CN104033000A - 长短腿风电塔架 - Google Patents

长短腿风电塔架 Download PDF

Info

Publication number
CN104033000A
CN104033000A CN201410229039.0A CN201410229039A CN104033000A CN 104033000 A CN104033000 A CN 104033000A CN 201410229039 A CN201410229039 A CN 201410229039A CN 104033000 A CN104033000 A CN 104033000A
Authority
CN
China
Prior art keywords
wind power
tower
power tower
supporting leg
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410229039.0A
Other languages
English (en)
Inventor
陈强
王磊
何守理
何明胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
FUJIAN YONGFU IRON TOWER TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
FUJIAN YONGFU IRON TOWER TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN YONG FU PROJECT CONSULTANT Co Ltd, FUJIAN YONGFU IRON TOWER TECHNOLOGY DEVELOPMENT Co Ltd filed Critical FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
Priority to CN201410229039.0A priority Critical patent/CN104033000A/zh
Publication of CN104033000A publication Critical patent/CN104033000A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种长短腿风电塔架,包括有三个以上的支腿,所述的支腿长短不一,支腿设置于塔架的底部。本发明的长短腿风电塔架,由塔身和塔腿两部分构成,其中,塔身又分为上下两部分,上部为锥筒型或格构型结构,下部为格构式或锥筒型结构,具有便于自身加工、运输、组装等优点。由于塔架采用了长短腿的结构,这样在将其应用于山区坡度地形时,可减少土石方开挖,大大缩短施工工期,同时有效减少水土流失与生态环境破坏。此外,长短腿结构可显著降低基础造价以及塔架本身的重量,具有明显的社会效益与经济效益。

Description

长短腿风电塔架
技术领域
本发明涉及一种风电塔架,特别是一种长短腿风电塔架 。
背景技术
塔架是风电机组的主支撑部件,其设计可靠性是风电机组能够安全运行的保证。风电机组运行的环境条件非常恶劣,因而塔架不仅要有足够的强度和刚度,承受自然环境以及风电系统运行引起的各种荷载,还要避免塔架与叶轮发生共振,因而塔架的设计是风电机组设计中非常重要的环节。采用合理的塔架型式将直接影响风电机组的安全性和经济型。目前,风力发电塔架的结构形式主要有锥筒型塔筒、格构式塔架两种型式。
(1) 锥筒型塔筒
锥筒型塔筒是目前大型风力发电机组市场中最典型的结构型式。从材料上来说,锥筒型塔筒主要分为钢塔筒和混凝土塔筒。混凝土塔筒又分为预应力钢筋混凝土塔筒和钢筋混凝土塔筒。钢塔筒由于占地面积小、构造简单、施工方便快捷,应用较为普遍。随着风电技术的发展,钢管塔架的外径和卷制塔体钢板的厚度也越来越大,这对于卷制钢板的加工工艺、焊接工艺以及塔体的运输安装都提出了更高的要求,而且由于其基础尺寸很大,导致基坑土石方开挖量巨大、塔位水土破坏严重,因此特别是在山地风电场的应用受到很大限制。钢筋混凝土塔架的优点在于抗腐蚀性能好(适用于沿海、滩涂等地区)、刚度大、本体造价较低,但由于其现场施工周期长、预制塔架自重大运输困难等原因而不能适应风机大型化的发展趋势,此外由于混凝土材料自身特性-抗拉强度约为抗压强度的1/8—1/20,往往在钢筋混凝土结构的使用中受拉侧钢筋的性能得不到充分利用,使得这种结构形式在风电机组塔架高耸结构中受到限制。
(2) 格构式塔架
格构式塔架与输电塔架外观相似,在早期小型风力发电机组中大量使用,其主要优点是制造简单、耗材少、成本低、构件尺寸小、运输方便。但是,格构式塔架由于在风机叶片半径范围内的塔架头部为镂空结构型式,使得叶片在转过塔架时由于风振效应会产生噪声污染,且其在施工过程中连接的零部件较多,安装周期长,不美观等。目前,格构式塔架构件截面主要有钢管、角钢、圆钢以及组合构件等几种形式。
以上的几种风电塔架,还存在一个共同的缺点,那就是,传统的风电塔架采用平腿形式,当在山区坡度地形时,由于塔腿根开相对较大,考虑到施工等方面的要求,需要进行大量的土石方开挖,这不仅会使周围植物遭到砍伐或破坏,而且开挖后的土石方堆积在基础周围,在雨水的冲击下,容易造成水土流失或者滑体,造成更大的植被破坏和财产损失,甚至给风电塔架造成安全隐患。
发明内容
本发明的目的在于克服现有技术的不足之处,而提供一种具有不同的长短腿的、能根据地势灵活选用的、能有效减少土方的开挖量、减少耗材的长短腿风电塔架。
一种长短腿风电塔架,包括有三个以上的支腿,所述的支腿长短不一,支腿间隔设置于塔架的底部。
在塔架的底部设置长短不一的支腿用于支撑塔架,改变了以往直接利用塔架的平底或平腿支撑在地面上,将原来的塔架变为由塔身及长短支腿两部分构成,这样在应用时如遇到山区坡度地形时,可利用塔架底部的长短支腿,使得塔腿数量及各腿长度可根据地形或其他需要而任意调整,因此,不但便于自身加工、运输、组装以及节约本体耗钢量;并且由于可将锥筒式塔架的塔底由原来的一个大基础分解成数个独立的小基础,从而能最大限度契合山区塔位地形,因此还可显著降低基础耗材与土石方工程,有效减少水土流失与生态环境破坏,大大缩短施工工期,具有明显的经济效益。
所述的多个的支腿之间或采用三角形分布、或采用多边形分布。
支腿在塔架底部的安装角度或为沿着塔架的倾斜度向下继续延伸,或为与地平面的夹角小于塔架侧面与地平面的夹角。
所述的支腿与塔身之间的连接或为采用固定式连接,或为采用可拆卸式连接。
当支腿与塔身之间采用可拆卸式连接时,可大大减少在运输、储存、搬运、安装时的存储空间。
所述的可拆卸的连接为指的是采用螺接、铆接或插接等。
风电塔架支腿以上的塔身部分由上下两部分构成,上部分为锥筒型或格构型结构,下部为格构式或锥筒型结构,格构式或锥筒型结构支撑在支腿上。
将塔身采用上下两部分构成,克服了塔身结构单一时所具有的缺点,集合了锥筒型塔架与格构式塔架优点于一身,因此具有更强的推广性与应用性。
风电塔架支腿以上的塔身或为格构式结构,或为锥筒型结构。
综上所述的,本发明相比现有技术如下优点:
本发明的长短腿风电塔架,由于塔架采用了长短腿的结构,这样在将其应用于山区坡度地形时,可减少土石方开挖,大大缩短施工工期,同时有效减少水土流失与生态环境破坏。此外,长短腿结构可显著降低基础造价以及塔架本身的重量,具有明显的社会效益与经济效益。
附图说明
图1为实施例1的长短腿风电塔架的结构示意图。
图2为图1的A-A处剖视断面示意图。
图3为实施例2的长短腿风电塔架的结构示意图。
标号说明 1 塔身11格构式部分12锥筒式部分2支腿。
具体实施方式
下面结合实施例对本发明进行更详细的描述。
实施例1
一种长短腿风电塔架,包括有三个的支腿2,所述的支腿长短不一,支腿间隔设置于塔架的底部。所述的3个的支腿之间采用三角形分布。支腿在塔架底部的安装角度或为沿着塔架的倾斜度向下继续延伸,所述的支腿与塔身之间的连接或为采用固定式连接,风电塔架支腿以上的塔身1为格构式结构。
本实施例未述部分与现有技术相同。
实施例2
本实施例未述部分与实施例1相同,只是塔架的塔身部分为由上下两部分构成,上部分为锥筒型12结构,下部为格构式11结构,格构式结构支撑在支腿上,所述的支腿为呈四边形分布。
本实施例未述部分与实施例1相同。

Claims (6)

1.一种长短腿风电塔架,其特征在于:包括有三个以上的支腿,所述的支腿长短不一,支腿间隔设置于塔架的底部。
2.根据权利要求1所述的长短腿风电塔架,其特征在于:所述的多个的支腿之间或采用三角形分布、或采用多边形分布。
3.根据权利要求2所述的长短腿风电塔架,其特征在于:支腿在塔架底部的安装角度或为沿着塔架的倾斜度向下继续延伸,或为与地平面的夹角小于塔架侧面与地平面的夹角。
4.根据权利要求3所述的长短腿风电塔架,其特征在于:所述的支腿与塔身之间的连接或为采用固定式连接,或为采用可拆卸式连接。
5.根据权利要求4所述的长短腿风电塔架,其特征在于:风电塔架支腿以上的塔身部分由上下两部分构成,上部为锥筒型或格构型结构,下部为格构式或锥筒型结构,格构式或锥筒型结构支撑在支腿上。
6.根据权利要求4所述的长短腿风电塔架,其特征在于:风电塔架支腿以上的塔身或为格构式结构,或为锥筒型结构。
CN201410229039.0A 2014-05-28 2014-05-28 长短腿风电塔架 Pending CN104033000A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410229039.0A CN104033000A (zh) 2014-05-28 2014-05-28 长短腿风电塔架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410229039.0A CN104033000A (zh) 2014-05-28 2014-05-28 长短腿风电塔架

Publications (1)

Publication Number Publication Date
CN104033000A true CN104033000A (zh) 2014-09-10

Family

ID=51463972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410229039.0A Pending CN104033000A (zh) 2014-05-28 2014-05-28 长短腿风电塔架

Country Status (1)

Country Link
CN (1) CN104033000A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804111A (zh) * 2016-05-26 2016-07-27 福建省新能海上风电研发中心有限公司 一种不等长腿海上风电导管架基础及其施工方法
CN106557600A (zh) * 2015-09-30 2017-04-05 中国电力科学研究院 一种输电塔长短腿及基础的仿真方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202039636U (zh) * 2011-04-07 2011-11-16 中国电力工程顾问集团华北电力设计院工程有限公司 800kV特高压直流新型直线输电铁塔
CN102644400A (zh) * 2012-03-28 2012-08-22 江苏昆山通用电气有限公司 组合耐张塔
CN202416967U (zh) * 2011-12-19 2012-09-05 中国矿业大学 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置
CN103423099A (zh) * 2012-05-21 2013-12-04 上海电气风能有限公司 一种可以用于大型陆上风力发电机组的混合塔架支撑结构
CN203947843U (zh) * 2014-05-28 2014-11-19 福建永福铁塔技术开发有限公司 长短腿风电塔架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202039636U (zh) * 2011-04-07 2011-11-16 中国电力工程顾问集团华北电力设计院工程有限公司 800kV特高压直流新型直线输电铁塔
CN202416967U (zh) * 2011-12-19 2012-09-05 中国矿业大学 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置
CN102644400A (zh) * 2012-03-28 2012-08-22 江苏昆山通用电气有限公司 组合耐张塔
CN103423099A (zh) * 2012-05-21 2013-12-04 上海电气风能有限公司 一种可以用于大型陆上风力发电机组的混合塔架支撑结构
CN203947843U (zh) * 2014-05-28 2014-11-19 福建永福铁塔技术开发有限公司 长短腿风电塔架

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106557600A (zh) * 2015-09-30 2017-04-05 中国电力科学研究院 一种输电塔长短腿及基础的仿真方法
CN105804111A (zh) * 2016-05-26 2016-07-27 福建省新能海上风电研发中心有限公司 一种不等长腿海上风电导管架基础及其施工方法
CN105804111B (zh) * 2016-05-26 2018-09-04 福建省新能海上风电研发中心有限公司 一种不等长腿海上风电导管架基础及其施工方法

Similar Documents

Publication Publication Date Title
CN206289651U (zh) 一种单桩锚固的海上风电基础结构
CN202519698U (zh) 预应力混凝土圆筒型基础
WO2016140892A4 (en) Reduced profile wind tower system for land-based and offshore applications
CN105994091A (zh) 一种玄武岩纤维制珊瑚礁生态修复多维礁体
CN111236294A (zh) 一种组合式圆筒结构风机基础
CN102639868B (zh) 海上风机整机
CN109537621A (zh) 一种组合式海上风电筒型基础
CN103046575A (zh) 一种陆上四叶梅型的风机扩展基础结构
CN202265838U (zh) 风力发电机多向预应力基础
CN203548071U (zh) 钢混凝土复合结构塔架
CN104033000A (zh) 长短腿风电塔架
CN203947843U (zh) 长短腿风电塔架
CN207211183U (zh) 一种海上风电单桩基础与箱网养殖一体装置
CN103502547B (zh) 由木材制成的风力涡轮机塔架和其架设方法
CN107938498A (zh) 组装式钢桥墩墩柱及组装式门式钢桥墩
CN105756077B (zh) 基础环岩石锚杆基础
CN204540076U (zh) 一种节能石壁绿化系统
CN207904939U (zh) 一种生态护坡植草板
CN209010244U (zh) 变水位自调式生态浮岛
CN104153630A (zh) 混合式风电塔架的过渡连接方法
CN203243769U (zh) 用于树木地下加固的立体锚固结构
CN104452798A (zh) 海上风机基础结构、设备及其施工方法
CN202850038U (zh) 生态复合型边坡防护板和边坡防护结构
CN209636848U (zh) 一种组合式海上风电筒型基础
CN211898511U (zh) 一种组合式圆筒结构风机基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Enterprise Langqi Economic District of Fuzhou City, Fujian province 350016 Langqi Town People's Government Service Center Room 304

Applicant after: Fujian Yongfu Iron Tower Technology Development Co., Ltd.

Applicant after: FUJIAN YONGFU POWER ENGINEERING CO., LTD.

Address before: Enterprise Langqi Economic District of Fuzhou City, Fujian province 350016 Langqi Town People's Government Service Center Room 304

Applicant before: Fujian Yongfu Iron Tower Technology Development Co., Ltd.

Applicant before: Fujian Yong Fu Project Consultant Co., Ltd.

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140910