CN202215256U CN2011203600042U CN201120360004U CN202215256U CN 202215256 U CN202215256 U CN 202215256U CN 2011203600042 U CN2011203600042 U CN 2011203600042U CN 201120360004 U CN201120360004 U CN 201120360004U CN 202215256 U CN202215256 U CN 202215256U
Authority
CN
China
Prior art keywords
tunnel
reinforcing structure
fine sand
sand layer
footstep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203600042U
Other languages
Chinese (zh)
Inventor
李建军
包烨明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2011203600042U priority Critical patent/CN202215256U/en
Application granted granted Critical
Publication of CN202215256U publication Critical patent/CN202215256U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model relates to a reinforcing structure for a tunnel and specifically relates to the reinforcing structure for a fine sand layer of the tunnel. The reinforcing structure is used for solving the problems that the situations such as rear cavity, early deformation of shoring, even collapse, and the like, caused by quicksand and sand-gushing phenomena still occur during a digging process because a traditional grouting reinforcing technology adopted in a present tunnel has no cementation effect on a dry and compact fine sand layer. The reinforcing structure comprises a middle footstep and a lower footstep located in the tunnel, wherein tunnel outlines corresponding to the middle footstep and the lower footstep are both provided with rotary jetting pile layers which are tangent with the tunnel outlines and are occluded with each other. The reinforcing structure for the fine sand layer of the tunnel is reasonable and reliable in structural design, the problem of the quicksand and sand-gushing phenomena is prevented, the labor intensity is relieved while the work efficiency is greatly increased, the construction quality and safety are easily ensured, and the reinforcing structure has the advantages of simple structure, convenience in operation and low cost.

Description

Tunnel fine sand layer ruggedized construction
Technical field
The utility model relates to the ruggedized construction in tunnel, is specially a kind of tunnel fine sand layer ruggedized construction.
Background technology
Along with the fast development of the present high-speed railway of China, highway, tunnel construction certainly will will pass through various poor stratas, as pass through the xeraphium fine sand stratum that has no self-stable ability.This fine sand layer is dry, closely knit, be loose structure, receives to present quicksand at once and gush the sand state after the excavation disturbance, promptly goes out the formation accumulation body in the short time, has no blocking time.In the closely knit powder fine sand stratum, adopt traditional working measures such as grouting and reinforcing influenced by the slurries indiffusion, can't play the effect of glued layer of sand.
Summary of the invention
The traditional grouting reinforcement technique of employing can't play cementation to dry, closely knit fine sand layer to the utility model in the existing tunnel in order to solve; Cause and quicksand still can take place in the digging process and gush back cavity, the preliminary bracing large deformation that the sand phenomenon causes even the problem of situation such as cave in, a kind of tunnel fine sand layer ruggedized construction is provided.
The utility model is to adopt following technical scheme to realize: tunnel fine sand layer ruggedized construction; Comprise the step that is arranged in the tunnel and get out of a predicament or an embarrassing situation, be equipped with the rotary churning pile layer of and mutual interlock tangent on middle step and the corresponding tunnel contour line of getting out of a predicament or an embarrassing situation with outline line.Adopt the oblique rotary churning pile layer of solid matter and interlock to form barrier, the fine sand layer partition with the excavation outline line outside plays the generation that prevents to occur quicksand in the excavation supporting process and gush the sand accident.
The utility model reasonable in design is reliable, avoids quicksand and gushes the problem that the sand phenomenon takes place, and work efficiency significantly improves when reducing labor intensity, and construction quality and safety are easy to guarantee to have advantage simple in structure, easy to operate and that cost is low.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: step among the 1-, 2-gets out of a predicament or an embarrassing situation, 3-rotary churning pile layer.
The specific embodiment
Tunnel fine sand layer ruggedized construction comprises the step 1 that is arranged in the tunnel and gets out of a predicament or an embarrassing situation 2, is equipped with the rotary churning pile layer 3 of and mutual interlock tangent with outline line on the tunnel contour line of the middle step 1 and 2 correspondences of getting out of a predicament or an embarrassing situation.In the practical implementation process, according to the thickness and the first length and the mileage scope of confirming oblique jet grouting pile construction of length of bench on powder fine sand stratum; Then with corollary equipment each steps in the tunnel such as rig, grouting pump, mixers in place after, begin oblique jet grouting pile construction; After the rotary churning pile strengthening construction is accomplished this mileage section is carried out the excavation supporting construction, treat to go again after this section excavation supporting is accomplished the oblique rotary churning pile of construction, so analogize, carry out cycle operation.

Claims (1)

1. tunnel fine sand layer ruggedized construction; Comprise the step (1) that is arranged in the tunnel and get out of a predicament or an embarrassing situation (2), it is characterized in that: the rotary churning pile layer (3) that is equipped with and mutual interlock tangent on the tunnel contour line of the middle step (1) and (2) correspondence of getting out of a predicament or an embarrassing situation with outline line.
CN2011203600042U 2011-09-23 2011-09-23 Reinforcing structure for fine sand layer of tunnel Expired - Fee Related CN202215256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203600042U CN202215256U (en) 2011-09-23 2011-09-23 Reinforcing structure for fine sand layer of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203600042U CN202215256U (en) 2011-09-23 2011-09-23 Reinforcing structure for fine sand layer of tunnel

Publications (1)

Publication Number Publication Date
CN202215256U true CN202215256U (en) 2012-05-09

Family

ID=46014516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203600042U Expired - Fee Related CN202215256U (en) 2011-09-23 2011-09-23 Reinforcing structure for fine sand layer of tunnel

Country Status (1)

Country Link
CN (1) CN202215256U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102650210A (en) * 2012-05-11 2012-08-29 中铁十二局集团有限公司 Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
CN102720505A (en) * 2012-06-20 2012-10-10 中铁十二局集团有限公司 Excavation method of tunnel having upper semi-section consisting of dry fine sand layer
CN107956484A (en) * 2017-11-24 2018-04-24 中铁十局集团城市轨道交通工程有限公司 The ruggedized construction and construction method of existing shield tunnel Deformation control

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102650210A (en) * 2012-05-11 2012-08-29 中铁十二局集团有限公司 Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
CN102650210B (en) * 2012-05-11 2014-07-09 中铁十二局集团有限公司 Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
CN102720505A (en) * 2012-06-20 2012-10-10 中铁十二局集团有限公司 Excavation method of tunnel having upper semi-section consisting of dry fine sand layer
CN107956484A (en) * 2017-11-24 2018-04-24 中铁十局集团城市轨道交通工程有限公司 The ruggedized construction and construction method of existing shield tunnel Deformation control
CN107956484B (en) * 2017-11-24 2019-08-27 中铁十局集团城市轨道交通工程有限公司 The ruggedized construction and construction method of existing shield tunnel Deformation control

Similar Documents

Publication Publication Date Title
CN102797252B (en) Construction method of underground continuous walls
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN103526766B (en) Method for plugging relief well of deep foundation pit
CN103510957B (en) A kind of combined type coal uncovering method
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN202215256U (en) Reinforcing structure for fine sand layer of tunnel
CN104389612A (en) Treatment method for tunnel local collapse
CN103256060A (en) Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN104806251A (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN103291312B (en) The shield machine of three-dimensional slip casting can be realized
CN104632228B (en) Main track entering construction method for cross aisle and cross aisle
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN202866817U (en) Tunnel ruggedized construction of full face dry silty-fine sand layer
CN203796288U (en) Water seepage prevention structure used for shield entrance door employing SMW piles
CN103114576A (en) Post grouting construction method for cast-in-place concrete pile
CN103061778A (en) Tunnel arch foot circumferential high pressure jet strengthening method and construction equipment
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN205934945U (en) Prevent pressure -bearing water step -down well that wall of a well suddenly gushes
CN206246820U (en) Push-bench tool pipe
CN106193023A (en) Engage Y shape rig
CN203594453U (en) Reception base suitable for earth-pressure balanced type shield machine
CN203347799U (en) Shield tunneling machine capable of achieving three-dimensional grouting
CN203441377U (en) Simple-operation sliding device of pipe shed drilling machine
CN201407051Y (en) Karst formation pile hole wall protection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20190923

CF01 Termination of patent right due to non-payment of annual fee