CN202210352U - Remote controller and remote-controller testing device - Google Patents

Remote controller and remote-controller testing device Download PDF

Info

Publication number
CN202210352U
CN202210352U CN2011203564173U CN201120356417U CN202210352U CN 202210352 U CN202210352 U CN 202210352U CN 2011203564173 U CN2011203564173 U CN 2011203564173U CN 201120356417 U CN201120356417 U CN 201120356417U CN 202210352 U CN202210352 U CN 202210352U
Authority
CN
China
Prior art keywords
telepilot
proving installation
processing unit
central processing
control signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203564173U
Other languages
Chinese (zh)
Inventor
喻春平
张辉
陈绍林
刘仁峰
马建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN2011203564173U priority Critical patent/CN202210352U/en
Application granted granted Critical
Publication of CN202210352U publication Critical patent/CN202210352U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model discloses a remote controller and a remote-controller testing device. The remote-controller testing device comprises a central processing unit and a control switch, wherein the first end of the control switch is connected with a remote controller, and the second end is connected with the central processing unit, and used for receiving pulse control signals from the central processing unit and controlling keystrokes of the remote controller to work according to the pulse control signals, so as to test the remote controller. The utility model provides the automatic remote-controller testing device, which improves the testing efficiency of the remote controller, saves human resources and can provide reliable test information for product production launch.

Description

Telepilot and proving installation thereof
Technical field
The utility model relates to the telepilot field, in particular to a kind of telepilot and proving installation thereof.
Background technology
At present, the test of telepilot before going into operation mainly accomplished by manual work, and efficient is low, and needs a large amount of human resources of cost.Simultaneously, big through manual testing's method limitation, simulated operation is limited, and coverage rate is narrow, and data result can not be as final conclusion, and there is certain risk in operation to product.
To the inefficient problem of manual testing's telepilot in the correlation technique, effective solution is not proposed as yet at present.
The utility model content
The fundamental purpose of the utility model is to provide a kind of telepilot and proving installation thereof, to solve the low problem of manual testing's telepilot efficient.
To achieve these goals, an aspect according to the utility model provides a kind of telepilot proving installation.
Telepilot proving installation according to the utility model comprises: central processing unit; And CS; First end is connected with telepilot; Second end is connected with central processing unit, is used to receive the pulse control signal from central processing unit, and carries out work so that telepilot is tested according to the button of pulse control signal remote controllers.
Further, first end of CS is provided with a plurality of interfaces, and these a plurality of interfaces are respectively applied for and connect a plurality of telepilots.
Further, pulse control signal is the pulse control signal of frequency adjustable.
Further, CS is a relay.
Further, relay comprises: first control end, and first button that is used for remote controllers carries out work so that first button is tested; And/or second control end, second button that is used for remote controllers carries out work so that second button is tested.
Further, this telepilot proving installation also comprises: first pilot lamp, be connected between CS and the telepilot, and be used for the on off operating mode of display control switch.
Further, this telepilot proving installation also comprises: direct supply, be connected with central processing unit, and be used for supplying power to central processing unit.
Further, this telepilot proving installation also comprises: second pilot lamp, be connected between direct supply and the central processing unit, and be used to show the power supply state of direct supply.
To achieve these goals, according to the utility model on the other hand, a kind of telepilot is provided.
This telepilot comprises: receiver module is used for the received pulse control signal; And control module, be used for carrying out work according to the button of pulse control signal remote controllers.
Through the utility model, adopt to comprise telepilot proving installation: central processing unit with the lower part; And CS; First end of this CS is connected with telepilot, and second end is connected with central processing unit, is used to receive the pulse control signal from central processing unit; And carry out work so that telepilot is tested according to the button of pulse control signal remote controllers; Solve the inefficient problem of manual testing's telepilot, and then reached the testing efficiency that improves telepilot, saved human resources.
Description of drawings
The accompanying drawing that constitutes the application's a part is used to provide the further understanding to the utility model, and illustrative examples of the utility model and explanation thereof are used to explain the utility model, do not constitute the improper qualification to the utility model.In the accompanying drawings:
Fig. 1 is the block diagram according to the telepilot proving installation of the utility model first embodiment;
Fig. 2 is the block diagram according to the telepilot proving installation of the utility model second embodiment;
Fig. 3 is the connection synoptic diagram according to the telepilot proving installation of the utility model embodiment;
Fig. 4 is the block diagram according to the telepilot of the utility model embodiment; And
Fig. 5 is the process flow diagram according to the telepilot method of testing of the utility model embodiment.
Embodiment
Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.Below with reference to accompanying drawing and combine embodiment to specify the utility model.
Fig. 1 is the block diagram according to the telepilot proving installation of the utility model first embodiment, and is as shown in Figure 1, and this telepilot proving installation comprises: central processing unit 01; And CS 02; First end is connected with telepilot; Second end is connected with central processing unit 01, is used to receive the pulse control signal from central processing unit 01, and carries out work so that telepilot is tested according to the button of pulse control signal remote controllers.
Adopt the telepilot proving installation of this embodiment, the pulse signal of central processing unit 01 output, CS 02 carries out work according to the button of this control signal remote controllers; The realization remote controller key is constantly worked, and has simulated the situation of user when using a teleswitch button, the practical effect that can test telepilot; The tester only needs the execution result of checking tested telepilot of not timing to get final product; Improve the testing efficiency of telepilot, save human resources, ensure test mass.
In order further to improve testing efficiency, realize testing a plurality of telepilots at one time simultaneously, preferably, first end of CS 02 is provided with a plurality of interfaces, and these a plurality of interfaces are respectively applied for and connect a plurality of telepilots.At present telepilot of test need the special messenger to spend 72.6 hours with common alkaline battery (10 working days) just can have preliminary conclusion, but through the required artificial cumulative time of this proving installation only need 1 hour, can greatly practice thrift human resources.
For the comprehensive simulated user multiple keying frequency possibly occur when the remote controller, preferably, pulse control signal is the pulse control signal of frequency adjustable.The pulse control signal of central processing unit output different frequency is perhaps controlled central processing unit output pulse signal speed through variable resistor, all can reach the frequency adjustable of pulse control signal.
The tester can intuitively confirm the duty of CS for ease, and preferably, this telepilot proving installation also comprises: first pilot lamp 03, be connected between CS 02 and the telepilot, and be used for the on off operating mode of display control switch 02.When CS 02 goes wrong, can in time react through first pilot lamp 03, avoid the fault of CS 02 is thought by mistake the fault of telepilot, thus the test result that must make mistake.
In order to make the tester can move freely this proving installation, preferably, this telepilot proving installation also comprises: direct supply, be connected with central processing unit, and be used for supplying power to central processing unit.In the process of proving installation work, can supply power to central processing unit through external circuit, also can pass through built-in DC power supply.Adopt the former method simple in structure, but use inconvenience, adopt the latter's method, the use that makes proving installation is the tested person environmental restraint not.
The user in time changes direct supply when electric quantity of power supply deficiency or power supply break down for ease, and this telepilot proving installation also comprises: second pilot lamp, be connected between direct supply and the central processing unit, and be used to show the power supply state of direct supply.
Fig. 2 is the block diagram according to the telepilot proving installation of the utility model second embodiment; As shown in Figure 2; The CS of this proving installation is a relay; Central processing unit is that CPU can receive external signal generating means input and puts into pulse signal, also can be through software control self generation pulse control signal, carry out work through the direct pilot relay of pulse control signal with the button of remote controllers.Between power supply and CPU, be provided with power lights, between relay and telepilot, be provided with pilot lamp.
Adopt this embodiment, regulate according to testing requirement paired pulses control signal, CPU controls relay adhesive, disconnection according to the frequency that receives; The duty of relay can be pointed out by status indicator lamp; Relay is connected with telepilot, thereby realizes control of remote controller is improved the testing efficiency of telepilot; Save human resources, ensure test mass.
Press a plurality of buttons for analog subscriber simultaneously at synchronization, preferably, relay comprises: first control end, and first button that is used for remote controllers carries out work so that first button is tested; And/or second control end, second button that is used for remote controllers carries out work so that second button is tested.
Adopt adjustable and the proving installation that simultaneously can a plurality of buttons of remote controllers of pulsed frequency, can effectively simulate the abnormal problem that occurs some extreme cases under, for example the user continuously repeatedly by same button, the user presses situation such as a plurality of buttons simultaneously.
Fig. 3 is the connection synoptic diagram according to the telepilot proving installation of the utility model embodiment, and is as shown in Figure 3, and the output terminal out of power supply connects the power interface Vcc of CPU, for CPU provides required direct supply.The power unit output terminal connects a pilot lamp, points out the state of power supply.CPU obtains required power supply and starts working, and sends the port that pulse control signal is given relay through cpu port.The pulsed frequency speed has determined the flicker frequency of adhesive, opening velocity and the pilot lamp of relay, the direct remote controllers of relay.For analog subscriber at synchronization a plurality of buttons of button simultaneously, CPU is provided with a plurality of signal output control terminal mouths, a plurality of receiver ports of relay relative set and telepilot control port are with a plurality of buttons of remote controllers.Adopt this telepilot proving installation, simulate continuous button and press a plurality of keys simultaneously, can test deadlock, exceptional reset, demonstration mess code in the telepilot use, can not send out signal, keys deactivation, signaling mistake and battery electric quantity cruising time etc. problem.
Fig. 4 is the block diagram according to the telepilot of the utility model embodiment, and is as shown in Figure 4, and this telepilot comprises: receiver module 10 is used for the received pulse control signal; And control module 30, be used for carrying out work according to the button of pulse control signal remote controllers.
Adopt this telepilot, any one telepilot proving installation that can use this embodiment to describe is tested, and improves testing efficiency, has saved human resources.
Fig. 5 is the process flow diagram according to the telepilot method of testing of the utility model embodiment, and is as shown in Figure 5, and this method comprises that following step S102 is to step S104:
Step S102: telepilot received pulse control signal;
Step S104: telepilot carries out work according to the button of pulse control signal remote controllers.
Adopt this method of testing, control by pulse control signal, solved the inefficient problem that causes by the manual testing in the conventional test methodologies, improved efficient, saved human resources according to the button work of telepilot.And can further regulate according to actual operating position paired pulses control signal, realize the simulation under the extreme operating position of telepilot, make test data more convincing through software.
From above description; Can find out that the utility model has been realized following technique effect: the button through the pulse control signal remote controllers carries out work so that telepilot is tested, and has improved the testing efficiency of telepilot; Save human resources, and widened the test coverage rate.
The preferred embodiment that the above is merely the utility model is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within the spirit and principle of the utility model, any modification of being done, be equal to replacement, improvement etc., all should be included in the protection domain of the utility model.

Claims (9)

1. a telepilot proving installation is characterized in that, comprising:
Central processing unit; And
CS; First end is connected with telepilot; Second end is connected with said central processing unit, is used to receive the pulse control signal from said central processing unit, and carries out work so that said telepilot is tested according to the button that said pulse control signal is controlled said telepilot.
2. telepilot proving installation according to claim 1 is characterized in that, first end of said CS is provided with a plurality of interfaces, and said a plurality of interfaces are respectively applied for and connect a plurality of telepilots.
3. telepilot proving installation according to claim 1 is characterized in that, said pulse control signal is the pulse control signal of frequency adjustable.
4. telepilot proving installation according to claim 1 is characterized in that, said CS is a relay.
5. telepilot proving installation according to claim 4 is characterized in that, said relay comprises:
First control end, first button that is used to control said telepilot carries out work so that said first button is tested; And/or
Second control end, second button that is used to control said telepilot carries out work so that said second button is tested.
6. telepilot proving installation according to claim 1 is characterized in that, also comprises:
First pilot lamp is connected between said CS and the said telepilot, is used to show the on off operating mode of said CS.
7. telepilot proving installation according to claim 1 is characterized in that, also comprises:
Direct supply is connected with said central processing unit, is used for to said central processing unit power supply.
8. telepilot proving installation according to claim 7 is characterized in that, also comprises:
Second pilot lamp is connected between said direct supply and the said central processing unit, is used to show the power supply state of said direct supply.
9. a telepilot is characterized in that, comprising:
Receiver module is used for the received pulse control signal; And
Control module is used for carrying out work according to the button of said pulse control signal remote controllers.
CN2011203564173U 2011-09-21 2011-09-21 Remote controller and remote-controller testing device Expired - Lifetime CN202210352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203564173U CN202210352U (en) 2011-09-21 2011-09-21 Remote controller and remote-controller testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203564173U CN202210352U (en) 2011-09-21 2011-09-21 Remote controller and remote-controller testing device

Publications (1)

Publication Number Publication Date
CN202210352U true CN202210352U (en) 2012-05-02

Family

ID=45989895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203564173U Expired - Lifetime CN202210352U (en) 2011-09-21 2011-09-21 Remote controller and remote-controller testing device

Country Status (1)

Country Link
CN (1) CN202210352U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103021158A (en) * 2011-09-21 2013-04-03 珠海格力电器股份有限公司 Remote controller, and testing device and method thereof
CN104483587A (en) * 2014-12-05 2015-04-01 深圳市创荣发电子有限公司 Control product batch testing method
CN108122404A (en) * 2017-10-24 2018-06-05 珠海格力电器股份有限公司 A kind of RF transmitter and its fault detection method, device and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103021158A (en) * 2011-09-21 2013-04-03 珠海格力电器股份有限公司 Remote controller, and testing device and method thereof
CN103021158B (en) * 2011-09-21 2015-07-22 珠海格力电器股份有限公司 Remote controller, and testing device and method thereof
CN104483587A (en) * 2014-12-05 2015-04-01 深圳市创荣发电子有限公司 Control product batch testing method
CN108122404A (en) * 2017-10-24 2018-06-05 珠海格力电器股份有限公司 A kind of RF transmitter and its fault detection method, device and storage medium
CN108122404B (en) * 2017-10-24 2021-04-27 珠海格力电器股份有限公司 Radio frequency transmitting device and fault detection method, device and storage medium thereof

Similar Documents

Publication Publication Date Title
CN202679467U (en) Power socket system controlled by intelligent mobile phone
CN202210352U (en) Remote controller and remote-controller testing device
CN103021158B (en) Remote controller, and testing device and method thereof
CN111984479A (en) Method and system for carrying out startup and shutdown and restart tests on Android mainboard based on single chip microcomputer
CN203396869U (en) Integrated test equipment
CN202502391U (en) Intelligent home control extending system
CN103676919A (en) Test system of industrial control equipment
CN210954700U (en) Control device of wireless remote control intelligent switch
CN202305726U (en) Ageing monitoring equipment for distributors
CN201269927Y (en) Antenna simulator/controller for radar
CN205015664U (en) Photovoltaic drive analogue means
CN210466051U (en) Fault injection test system for redundant flight control computer
CN103259734A (en) Router with remote control timing function
CN203313471U (en) Lamp control apparatus
CN106602314A (en) Buttonless alarm and power-cut power strip based on GPRS/GSM
CN203070517U (en) MBUS (meter-bus) main unit device with single slave structure
CN203243352U (en) Router with remote control and timing functions
CN202794914U (en) Novel multifunctional switch controller
CN101183328A (en) Computer universal serial bus interface device time-limited timing controller
CN206313443U (en) Can near-field communication control time set
CN216490549U (en) Router startup and shutdown testing device
CN219676299U (en) Beidou three-communication positioning module batch test system
CN103593037A (en) Geophysics instrument soft shutting method and system
CN204065813U (en) Based on multiple ring main unit environmental monitoring systems of GSM
CN215416320U (en) Modbus module of execution controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120502