided between the top of the support rod and the boom, and a lower bearing is provided between the upper part of the support rod and the support arm to facilitate the rotation direction of the boom according to the specific working conditions, and the multi-section support rod assembly can adapt to different heights For maintenance operations, multiple pulleys are set on the boom, and the distance between the hook and the support rod can be adjusted by adjusting the wire rope to go around different pulleys and passing wheels, so as to adapt to the hoisting work of power tools in different directions. the
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model. the
具体实施方式 Detailed ways
如图1所示的一种输电线路维修用吊装装置,包括底座13和固定在底座上的支撑杆10,吊臂7的一端固定有连轴15,吊臂7通过连轴15设置在支撑杆顶部,另一端设置有滑轮2,在底座13上设置有滚轮11,钢丝绳3的一端设置有挂钩1,另一端绕过吊壁上的滑轮2和吊臂上的过轮6固定在滚轮11上,滚轮11的滚轮轴与减速电机12连接。所述支撑杆是由多节支撑杆组件10组合固装而成,轴承设置在顶端支撑杆组件8上,以适应不同高度的维修作业。所述吊臂7与支撑杆之间还设置有支撑臂5,支撑臂5与顶端支撑杆组件8之间还设置有下部轴承9,下部轴承内圈与顶端支撑杆组件8固联,支撑臂5固装在下部轴承外圈上。这样的结构方便吊臂根据具体的工作状况旋转方向。在吊臂上水平方向的不同位置上至少设置两个滑轮2、4,达到平稳起吊的目的。
A hoisting device for transmission line maintenance as shown in Figure 1, comprising a
本实用新型的吊壁7与支撑杆是活动连接,即吊壁7与支撑杆之间设置有上部轴承,上部轴承外圈与支撑杆固联,上部轴承内圈与连轴固联,在上部轴承下部的支撑杆上设置有锁紧螺栓14,锁紧螺栓14穿过支撑杆与连轴接触。
The
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120543541 CN202423956U (en) | 2011-12-22 | 2011-12-22 | Hoisting device for power transmission line maintenance |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120543541 CN202423956U (en) | 2011-12-22 | 2011-12-22 | Hoisting device for power transmission line maintenance |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202423956U true CN202423956U (en) | 2012-09-05 |
Family
ID=46748682
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201120543541 Expired - Fee Related CN202423956U (en) | 2011-12-22 | 2011-12-22 | Hoisting device for power transmission line maintenance |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202423956U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104229651A (en) * | 2014-08-26 | 2014-12-24 | 高威 | Elevator device |
| CN104953507A (en) * | 2015-06-30 | 2015-09-30 | 国网山东招远市供电公司 | Device and method for lifting wire during distribution line construction |
| CN107646223A (en) * | 2017-09-28 | 2018-02-02 | 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) | A kind of original soil modification method and its device suitable for heavy salinized ground |
| CN108203059A (en) * | 2018-03-28 | 2018-06-26 | 合肥云智物联科技有限公司 | A kind of boom hoisting of power equipment maintaining |
| CN110429512A (en) * | 2019-09-03 | 2019-11-08 | 国网河南省电力公司宜阳县供电公司 | Suspension device for transmission line |
| CN112373864A (en) * | 2020-09-29 | 2021-02-19 | 汤树林 | Modular fracturing sand storage and conveying system |
-
2011
- 2011-12-22 CN CN 201120543541 patent/CN202423956U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104229651A (en) * | 2014-08-26 | 2014-12-24 | 高威 | Elevator device |
| CN104953507A (en) * | 2015-06-30 | 2015-09-30 | 国网山东招远市供电公司 | Device and method for lifting wire during distribution line construction |
| CN107646223A (en) * | 2017-09-28 | 2018-02-02 | 新疆农业科学院土壤肥料与农业节水研究所(新疆维吾尔自治区新型肥料研究中心) | A kind of original soil modification method and its device suitable for heavy salinized ground |
| CN108203059A (en) * | 2018-03-28 | 2018-06-26 | 合肥云智物联科技有限公司 | A kind of boom hoisting of power equipment maintaining |
| CN110429512A (en) * | 2019-09-03 | 2019-11-08 | 国网河南省电力公司宜阳县供电公司 | Suspension device for transmission line |
| CN112373864A (en) * | 2020-09-29 | 2021-02-19 | 汤树林 | Modular fracturing sand storage and conveying system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204569220U (en) | Wind tower accessory loader machine | |
| CN202423956U (en) | Hoisting device for power transmission line maintenance | |
| CN105003082A (en) | Glass curtain wall mounting equipment and glass curtain mounting method | |
| CN204474187U (en) | A kind of wall type turning crane | |
| CN205577896U (en) | Novel high -efficient mechatronic workover machine | |
| CN205114894U (en) | Manual formula wall type swing crane; derrick | |
| CN201722095U (en) | Movable small crane flexible in use | |
| CN201882804U (en) | Hoisting tool for maintenance of electric power line | |
| CN205855857U (en) | A kind of double-beam cantilever crane | |
| CN203295132U (en) | Lifting device for high-rise operation | |
| CN202089704U (en) | Cantilever crane | |
| CN102992203B (en) | Simple hoisting device for steel structure bridge installation | |
| CN107758579A (en) | A kind of Multifunctional aloft-work platform | |
| CN206427945U (en) | A kind of adjustable hanging apparatus for building | |
| CN204848025U (en) | Walking boom crane | |
| CN204848016U (en) | Portable cantilever crane of platform truck | |
| CN204057888U (en) | A kind of Multifunction high-altitude operation platform | |
| CN202449763U (en) | Simple pneumatic crane | |
| CN202864675U (en) | Shaft-type part hoisting tool | |
| CN202279641U (en) | Crank axle telpher | |
| CN204802839U (en) | Jacking equipment for building | |
| CN204125069U (en) | Safety of tower crane protects jacking system automatically | |
| CN107235422A (en) | It is exclusively used in the crane device of lifting steel pipes and welding | |
| CN203728448U (en) | Light mounting and dismounting frame for tower crane | |
| CN203021213U (en) | Rotary one-arm crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE Effective date: 20140128 Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELECTRIC POWER COMPANY Effective date: 20140128 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| C56 | Change in the name or address of the patentee |
Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE Free format text: FORMER NAME: HENAN ELECTRIC POWER COMPANY, JIAOZUO POWER SUPPLY COMPANY |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 454150 JIAOZUO, HENAN PROVINCE TO: 100031 XICHENG, BEIJING |
|
| CP01 | Change in the name or title of a patent holder |
Address after: 454150 No. 299 South Tower Road, Henan, Jiaozuo Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co. Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo Patentee before: Jiaozuo Power Supply Company, Henan Electric Power Corp. |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20140128 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee after: State Grid Corporation of China Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co. Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo Patentee before: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20181222 |