CN202416967U - 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 - Google Patents
煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 Download PDFInfo
- Publication number
- CN202416967U CN202416967U CN2011205314399U CN201120531439U CN202416967U CN 202416967 U CN202416967 U CN 202416967U CN 2011205314399 U CN2011205314399 U CN 2011205314399U CN 201120531439 U CN201120531439 U CN 201120531439U CN 202416967 U CN202416967 U CN 202416967U
- Authority
- CN
- China
- Prior art keywords
- tower
- power transmission
- principal
- section bar
- principal material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000463 material Substances 0.000 title claims abstract description 43
- 230000005540 biological transmission Effects 0.000 title abstract description 10
- 239000003245 coal Substances 0.000 title abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 238000005065 mining Methods 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 230000000694 effects Effects 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 8
- 230000003014 reinforcing effect Effects 0.000 abstract 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 22
- 229910052742 iron Inorganic materials 0.000 description 11
- 230000005611 electricity Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置。该煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置包括分体的主材(1),所述的分体主材(1)通过设置在主材内侧的支撑型材(2)和设置在主材外侧的加强型材(3)在若干螺栓(4)的作用下搭接为一体。采用该技术方案,当输电铁塔发生倾斜时,拆卸螺栓将分体的主材分离拉长,然后用支撑型材紧靠主材内侧,加强型材紧靠主材外侧,在螺栓的作用下重新固定搭接,增加了塌陷一侧的塔腿高度,保证了输电铁塔的竖直,其结构简单,施工方便,工期短,造价低;可以带电作业,不影响输电的进行,保证了生产生活不会因为断电而发生影响。
Description
技术领域
本实用新型涉及一种输电铁塔塔腿调节装置,尤其涉及一种采煤沉陷区内受到采动影响发生不均沉降而倾斜的输电铁塔塔腿主材长度调节装置。
背景技术
煤炭资源的大量开采,形成了大量的采煤沉陷区。另一方面,随着电网建设的不断发展,线路走廊日趋紧张。造成大量的输电线路不可避免的要建设在采煤沉陷区内,从而导致一些输电铁塔发生不同程度的倾斜,给输电线路的安全运行造成严重威胁。当铁塔倾斜较小时,采用调整或增加地脚螺栓高度后,在踏脚板下垫钢板的方法。但是,当铁塔倾斜的程度超出地脚螺栓的调整范围时,已有的应对措施主要是对基础进行开挖和整体抬升的办法。但该技术工程量大,施工工期长,且常需要断电施工,对生产生活的影响较大。而且采煤沉陷区的变形是一个缓慢且漫长的变形过程,即便采用上述方法一次施工到位后,铁塔仍会面临新的变形,到一定程度又需再次开挖和扶正。因此,迫切需要研究一种施工方便、工期短、且能对铁塔的倾斜进行持续、重复调节的装置。
发明内容
技术问题:本实用新型的目的在于针对现有技术的不足,提供施工方便、造价低、工期短、综合效果好、结构简单合理的煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,通过调整塔腿的长度来扶正倾斜的输电铁塔。
技术方案:为了实现上述发明目的,本实用新型所采用的技术方案为:
一种煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,包括分体的主材,所述的分体主材通过设置在主材内侧的支撑型材和设置在主材外侧的加强型材在若干螺栓的作用下搭接为一体。当输电铁塔发生倾斜时,拆卸螺栓将分体的主材分离拉长,然后用支撑型材紧靠主材内侧,加强型材紧靠主材外侧,在螺栓的作用下重新固定搭接,增加了塌陷一侧的塔腿高度,保证了输电铁塔的竖直。
作为优选,所述的主材为角钢;所述的支撑型材为角钢;所述的支撑型材也可以选用钢板;所述的加强型材为角钢或者钢板。
有益效果:本实用新型与现有技术相比,其有益效果是:当输电铁塔发生倾斜时,拆卸螺栓将分体的主材分离拉长,然后用支撑型材紧靠主材内侧,加强型材紧靠主材外侧,在螺栓的作用下重新固定搭接,增加了塌陷一侧的塔腿高度,保证了输电铁塔的竖直,该结构有效地减少了铁塔的倾斜,显著减少地表变形在输电铁塔上产生的附加应力,使其能够经受煤炭采动的影响,保证输电铁塔的安全;尤其适用于沉陷区高压输电线路输电铁塔;其结构简单,施工方便,工期短,造价低;可以带电作业,不影响输电的进行,保证了生产生活不会因为断电而发生影响。
附图说明
图1为铁塔倾斜后示意图;
图2为铁塔调节后示意图;
图3为煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置结构示意图;
图4为A-A剖面示意图;
图5为B-B剖面示意图。
具体实施方式
下面结合附图对本实用新型的一个实施例作进一步的描述:
如图1所示,铁塔倾斜后示意图,铁塔的一侧因地表沉陷而降低,铁塔发生倾斜。如图2所示,通过调节煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,使地表沉陷一侧的塔腿变长,铁塔竖直。如图3、图4和图5所示,一种煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,包括分体的主材1,所述的分体主材1通过设置在主材内侧的支撑型材2和设置在主材外侧的加强型材3,在若干螺栓4的作用下搭接为一体,所述的主材1、支撑型材2和加强型材3设置有若干等距的用于通过螺栓4的通过孔,所述的主材1为角钢,所述的支撑型材2为角钢,所述的加强型材3为两块钢板。
Claims (4)
1.一种煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,其特征在于:包括分体的主材(1),所述的分体主材(1)通过设置在主材内侧的支撑型材(2)和设置在主材外侧的加强型材(3)在若干螺栓(4)的作用下搭接为一体。
2.根据权利要求1所述的煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,其特征在于:所述的主材(1)为角钢。
3.根据权利要求1所述的煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,其特征在于:所述的支撑型材(2)为角钢。
4.根据权利要求1所述的煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置,其特征在于:所述的加强型材(3)为角钢或者钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205314399U CN202416967U (zh) | 2011-12-19 | 2011-12-19 | 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205314399U CN202416967U (zh) | 2011-12-19 | 2011-12-19 | 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202416967U true CN202416967U (zh) | 2012-09-05 |
Family
ID=46741742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205314399U Expired - Lifetime CN202416967U (zh) | 2011-12-19 | 2011-12-19 | 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202416967U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032997A (zh) * | 2014-06-25 | 2014-09-10 | 中国电力工程顾问集团西南电力设计院 | 一种用于输电铁塔的延长腿 |
CN104033000A (zh) * | 2014-05-28 | 2014-09-10 | 福建永福铁塔技术开发有限公司 | 长短腿风电塔架 |
CN106193756A (zh) * | 2014-06-17 | 2016-12-07 | 福州万山电力咨询有限公司 | 一种可带电作业的窄基双柱塔纠偏方法 |
CN108533052A (zh) * | 2018-04-20 | 2018-09-14 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种用于地基持续大变形区可调式输电支撑结构 |
CN108843107A (zh) * | 2018-08-29 | 2018-11-20 | 国网江苏省电力有限公司 | 铁塔组合加强结构 |
CN112459597A (zh) * | 2020-12-14 | 2021-03-09 | 中国电力工程顾问集团华北电力设计院有限公司 | 适配大直径高强螺栓双剪连接的塔脚板及其组合结构 |
-
2011
- 2011-12-19 CN CN2011205314399U patent/CN202416967U/zh not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104033000A (zh) * | 2014-05-28 | 2014-09-10 | 福建永福铁塔技术开发有限公司 | 长短腿风电塔架 |
CN106193756A (zh) * | 2014-06-17 | 2016-12-07 | 福州万山电力咨询有限公司 | 一种可带电作业的窄基双柱塔纠偏方法 |
CN106193756B (zh) * | 2014-06-17 | 2018-11-13 | 福州万山电力咨询有限公司 | 一种可带电作业的窄基双柱塔纠偏方法 |
CN104032997A (zh) * | 2014-06-25 | 2014-09-10 | 中国电力工程顾问集团西南电力设计院 | 一种用于输电铁塔的延长腿 |
CN104032997B (zh) * | 2014-06-25 | 2016-04-13 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种用于输电铁塔的延长腿 |
CN108533052A (zh) * | 2018-04-20 | 2018-09-14 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种用于地基持续大变形区可调式输电支撑结构 |
CN108533052B (zh) * | 2018-04-20 | 2022-09-20 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种用于地基持续大变形区可调式输电支撑结构 |
CN108843107A (zh) * | 2018-08-29 | 2018-11-20 | 国网江苏省电力有限公司 | 铁塔组合加强结构 |
CN112459597A (zh) * | 2020-12-14 | 2021-03-09 | 中国电力工程顾问集团华北电力设计院有限公司 | 适配大直径高强螺栓双剪连接的塔脚板及其组合结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202416967U (zh) | 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置 | |
CN103205976B (zh) | 坡体压力自调式多级框架梁护坡结构 | |
CN104005338A (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
CN103938663A (zh) | 一种单拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN102061742B (zh) | 防震钢筋混凝土仿古建筑结构体系 | |
CN102080382A (zh) | 适应采空区地基变形的建筑基础 | |
CN204906277U (zh) | 适用于易发生基础沉降地基场地的光伏组件安装支架 | |
CN204753659U (zh) | 输电铁塔纠偏装置 | |
CN201232194Y (zh) | 一种抗变形输电杆塔 | |
CN105604086A (zh) | 风机基础结构 | |
CN202767612U (zh) | 一种煤矿沉陷区倾斜输电铁塔扶正装置 | |
CN203066090U (zh) | 钢板桩围堰施工可拼装支撑结构 | |
CN203846403U (zh) | 一种装配式岸上临时支墩装置 | |
CN201962689U (zh) | 适应采空区地基变形的建筑基础 | |
CN204780942U (zh) | 可拆卸组合式变截面型钢腰梁 | |
CN203594058U (zh) | 一种单拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN208684247U (zh) | 一种预制节段用吊装装置 | |
CN203594263U (zh) | 一种双拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN203145036U (zh) | 一种抗采动大变形钢柱脚 | |
CN203022409U (zh) | 一种铁塔支撑组件 | |
CN215483087U (zh) | 一种可装配式挡土墙 | |
CN205224090U (zh) | 一种变坡滑道上跟踪顶进预制框架的台阶式混凝土后座 | |
CN204898696U (zh) | 一种伸缩式钢围堰 | |
CN204531575U (zh) | 水泥杆加固治理钢砼结构 | |
CN208309616U (zh) | 一种拼缝错开的装配式活动房预制基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120905 |