CN202324324U - Guide wall structure for top-stitched seam among fair-faced concrete layers - Google Patents

Guide wall structure for top-stitched seam among fair-faced concrete layers Download PDF

Info

Publication number
CN202324324U
CN202324324U CN2011204768040U CN201120476804U CN202324324U CN 202324324 U CN202324324 U CN 202324324U CN 2011204768040 U CN2011204768040 U CN 2011204768040U CN 201120476804 U CN201120476804 U CN 201120476804U CN 202324324 U CN202324324 U CN 202324324U
Authority
CN
China
Prior art keywords
wall
reinforced concrete
guide wall
wall body
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204768040U
Other languages
Chinese (zh)
Inventor
王京生
曹勤
郭彦玉
徐伟
李从麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 3 Construction Engineering Co Ltd
Original Assignee
Beijing No 3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 3 Construction Engineering Co Ltd filed Critical Beijing No 3 Construction Engineering Co Ltd
Priority to CN2011204768040U priority Critical patent/CN202324324U/en
Application granted granted Critical
Publication of CN202324324U publication Critical patent/CN202324324U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a guide wall structure for a top-stitched seam among fair-faced concrete layers. The guide wall structure comprises a reinforced concrete wall body and is characterized in that one surface of the outer side of the reinforced concrete wall body, relative to a floor slab, is provided with a step-shaped guide wall which is higher than the upper kin of the floor slab, the thickness of the root part of the guide wall is equal to that of the reinforced concrete wall body, the thickness of the top of the guide wall is 1/3-1/5 that of the reinforced concrete wall body, and the guide wall and the reinforced concrete wall body are poured into a whole. The utility model aims at solving the problem that a horizontal construction seam is not matched with the top-stitched seam due to integral pouring by using the method that the outer wall body horizontal construction seam is identical to the horizontal top-stitched seam remained in the design, and the requirement that a concrete beam and the wall body construction seam are remained in a region where the shearing force value is not the maximum is met.

Description

Clear-water concrete interlayer outseam is led wall construction
Technical field
The utility model relates to a kind of clear-water concrete and leads wall construction.
Background technology
Clear-water concrete is claimed ornamental concrete again, gains the name because of it has decorative effect.It belongs to one-time cast-forming; Do not do any outer decoration; A kind of nature decorative cover that is directly made up by outseam, buddhist seam and the split bolt hole etc. of skin texture, texture and the well-designed construction of main structure body concrete itself and form, surfacing is smooth, color and luster is even, corner angle are clearly demarcated, no clashing and breaking and pollution.Because clear-water concrete is very high to construction process requirement, therefore the construction with ordinary concrete is very different.Outseam is the clear-water concrete integral surface to be carried out piecemeal handle, thereby reaches building structure and the unified building technology of decorative appearance art.Monobloc cast has some unfavorable factors, and wherein the clear-water concrete metope is built after the completion, and the horizontal construction joint of outer body of wall can be stayed on the metope inevitably, influences outseam carries out lattice and decoration to the wall surface function.
The utility model content
The purpose of the utility model provides a kind of clear-water concrete interlayer outseam and leads wall construction; The horizontal outseam that outer body of wall horizontal construction joint and design are kept somewhere matches; Solve the inharmonic problem of horizontal construction joint and outseam position that monobloc cast brings, satisfy concrete beam and wall construction seam simultaneously and be retained in the maximum shear value with exterior domain.
For realizing above-mentioned purpose; The utility model adopts following technical scheme: a kind of clear-water concrete interlayer outseam is led wall construction, comprises reinforced concrete wall, it is characterized in that: said reinforced concrete wall is having the stair-stepping wall of leading with respect to floor outside one side; The said wall of leading is higher than the floor epithelium; The thickness of leading the foot of a wall portion equals the thickness of reinforced concrete wall, and the thickness of leading the wall top is the thickness of 1/3~1/5 reinforced concrete wall, saidly leads wall and reinforced concrete wall is cast for one.
Said thickness of leading the wall top is 50mm.
Compared with prior art the utlity model has following characteristics and beneficial effect:
One, the utility model has overcome the shortcoming that exterior wall horizontal construction joint that traditional clear water concrete wall monobloc casts brings influences the outseam function;
Two, the job practices of the utility model does not influence the monobloc cast effect of beam and wall, optimizes the beautiful decoration property of fair-faced concrete outer wall outseam, economy, easy construction.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is the structural representation of the utility model embodiment construction method step 1.
Fig. 2 is the structural representation of the utility model embodiment construction method step 2.
Fig. 3 is the structural representation of the utility model embodiment construction method step 3.
Fig. 4 is the structural representation of the utility model and the structural representation of embodiment construction method step 4.
Fig. 5 is the structural representation of the utility model embodiment construction method step 5.
Fig. 6 is the structural representation of the utility model embodiment construction method step 6~8.
Fig. 7 is the structural representation of the utility model embodiment construction method step 9.
Reference numeral: 1-reinforced concrete wall, 2-lead wall, 3-outseam bar, 4-guide wall form board, 5-fast easy-to-closing net, 6-beam bottom board plate, 7-lower floor inner formword, 8-lower floor exterior sheathing, 9-upper strata exterior sheathing, 10-upper strata body of wall, at the bottom of 11-flitch, 12-connect high carriage, 13-split bolt, 14-backing plate, 15-floor epithelium, 16-floor plate, 17-reinforcing bar, 18-concrete beam body, 19-upper strata inner formword.
The specific embodiment
Embodiment is referring to Fig. 4; A kind of clear-water concrete interlayer outseam is led wall construction, comprises reinforced concrete wall, it is characterized in that: said reinforced concrete wall 1 is having the stair-stepping wall 2 of leading with respect to floor outside one side; The said wall of leading is higher than floor epithelium 15; The thickness of leading wall 2 roots equals the thickness of reinforced concrete wall 1, and the thickness of leading wall 2 tops is the thickness of 1/3~1/5 reinforced concrete wall 1, and the said wall 2 of leading is cast for one with reinforced concrete wall 1.Said thickness of leading wall 2 tops can be selected 50mm.
The job practices that this clear-water concrete interlayer outseam is led wall construction is referring to Fig. 1-Fig. 7, and step is following:
Step 1, wall, beam form: put the wall form line and prop up and take lower floor's exterior sheathing 8 and lower floor's inner formword 7, lower floor's exterior sheathing 8 is inboard solid
Outseam bar 3 is arranged surely, and outseam bar 3 is higher than concrete building plated construction epithelium 70mm; Prop up and take beam bottom board plate 6, beam bottom board plate 6 and lower floor's inner formword 7 overlap joints;
Step 2, the colligation of beam muscle;
Step 3, fixing guide wall form board 4: with respect to lower floor's exterior sheathing 8 inboards, fast easy-to-closing net 5 one ends are solid in a zigzag at the metal right angle
Fix on guide wall form board 4 bottoms, the other end is fixed on beam bottom board plate 6 and lower floor's inner formword 7 lap-joints, and guide wall form board 4 and beam bottom board plate 6 are linked into an integrated entity; Lower floor's exterior sheathing 8, guide wall form board 4 and lower floor's inner formword 7 form a stepped space;
Building of step 4, lower floor's walls concrete: in stepped space, the even concreting of level lower floor body of wall outseam
Bar 3 places, the height of the concrete guide wall 2 of formation is concordant with outseam bar 3, leads the wall end face and forms wall outside horizontal construction joint;
Building of step 5, beam, plate: take slab form and side template, remove guide wall form board 4, vertical perpendicular to the beam of body of wall
Constuction joint is stayed 20cm~30cm in the bearing, and the colligation floor bar is treated the reinforcing bar acceptance(check), and the concrete one-time-concreting completion of floor and beam is to floor with beam is protected and maintenance;
Step 6, upper strata body of wall formwork: pull down layer exterior sheathing 8, upper strata exterior sheathing bearing device is installed, said upper walls template support
The Unit Installation method is following; The outside of being close to upper strata body of wall 10 is provided with at interval and connects high carriage 12, and the said high carriage 12 that connects is bracket shape steel part, and there is a L shaped saddle upper end of bracket shape steel part; Place elongated flitch 11 in the L shaped saddle; Every connects high carriage 12 and is fixed by split bolt and lower floor's body of wall, and said connecing between high carriage 12 and the lower floor's exterior surface of wall is lined with backing plate 14, and lower floor's body of wall inner surface and split bolt corresponding position are lined with cushion block;
Reinforcing bar in step 7, the colligation upper strata body of wall;
Step 8, upper strata inner formword 19 is supported on the floor, upper strata exterior sheathing 9 is supported on the exterior sheathing bearing device of upper strata;
Building of step 9, upper walls body concrete: concreting upper strata body of wall 10, the concrete construction joint of two-step pouring and wall outside outseam match;
Step 10, body of wall is protected and maintenance.

Claims (2)

1. a clear-water concrete interlayer outseam is led wall construction; Comprise reinforced concrete wall (1); It is characterized in that: said reinforced concrete wall (1) is having the stair-stepping wall (2) of leading with respect to floor outside one side; The said wall (2) of leading is higher than floor epithelium (15); The thickness of leading wall (2) root equals the thickness of reinforced concrete wall (1), and the thickness of leading wall (2) top is the thickness of 1/3 reinforced concrete wall (1), and the said wall (2) of leading is cast for one with reinforced concrete wall (1).
2. clear-water concrete interlayer outseam according to claim 1 is led wall construction, it is characterized in that: said thickness of leading wall (2) top is 50mm.
CN2011204768040U 2011-11-25 2011-11-25 Guide wall structure for top-stitched seam among fair-faced concrete layers Expired - Lifetime CN202324324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204768040U CN202324324U (en) 2011-11-25 2011-11-25 Guide wall structure for top-stitched seam among fair-faced concrete layers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204768040U CN202324324U (en) 2011-11-25 2011-11-25 Guide wall structure for top-stitched seam among fair-faced concrete layers

Publications (1)

Publication Number Publication Date
CN202324324U true CN202324324U (en) 2012-07-11

Family

ID=46436307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204768040U Expired - Lifetime CN202324324U (en) 2011-11-25 2011-11-25 Guide wall structure for top-stitched seam among fair-faced concrete layers

Country Status (1)

Country Link
CN (1) CN202324324U (en)

Similar Documents

Publication Publication Date Title
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN203393894U (en) Thin-wall profile steel compounded external wallboard
CN102409799B (en) Fair-faced concrete interlaminar open joint guide wall structure and construction method thereof
CN101936041B (en) Installation method and specific hydraulic punching machine for novel composite thermal-insulation plates and veneers
CN103009477B (en) A kind of factory for prefabrication prefabricated components construction method
CN105507462B (en) Have both the combined wall and its construction method of load-bearing and heat insulation function
CN105133755B (en) A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall
CN1461372A (en) Concrete building construction form unit and manufacturing device therefor, and concrete building constructed by using concrete building construction form
CN110318490A (en) A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN209619856U (en) Cast-in-place web and bottom plate maintenance of equipment
CN105386538A (en) CL composite concrete shear wall construction process
CN201686953U (en) Novel wall fence used for road
CN206928323U (en) A kind of ring muscle fastens assembled pipe gallery
CN202324324U (en) Guide wall structure for top-stitched seam among fair-faced concrete layers
CN201011006Y (en) Building heat preserving wall
CN210316545U (en) Novel cast-in-place area of prefabricated wallboard of assembled is consolidated device
CN101509286B (en) Producing and installing technique for integral cement composite heat preserving external wall and matched panel spreading and applying machine
CN107253270A (en) A kind of new prefabricated U-shaped beam and its method for prefabricating
CN204826351U (en) Close rib ceramsite concrete superimposed sheet
CN103967223A (en) Synthetic technology of novel waterproof and heat-insulating roof board
CN205444717U (en) Can prevent heavy grade roof that bottom tile drops
CN204590530U (en) Decoration of exterior wall lines
CN205046750U (en) Precast prestressed bottom plate with ribbing
CN204225354U (en) A kind of high strength prefabricated units
CN203684655U (en) Forming formwork for shear wall at expansion joints

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120711