CN213171204U - Construction equipment hoisting device - Google Patents

Construction equipment hoisting device Download PDF

Info

Publication number
CN213171204U
CN213171204U CN202021265104.2U CN202021265104U CN213171204U CN 213171204 U CN213171204 U CN 213171204U CN 202021265104 U CN202021265104 U CN 202021265104U CN 213171204 U CN213171204 U CN 213171204U
Authority
CN
China
Prior art keywords
push rod
electric push
rolling
wire rope
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021265104.2U
Other languages
Chinese (zh)
Inventor
李治军
邓维界
王文旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Dingjia Construction Engineering Co ltd
Original Assignee
Guangdong Dingjia Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Dingjia Construction Engineering Co ltd filed Critical Guangdong Dingjia Construction Engineering Co ltd
Priority to CN202021265104.2U priority Critical patent/CN213171204U/en
Application granted granted Critical
Publication of CN213171204U publication Critical patent/CN213171204U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction equipment hoist device, including base, fixed stay, first electric push rod and positioning mechanism, the fixed stay is installed on the base, first electric push rod is located the fixed stay top, and first electric push rod one end passes through loose axle swing joint with the fixed stay, the guide pulley is installed to the extension end of first electric push rod, be connected with first haulage wire rope on the guide pulley, first haulage wire rope one end is connected with the couple, and the first rolling frame that is equipped with on the first haulage wire rope other end and the first electric push rod is connected. The utility model discloses a set up positioning mechanism to be connected positioning mechanism through second traction wire rope and second rolling frame, when the hoist and mount material, can articulate couple and material, then utilize positioning fixture on the positioning mechanism to press from both sides the material both sides tight fixed, fixed effectual, can guarantee that the in-process material hoist and mount that rises is stable, avoids taking place to rock, and the security is high.

Description

Construction equipment hoisting device
Technical Field
The utility model relates to a relevant technical field of construction specifically is a construction equipment hoist device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction site is called a construction site or construction site, and is also called a construction site, and construction materials need to be hoisted by utilizing the hoisting device in the construction process.
However, the existing hoisting device has a huge structure, and the hoisted material cannot be fixed in the hoisting process, so that the hoisting process can generate large shaking, the stability is not high, the safety is not good, safety accidents are easy to happen, and the hoisting device needs to be improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction equipment hoist device to current hoist device structure that mentions in solving above-mentioned background art is huge, and can not fix the material of hoist and mount among the hoist and mount process, leads to hoist and mount in-process can produce great rocking, and stability is not high, and the security is not good, takes place the problem of incident easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction equipment hoist device, includes base, fixed stay, first electric push rod and positioning mechanism, and fixed stay installs on the base, first electric push rod is located the fixed stay top, and just first electric push rod one end passes through loose axle swing joint with fixed stay, the guide pulley is installed to the extension end of first electric push rod, be connected with first traction wire rope on the guide pulley, first traction wire rope one end is connected with the couple, and just first traction wire rope other end is connected with the first rolling frame that is equipped with on the first electric push rod, first electric push rod lower extreme is equipped with the second rolling frame, be connected through driving belt between first rolling frame and the second rolling frame, positioning mechanism is located fixed stay one side, and positioning mechanism pulls wire rope through the second and is connected with the second rolling frame.
Preferably, positioning mechanism includes second electricity push rod and positioning fixture, second electricity push rod one end and positioning fixture fixed connection, and the pulley is installed to the second electricity push rod other end, set up the spout that matches with the pulley on the fixed stay lateral wall.
Preferably, the two sides of the positioning fixture are both provided with limiting bolts, the limiting bolts are in threaded connection with the positioning fixture, and one end of each limiting bolt is fixedly connected with a limiting plate.
Preferably, rotate on the first rolling frame and install first rolling axle, first traction wire rope winding sets up on first rolling axle, the motor is installed to first rolling frame one side, the output shaft and the first rolling axle fixed connection of motor, first rolling axle one end runs through first rolling frame and is connected with driving belt through the belt pulley.
Preferably, the second winding frame is fixedly installed at the lower end of the first electric push rod, a second winding shaft is rotatably installed on the second winding frame, the second traction steel wire rope is wound on the second winding shaft, and one end of the second winding shaft penetrates through the second winding frame and is sleeved with the transmission belt through a belt pulley.
Preferably, the fixing bases are installed on two sides of the fixing support, the air cylinder is installed on the fixing bases, and the extending end of the air cylinder is connected with the side wall of the first electric push rod.
The utility model provides a construction equipment hoist device possesses following beneficial effect:
(1) the utility model discloses a set up positioning mechanism to be connected positioning mechanism through second traction wire rope and second rolling frame, when the hoist and mount material, can articulate couple and material, then utilize positioning fixture on the positioning mechanism to press from both sides the material both sides tight fixed, fixed effectual, can guarantee that the in-process material hoist and mount that rises is stable, avoids taking place to rock, and the security is high.
(2) The utility model discloses a be connected first rolling frame and second rolling frame through driving belt, when the material of hoist and mount is promoted, utilize the motor to drive first rolling frame rolling, second rolling frame carries out the rolling through the synchronous rotation of driving belt transmission simultaneously, promotes positioning mechanism in step, easy operation, convenient to use.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic structural view of the positioning fixture of the present invention;
fig. 4 is the utility model discloses a first rolling frame and second rolling frame structure schematic diagram.
In the figure: 1. a base; 2. fixing a strut; 3. a first electric push rod; 4. a cylinder; 5. a movable shaft; 6. A guide wheel; 7. hooking; 8. a first traction wire rope; 9. a drive belt; 10. a second traction wire rope; 11. a second electric push rod; 12. positioning a clamp; 13. a pulley; 14. a chute; 15. a first winding frame; 16. a second winding frame; 17. a fixed seat; 18. a limit bolt; 19. a motor; 20. a first winding shaft; 21. a limiting plate; 22. and a second winding shaft.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: a hoisting device for construction equipment comprises a base 1, a fixed support column 2, a first electric push rod 3 and a positioning mechanism, wherein the fixed support column 2 is arranged on the base 1, the first electric push rod 3 is positioned at the top end of the fixed support column 2, one end of the first electric push rod 3 is movably connected with the fixed support 2 through a movable shaft 5, the extending end of the first electric push rod 3 is provided with a guide wheel 6, a first traction steel wire rope 8 is connected on the guide wheel 6, one end of the first traction steel wire rope 8 is connected with a hook 7, and the other end of the first traction steel wire rope 8 is connected with a first winding frame 15 arranged on the first electric push rod 3, the lower end of the first electric push rod 3 is provided with a second winding frame 16, the first winding frame 15 is connected with the second winding frame 16 through a transmission belt 9, the positioning mechanism is positioned on one side of the fixed support column 2 and is connected with the second winding frame 16 through a second traction steel wire rope 10.
Positioning mechanism includes second electric push rod 11 and positioning fixture 12, 11 one end of second electric push rod and positioning fixture 12 fixed connection, and pulley 13 is installed to the 11 other ends of second electric push rod, set up the spout 14 that matches with pulley 13 on the 2 lateral walls of fixed stay, can make positioning mechanism pull wire rope 10 when pulling by the second, utilize pulley 13 to move up along spout 14, guarantee the stability of removal.
Positioning fixture 12 both sides all are equipped with limit bolt 18, limit bolt 18 and positioning fixture 12 threaded connection, and limit bolt 18 one end fixedly connected with limiting plate 21, can utilize limit bolt 18 and limiting plate 21 to carry out the centre gripping fixed to the material of hoist and mount, prevent that the material of hoist and mount from taking place to rock in the transportation.
Rotate on the first rolling frame 15 and install first rolling axle 20, first traction wire rope 8 winding sets up on first rolling axle 20, motor 19 is installed to first rolling frame 15 one side, the output shaft and the first rolling axle 20 fixed connection of motor 19, first rolling axle 20 one end is run through first rolling frame 15 and is connected with driving belt 9 through the belt pulley, can utilize motor 19 to drive first rolling axle 20 and rotate, drives driving belt 9 and rotates when first rolling axle 20 pivoted to can utilize driving belt 9 to drive second rolling frame 16 and carry out work in step.
Second rolling frame 16 fixed mounting is at first electric push rod 3 lower extreme, rotate on the second rolling frame 16 and install second rolling axle 22, second traction cable 10 twines and sets up on second rolling axle 22, second rolling axle 22 one end is run through second rolling frame 16 and is cup jointed through belt pulley and driving belt 9, can utilize driving belt 9 to rotate and drive second rolling axle 22 and rotate, realizes the work of receiving and releasing second traction cable 10.
Fixing bases 17 are installed on two sides of the fixing support 2, an air cylinder 4 is installed on the fixing bases 17, the extending end of the air cylinder 4 is connected with the side wall of the first electric push rod 3, the air cylinder 4 can be used for extending, therefore, the first electric push rod 3 is lifted, and the lifting height is convenient to improve.
It should be noted that, when the building equipment hoisting device works, the motor 19 can be used for rotating reversely, so that the first winding frame 15 performs paying-off operation, the hook 7 moves downwards, when the first winding shaft 20 on the first winding frame 15 rotates, the driving belt 9 can rotate to drive the second winding shaft 22 to rotate and perform paying-off operation, so that the second traction steel wire rope 10 extends, so that the positioning mechanism moves downwards along the chute 14 on the fixed support column 2 through the pulley 13, then the hook 7 is hooked with a material to be hoisted, meanwhile, the hoisting material is clamped and fixed by the limiting bolt 18 and the limiting plate 21 on the positioning clamp 12, then the motor 19 rotates forwards, the first winding rotation is driven to wind the first traction steel wire rope 8, so that the hoisted material moves upwards, and when the first winding shaft 20 rotates, the driving belt 9 can rotate to drive the second winding shaft 22 to rotate to wind the second traction steel wire rope 10 The second electric push rod 11 moves upwards along the sliding groove 14 on the fixed support 2 through the pulley 13, so that the positioning mechanism is ensured to move upwards synchronously, the hoisted material can be effectively prevented from shaking in the transportation process, the stability is high, and the use is convenient; the utility model is simple in operation, can guarantee that hoist and mount are stable, the security is high.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A hoisting device for construction equipment is characterized by comprising a base (1), a fixed support column (2), a first electric push rod (3) and a positioning mechanism, wherein the fixed support column (2) is installed on the base (1), the first electric push rod (3) is positioned at the top end of the fixed support column (2), one end of the first electric push rod (3) is movably connected with the fixed support column (2) through a movable shaft (5), a guide wheel (6) is installed at the extending end of the first electric push rod (3), a first traction steel wire rope (8) is connected onto the guide wheel (6), one end of the first traction steel wire rope (8) is connected with a hook (7), the other end of the first traction steel wire rope (8) is connected with a first winding frame (15) arranged on the first electric push rod (3), a second winding frame (16) is arranged at the lower end of the first electric push rod (3), and the first winding frame (15) and the second winding frame (16) are connected through a transmission belt (9), the positioning mechanism is positioned on one side of the fixed support column (2) and is connected with the second winding frame (16) through a second traction steel wire rope (10).
2. A construction equipment hoist device as claimed in claim 1, characterized in that: positioning mechanism includes second electric push rod (11) and positioning fixture (12), second electric push rod (11) one end and positioning fixture (12) fixed connection, and pulley (13) are installed to second electric push rod (11) other end, set up spout (14) with pulley (13) matching on fixed stay (2) lateral wall.
3. A construction equipment hoist device as claimed in claim 2, characterized in that: positioning fixture (12) both sides all are equipped with spacing bolt (18), spacing bolt (18) and positioning fixture (12) threaded connection, and spacing bolt (18) one end fixedly connected with limiting plate (21).
4. A construction equipment hoist device as claimed in claim 1, characterized in that: rotate on first rolling frame (15) and install first rolling axle (20), first traction cable (8) winding sets up on first rolling axle (20), motor (19) are installed to first rolling frame (15) one side, the output shaft and first rolling axle (20) fixed connection of motor (19), first rolling axle (20) one end is run through first rolling frame (15) and is connected with driving belt (9) through the belt pulley.
5. A construction equipment hoist device as claimed in claim 1, characterized in that: second rolling frame (16) fixed mounting is at first electric push rod (3) lower extreme, rotate on second rolling frame (16) and install second rolling axle (22), second traction cable (10) winding sets up on second rolling axle (22), second rolling axle (22) one end runs through second rolling frame (16) and cup joints through belt pulley and driving belt (9).
6. A construction equipment hoist device as claimed in claim 1, characterized in that: fixing base (17) are all installed to fixed stay (2) both sides, install cylinder (4) on fixing base (17), the extension end and the first electric push rod (3) lateral wall of cylinder (4) are connected.
CN202021265104.2U 2020-07-02 2020-07-02 Construction equipment hoisting device Expired - Fee Related CN213171204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021265104.2U CN213171204U (en) 2020-07-02 2020-07-02 Construction equipment hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021265104.2U CN213171204U (en) 2020-07-02 2020-07-02 Construction equipment hoisting device

Publications (1)

Publication Number Publication Date
CN213171204U true CN213171204U (en) 2021-05-11

Family

ID=75790465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021265104.2U Expired - Fee Related CN213171204U (en) 2020-07-02 2020-07-02 Construction equipment hoisting device

Country Status (1)

Country Link
CN (1) CN213171204U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113353796A (en) * 2021-06-02 2021-09-07 安徽机电职业技术学院 Hoisting device for small and medium-sized components of steel structure frame
CN113418799A (en) * 2021-05-27 2021-09-21 国网浙江省电力有限公司金华供电公司 Device for pole holding static load test

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113418799A (en) * 2021-05-27 2021-09-21 国网浙江省电力有限公司金华供电公司 Device for pole holding static load test
CN113353796A (en) * 2021-06-02 2021-09-07 安徽机电职业技术学院 Hoisting device for small and medium-sized components of steel structure frame
CN113353796B (en) * 2021-06-02 2024-01-30 安徽机电职业技术学院 Hoisting device for small and medium-sized components in steel structure frame

Similar Documents

Publication Publication Date Title
CN213171204U (en) Construction equipment hoisting device
CN111217266B (en) Working method of assembled wall body hoisting device
CN114629056B (en) Mobile distribution network live working robot
CN104150393B (en) A kind of micro power power equipment rotary hoisting device
CN210795615U (en) Crane hoisting device with double-brake structure
CN112593900A (en) Tower type oil pumping unit
CN217555687U (en) Hoisting accessory is changed to cladding material workshop electric block part
CN216583791U (en) Corrugated aluminum plate lifting device
CN113896116B (en) Lifting device for angle steel member of iron tower and operation method thereof
CN214270007U (en) Power transmission and transformation line construction hoisting device
CN213980765U (en) Tower type oil pumping unit
CN212315377U (en) Chemical industry equipment maintenance hoist and mount frame convenient to installation
CN210286537U (en) Four-point crane for hoisting bin cover of transport ship
CN211056542U (en) Hoisting device for installing fan unit
CN113979193A (en) Line erecting device for wind power generation
CN217894899U (en) Pipeline mobile device for hydraulic engineering
CN104340899A (en) Manual gear type column switch hoisting device and application thereof
CN211226118U (en) Double-wheel electric rope pulling machine
CN217838039U (en) A hoisting accessory is used in construction for transmission of electricity specialty
CN220976436U (en) Single track hangs track installation elevating gear
CN220283367U (en) Lifting machine for building engineering
CN204150988U (en) A kind of hand gear type on-pole switch lifting appliance
CN117105114B (en) Rocker arm and holding pole crawler type integrated equipment for electric power iron tower transportation and installation
CN218371495U (en) Steel pipe hoist and mount hoist for construction
CN216840526U (en) Bearing frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511