CN202245072U - Chain conveyor for mold opening and closing of concrete tubular piles - Google Patents

Chain conveyor for mold opening and closing of concrete tubular piles Download PDF

Info

Publication number
CN202245072U
CN202245072U CN2011203518921U CN201120351892U CN202245072U CN 202245072 U CN202245072 U CN 202245072U CN 2011203518921 U CN2011203518921 U CN 2011203518921U CN 201120351892 U CN201120351892 U CN 201120351892U CN 202245072 U CN202245072 U CN 202245072U
Authority
CN
China
Prior art keywords
chain
chain conveyor
conveying belt
concrete tubular
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203518921U
Other languages
Chinese (zh)
Inventor
姜平平
叶喆宏
丁文智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUODING (NANTONG) PIPE PILES CO Ltd
Original Assignee
GUODING (NANTONG) PIPE PILES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODING (NANTONG) PIPE PILES CO Ltd filed Critical GUODING (NANTONG) PIPE PILES CO Ltd
Priority to CN2011203518921U priority Critical patent/CN202245072U/en
Application granted granted Critical
Publication of CN202245072U publication Critical patent/CN202245072U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model relates to a chain conveyor for mold opening and closing of concrete tubular piles. The chain conveyor comprises a machine frame and a chain conveying belt arranged on the machine frame and is characterized in that a plurality of brackets are fixed on the chain conveying belt and uniformly distributed along the chain conveying belt; rollers are mounted at two ends of each bracket; and guide rails for supporting the rollers are arranged on two sides of the upper layer chain of the chain conveying belt. After feeding, a concrete tubular pile mold is moved to the chain conveying belt through a manipulator on a hoist, supported on one bracket, and then moved to a stretching area through the chain conveying belt; and in the moving process of the concrete tubular pile mold, bolts on the mold are manually tightened through a pneumatic wrench. Between a relaxation procedure and a demoulding procedure, when the bolts locking a bottom mold and a cover mold are required to be released, the same method can be adopted, so that the moving step and the bolt tightening or releasing step are carried out synchronously, so as to shorten the time of the whole procedure and improve the work efficiency.

Description

A kind of concrete tubular pile opening and closing template strand bar conveyer
Technical field
The utility model relates to a kind of chain converyer, particularly a kind of concrete tubular pile opening and closing template strand bar conveyer.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except that being applied to industry, civil construction, also is widely used in each field such as bridge, harbour, railway or hydraulic engineering.
When carrying out the production of concrete tubular pile, need through feeding, stretch-draw, centrifugal, normal temperature is steam-cured, put open, master operations such as the demoulding and high-pressure steaming and cultivating.After feeding process, need bed die after the concrete tubular pile closure and cover mold be carried out bolt locking, traditional method is passed through artificial lock bolt in the original place after adopting feeding, hangs mobile through row again.Putting between Zhang Gong's preface and the stripping process, need unclamp the bolt of locking bed die and cover mold, bolt was unclamped in manual work after traditional method adopted and puts Zhang Gong's preface, lifted up into row through row again and moved.The locking of bed die and cover mold, unclamp and move and separately to carry out, increased whole activity time, inefficiency.
Summary of the invention
The technical matters that the utility model will solve provides a kind of concrete tubular pile opening and closing template strand bar conveyer that improves process efficiency.
For solving the problems of the technologies described above; The technical scheme of the utility model is: a kind of concrete tubular pile opening and closing template strand bar conveyer; Comprise frame and be located at the chain conveyor on the frame; Its innovative point is: be fixed with somely along chain conveyor well-distributed carriage on the said chain conveyor, the two ends of said carriage are equipped with roller; The chain both sides, upper strata of said chain conveyor are provided with the guide rail of one section supporting rollern.
Further, prevent down around guide rail on the upper strata that is provided with one section supporting chain below the upper strata chain of said chain conveyor.
Further, the lower floor that is provided with one section supporting rollern below lower floor's chain of said chain conveyor prevents down around guide rail.
Further, said carriage upper surface is an arc.
The advantage of the utility model is: after the feeding; The manipulator that row hangs on moves to chain conveyor with concrete pipe pile mould; After holding concrete pipe pile mould by carriage; Through chain conveyor it is moved to stretched zone, in the process that concrete pipe pile mould moves, through the gas spanner bolt of mould is locked by manual work.Putting between Zhang Gong's preface and the stripping process, in the time of need unclamping the bolt of locking bed die and cover mold, can adopt identical method, will move step and bolt and lock or unclamp step and carry out synchronously, shortening the time of whole operation, improving work efficiency.
It is anti-down around guide rail that the upper strata chain below of chain conveyor is provided with the upper strata of one section supporting chain, and it is anti-down around guide rail that lower floor chain below is provided with the lower floor of one section supporting rollern, can prevent chain following around, guarantee the more stable work of chain.
Description of drawings
Fig. 1 is the utility model concrete tubular pile opening and closing template strand bar conveyor construction scheme drawing.
Fig. 2 is along A-A line cutaway view among Fig. 1.
The specific embodiment
Like Fig. 1, shown in 2, comprise that frame 1, chain 2, drive sprocket 3, motor 9, carriage 4, roller 5, guide rail 6, upper strata are anti-anti-down around guide rail 8 around guide rail 7, lower floor down.
Above-mentioned frame 1 is provided with chain conveyor, and this chain conveyor mainly contains a pair of symmetrically arranged chain 2, the drive sprocket 3 of chain drive-belt 2, and drive sprocket 3 is connected with motor 9 through transmission device.
Be fixed with on the chain 2 of chain conveyor that some the two ends of carriage 4 are equipped with roller 5 along chain conveyor well-distributed carriage 4, the upper surface of carriage 4 is an arc.The running wheel gap length of the corresponding concrete pipe pile mould of the spacing distance of each carriage 4 makes concrete pipe pile mould be placed on 4 last times of carriage, and each running wheel of concrete pipe pile mould all drops on the carriage 4.
The chain both sides, upper strata of chain conveyor are provided with the guide rail 6 of one section supporting rollern 5, can support the carriage 4 that is positioned on the chain of upper strata.
The chain below, upper strata of chain conveyor is provided with the upper strata of one section supporting chain 2 and prevents down around guide rail 7.The lower floor that the lower floor chain below of chain conveyor is provided with one section supporting rollern 5 prevents down around guide rail 8.
During use; Concrete pipe pile mould hangs manipulator by row and places on the chain conveyor; Be positioned at carriage 4 on the chain of upper strata and hold the running wheel of concrete pipe pile mould; Realize moving of concrete pipe pile mould by the operation of motor 9 chain drive-belt load-transfer devices, in moving process, use the gas spanner that the concrete pipe pile mould that moves is carried out bolt locking by operating personal.

Claims (4)

1. concrete tubular pile opening and closing template strand bar conveyer; Comprise frame and be located at the chain conveyor on the frame; It is characterized in that: be fixed with somely along chain conveyor well-distributed carriage on the said chain conveyor, the two ends of said carriage are equipped with roller; The chain both sides, upper strata of said chain conveyor are provided with the guide rail of one section supporting rollern.
2. concrete tubular pile opening and closing template strand bar conveyer according to claim 1 is characterized in that: the chain below, upper strata of said chain conveyor is provided with the upper strata of one section supporting chain and prevents down around guide rail.
3. concrete tubular pile opening and closing template strand bar conveyer according to claim 1 is characterized in that: the lower floor that the lower floor chain below of said chain conveyor is provided with one section supporting rollern prevents down around guide rail.
4. concrete tubular pile opening and closing template strand bar conveyer according to claim 1, it is characterized in that: said carriage upper surface is an arc.
CN2011203518921U 2011-09-20 2011-09-20 Chain conveyor for mold opening and closing of concrete tubular piles Expired - Fee Related CN202245072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203518921U CN202245072U (en) 2011-09-20 2011-09-20 Chain conveyor for mold opening and closing of concrete tubular piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203518921U CN202245072U (en) 2011-09-20 2011-09-20 Chain conveyor for mold opening and closing of concrete tubular piles

Publications (1)

Publication Number Publication Date
CN202245072U true CN202245072U (en) 2012-05-30

Family

ID=46106349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203518921U Expired - Fee Related CN202245072U (en) 2011-09-20 2011-09-20 Chain conveyor for mold opening and closing of concrete tubular piles

Country Status (1)

Country Link
CN (1) CN202245072U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102442521A (en) * 2011-09-20 2012-05-09 国鼎(南通)管桩有限公司 Concrete pipe pile die opening and closing chain conveyor
CN107226420A (en) * 2017-06-29 2017-10-03 嘉兴欣创混凝土制品有限公司 The cover mold suspender of prefabricated pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102442521A (en) * 2011-09-20 2012-05-09 国鼎(南通)管桩有限公司 Concrete pipe pile die opening and closing chain conveyor
CN107226420A (en) * 2017-06-29 2017-10-03 嘉兴欣创混凝土制品有限公司 The cover mold suspender of prefabricated pile

Similar Documents

Publication Publication Date Title
CN206872036U (en) Stacking machine
CN102502269B (en) Stacking method for green bricks and stacking device for green bricks
CN202336766U (en) Double mechanical hand structure on assembly line for producing aluminum tubes and aluminum bars
CN107442595A (en) A kind of aluminium section bar drawing-in machine jaw automatic charging positioner
CN107161642A (en) One kind send die device and its application process
CN102366918B (en) Automatic production line for concrete tubular pile
CN202245072U (en) Chain conveyor for mold opening and closing of concrete tubular piles
CN102442521A (en) Concrete pipe pile die opening and closing chain conveyor
CN202848523U (en) Conveying device used for steel barrel
CN210451492U (en) Longitudinal short rib feeding and distributing device used during welding of reinforcing mesh
CN206218295U (en) A kind of Steel tube packaging machine
US3492703A (en) Apparatus for cutting a cast body of porous concrete in plastic state by means of a cutting device mounted on the apparatus
CN202318561U (en) Automatic production line for concrete pipe piles
CN106477321A (en) Profile shapes automatic basket loading equipment
CN109290927B (en) Line burnishing device
CN209635759U (en) A kind of reinforcing bar cage hoisting machine
KR100821195B1 (en) Automatic giving a summary device for section steel
RU2008116767A (en) METHOD OF PROFESSOR KARIMAN UNDERGROUND DEVELOPMENT OF LAYOUT DEPOSITS OF USEFUL FOSSILS WITH EXCHANGE OF THEIR UNITS AND TRANSPORTATION BY EXCALATORS
KR20090100979A (en) Transfer roller apparatus for heating furnace
CN206857668U (en) A kind of air-entrained concrete building block finished product packing production line
CN110239000A (en) A kind of non junction crawler belt Hubei Province formula vulcanizer and its working method
CN105751711B (en) A kind of circuit board flowing water automatic code-printing equipment
KR20110002104U (en) Apparatus for forming curvature of metal plate
CN103395117A (en) Concrete elastic support stripper machine
CN101274678B (en) Novel hexagon-shaping device of bar or pipe hexagon-shaping equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20180920