CN202391099U - Slope concrete template capable of being installed or disassembled continuously - Google Patents
Slope concrete template capable of being installed or disassembled continuously Download PDFInfo
- Publication number
- CN202391099U CN202391099U CN2011205622455U CN201120562245U CN202391099U CN 202391099 U CN202391099 U CN 202391099U CN 2011205622455 U CN2011205622455 U CN 2011205622455U CN 201120562245 U CN201120562245 U CN 201120562245U CN 202391099 U CN202391099 U CN 202391099U
- Authority
- CN
- China
- Prior art keywords
- template
- slope
- slope concrete
- screws
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a slope concrete template capable of being installed or disassembled continuously. The slope concrete template comprises jiaan screws fixed on structural steel bars, wherein pull-strip screws are connected at the tops of the jiaan screws by jiean nuts; tightening nuts are arranged at the tops of the pull-strip screws; templates are arranged on the pull-strip screws; framing scaffolds are arranged at the upper parts of the templates; the framing scaffolds are provided with second drilling holes corresponding to first drilling holes in the templates; and the pull-strip screws penetrate through the first drilling holes and the second drilling holes. The slope concrete template disclosed by the utility model has the technical effects that the slope concrete template can be used for construction parts with large slope surface area, steeper slope and need of large bin position for casting, is convenient for the installation, or disassembly and operation of the template, is high in the turnover utilization rate, high in the construction speed, can ensure the concrete casting quality, and is beneficial to increasing of the production efficiency and reducing of the construction cost.
Description
Technical field
The utility model relates to a kind of mixed building operations and uses plate device, particularly a kind of slope concrete blinding that is applicable to installation or removal continuously.
Background technology
In the concrete pouring construction at position, slope; Usually using drawing-die to carry out formwork erection builds; The position, slope that the only suitable storehouse of this method face is less and the gradient is slow; The construction part big for domatic area, that the gradient is steep, the big position in storehouse of needs is built is difficult to satisfy the requirement of speed of application and construction quality.
Summary of the invention
The utility model technical problem to be solved provides a kind of slope concrete blinding of installation or removal continuously; Can be used for the construction part that domatic area is big, the gradient is steep, the big position in storehouse of needs is built; Easy to operate; Cost is low, the turnover utilization rate is high, and can accelerate speed of application, guarantees concrete pouring quality.
The technical scheme that the utility model adopts:
A kind of slope concrete blinding of installation or removal continuously; Comprise the frame peace screw rod that is fixed on the structure reinforcing bars, frame peace screw rod top is connected with the tie rod screw rod through joint peace nut, and tie rod screw rod top is provided with clamp nut; The tie rod screw rod is provided with template; Template top intersects and to be provided with waling, waling be provided with template on corresponding second boring of first boring, the tie rod screw rod passes first boring and holes with second.
Above-mentioned template is provided with gusset.
Above-mentioned waling one end is provided with screw, and the other end is provided with the connecting rod that matches and be connected with the screw of other waling end.
Above-mentioned template top is provided with the end socket template.
The technique effect that the utility model is obtained:
The utility model can be used for the construction part that domatic area is big, the gradient is steep, the big position in storehouse of needs is built, and the installation or removal of template are easy to operate, and the turnover utilization rate is high, and speed of application is fast, can guarantee concrete pouring quality.Help enhancing productivity, reduce construction cost.
Description of drawings
Fig. 1 is the scheme of installation of the utility model structure;
The lateral view that Fig. 2 installs for template;
Fig. 3 is the enlarged drawing of Fig. 1 at the joint peace nut at A place;
Fig. 4 is the structural representation of waling;
Fig. 5 is the structural representation of template.
The specific embodiment
Be further described below in conjunction with the embodiment of accompanying drawing the utility model.
Referring to Fig. 1-5, a kind of slope concrete blinding of installation or removal continuously, template 1 is connected with structure reinforcing bars 9 in the storehouse through a plurality of joints peace nuts 3 and many rhizospheres jail 2 fixes.Comprise the frame peace screw rod 5 that is fixed on the structure reinforcing bars 9; Frame peace screw rod top is connected with tie rod screw rod 4 through joint peace nut 3; Tie rod screw rod top is provided with clamp nut, and the tie rod screw rod is provided with template 1, and template top intersection is provided with waling 2; Waling be provided with template on first boring, 6 corresponding second borings 6 ', the tie rod screw rod passes first boring and holes with second.Described template is provided with gusset 8.Described waling one end is provided with screw, and the other end is provided with the connecting rod 7 that matches and be connected with screw.
Concrete work progress:
1) template 1 adopts the steel plate of thickness 2.5mm to make, and waling 2 adopts 2 cun steel pipes to process;
2) after 9 colligations of the structure reinforcing bars in the face of storehouse finish, the adjustment with it the welding tie rod 11 and with joint bar 10 firm welding, reach designing requirement until structure reinforcing bars 9;
3) before the mounting template 1; Elder generation is welded on an end of the frame peace screw rod 5 of a plurality of joints peace nuts 3 on the structure reinforcing bars 9; The spacing of wells, direction are coincide consistently on the spacing of retainer peace screw rod 5 during welding, direction and the waling 2, adjust end face that all joints pacify nut 3 then and design concrete surface and flush;
4) according to from low past high order frame shuttering 1, adopt U type card connection between the single form, use 1 reinforcing of the upright template of 2 pairs of framves of waling at last in the outside of template 1;
5) can use 7 pairs of walings of connecting rod 2 to connect lengthening, to meet the requirements of length.Seal with end socket template 12 at the template top.Second boring of adjusting on the waling 26 ' is alignd with first boring 6 on the template 1, inserts tie rod screw rod 4 then and is connected with joint peace nut 3 spirals, outside tie rod screw rod 4 is appeared, uses nut that template 1 is fixing at last;
6) concreting, when concreting to certain height, bottom concrete initial set, promptly collapsible die is to its construction of wiping one's face.During form removal, screw out earlier tie rod screw rod 4, after withdraw from single-unit waling 2, unload lower bolster 1 again;
7) wipe one's face before the construction, can the joint in concrete surface layer peace nut 3 be screwed out.
Claims (4)
1. slope concrete blinding of installation or removal continuously; It is characterized in that: comprise the frame peace screw rod (5) that is fixed on the structure reinforcing bars (9); Frame peace screw rod top is connected with tie rod screw rod (4) through joint peace nut (3); Tie rod screw rod top is provided with clamp nut, and the tie rod screw rod is provided with template (1), and template top intersection is provided with waling (2); Waling be provided with template on corresponding second boring (6 ') of first boring (6), the tie rod screw rod passes first boring and holes with second.
2. the slope concrete blinding of installation or removal continuously according to claim 1 is characterized in that: described template is provided with gusset (8).
3. the slope concrete blinding of installation or removal continuously according to claim 1 and 2 is characterized in that: described waling one end is provided with screw, and the other end is provided with the connecting rod (7) that matches and be connected with the screw of other waling end.
4. the slope concrete blinding of installation or removal continuously according to claim 1 and 2 is characterized in that: described template top is provided with end socket template (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205622455U CN202391099U (en) | 2011-12-29 | 2011-12-29 | Slope concrete template capable of being installed or disassembled continuously |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205622455U CN202391099U (en) | 2011-12-29 | 2011-12-29 | Slope concrete template capable of being installed or disassembled continuously |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202391099U true CN202391099U (en) | 2012-08-22 |
Family
ID=46666033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205622455U Expired - Fee Related CN202391099U (en) | 2011-12-29 | 2011-12-29 | Slope concrete template capable of being installed or disassembled continuously |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202391099U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258470A (en) * | 2019-06-24 | 2019-09-20 | 中国葛洲坝集团建设工程有限公司 | A kind of large-sized concrete bracket rapid construction device and method |
-
2011
- 2011-12-29 CN CN2011205622455U patent/CN202391099U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258470A (en) * | 2019-06-24 | 2019-09-20 | 中国葛洲坝集团建设工程有限公司 | A kind of large-sized concrete bracket rapid construction device and method |
CN110258470B (en) * | 2019-06-24 | 2024-03-12 | 中国葛洲坝集团建设工程有限公司 | Quick construction device and method for large-scale concrete bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735625B (en) | A kind of side form support system for floor construction | |
CN104453224A (en) | Formwork support structure of basement exterior wall and construction method of formwork support structure | |
CN104295088A (en) | Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure | |
CN201666157U (en) | Inverted arch integral type moving die carrier | |
CN104264984A (en) | Formwork for concrete structure pouring and pouring construction method | |
CN203487779U (en) | Tool type stock mould for masonry constructional column concrete pouring | |
CN207812625U (en) | Special-shaped gutter template integrated apparatus | |
CN204357117U (en) | A kind of after-pouring band beam-slab template and lattice column thereof | |
CN202391099U (en) | Slope concrete template capable of being installed or disassembled continuously | |
CN206625553U (en) | For pouring the formwork bracing system of high-low bay structure simultaneously | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN208792746U (en) | A kind of expansion joint regularization same tool steel plate template | |
CN208167534U (en) | Detachable support for Cast-in-situ Beam steel pipe support | |
CN202108296U (en) | Assembled segmental water tank tower | |
CN214062328U (en) | Expansion joint shaping template | |
CN203145464U (en) | Draw bar | |
CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
CN207363256U (en) | A kind of type quick detaching beam bottom mother plate supporting rack | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
CN211849566U (en) | Roughing mill body reserved bolt hole support-free template | |
CN104481142B (en) | The construction method of the chain support system of coupled columns template synchronous | |
CN202117390U (en) | Segmentally spliced water tank tower | |
CN115075613A (en) | Fabricated building supporting system and construction method thereof | |
CN104060819A (en) | Method for constructing shear wall by using typified forms and used typified forms | |
CN207847151U (en) | The telescopic support device to cornice for installing exterior wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120822 Termination date: 20201229 |