CN202170478U - Snow fence for railways - Google Patents
Snow fence for railways Download PDFInfo
- Publication number
- CN202170478U CN202170478U CN 201120237646 CN201120237646U CN202170478U CN 202170478 U CN202170478 U CN 202170478U CN 201120237646 CN201120237646 CN 201120237646 CN 201120237646 U CN201120237646 U CN 201120237646U CN 202170478 U CN202170478 U CN 202170478U
- Authority
- CN
- China
- Prior art keywords
- snow
- fence
- railways
- vertical columns
- years
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model relates to the technical field of railway buildings, in particular to a snow fence for railways. The snow fence is an effective way of protecting the railways from wind blowing and snow disasters. Existing snow fences at home and abroad are various in types. Most of the existing snow fences adopt wood structures and belong to light structures, thereby being convenient to move. Service life is kept between 3 years and 5 years. a small part of the existing snow fences adopt concrete structures, accordingly service life can reach 3 years to 60 years, but the structure is heavy and cannot be moved. The snow fence is provided with concrete fixing columns, and cellular protection nets and punched galvanized steel plates are arranged between the cellular protection nets and fixed through effective connection parts. The snow fence is made of light materials, thereby being flexible in construction, short in period, stable in structure and easy to dismount. The snow fence is arranged at two ends of railways, thereby being capable of effectively preventing wind and snow, preventing the railways from being buried by snow blown by wind and guaranteeing safety of railway train operation in hazardous areas.
Description
Technical field
The utility model railway construction technical field is specifically related to a kind of railway snow hurdle.
Background technology
Smart she Huo Tielu is positioned at Xinjiang Uygur Autonomous Regions western Mongolian Autonomous Prefecture of Bortala and Kazak Autonomous Prefecture of Ili; Total length 286km is the electric railway that China's article one is carried out the snow injury control comprehensively, and circuit is through the about 60km in snow injury area; This district's accumulated snow is deep; The 30 years one maximum accumulated snow 221cm of chance, snowslide along the line, wind snow endanger bigger, serious harm railway operation safety.Circuit passes through snow injury area 26.701km with the roadbed form; Snowslide area 0.875km wherein, wind snowfield district 25.826km, especially cutting location; The accident that wind snow is buried railway takes place more easily; Be not only smart her Huo Tielu, comparatively frequent area takes place in snow injury in all, all presses for suitable snow injury prevention and cure project and ensures railway operation safety.Resistance snow fence hurdle is to avoid railway to suffer comparatively one of effective method of wind snow disaster evil, and domestic extrernal resistance snow fence hurdle pattern is more, adopts wooden structures more basically, belongs to light structures, be convenient to move, but the life-span maintains 3 to 5 years basically; Few part adopts concrete structure, though the life-span can reach 30 ~ 60 years, structure is heavy, can not move.
Summary of the invention
The purpose of the utility model provides a kind ofly can play anti-wind and snow effect, prevent a kind of railway snow hurdle that rail is buried by wind snow.
The technical scheme that the utility model adopted is:
A kind of railway snow hurdle includes vertical columns, it is characterized in that:
Two fence wire rope up and down are set between the described vertical columns, are fixed tightly on the vertical columns through U type kayser;
Be provided with cellular protective screening between two fence wire rope about described, cellular protective screening fixes through connecting line and fence wire rope, and cellular protective screening fixes through pressing from both sides gauze pad sheet and bolt and vertical columns;
Be fixed with the punching galvanized steel plain sheet of horizontal stripe shape on the described cellular protective screening.
The vertical columns that is positioned at the fence end is fixed on the earth anchor through tractive anchoring wire rope.
The utlity model has following advantage:
Light material is selected on the utility model resistance snow fence hurdle for use, construction flexibly and the cycle shorter, structure is firm, dismounting is provided with at the railway two ends easily, can play effectively anti-wind and snow effect, prevents that railway from being buried by wind snow, ensures the railway operation safety in the multiple district of snow injury.
Description of drawings
Fig. 1 is the utility model structural representation.
Among the figure, 1-tractive anchoring wire rope, 2-fence wire rope, 3-folder gauze pad sheet, the cellular protective screening of 4-, the 5-galvanized steel plain sheet that punches, 6-earth anchor, 7-ground, 8-vertical columns, 9-U type kayser.
The specific embodiment
Below in conjunction with the specific embodiment the utility model is carried out detailed explanation.
The described a kind of railway snow hurdle of the utility model is provided with into the vertical columns 8 of row; Adopt C25 reinforced concrete prefabricated, ground upper section size 20 * 20cm, underground sectional dimension 30 * 30cm; Ground upper height 3.0m; The following 0.25m of underground buried depth to the depth of frost penetration, and be not less than 1.0m, following 15cm place, 15cm place and column top reserves φ 16mm and wears the steel cable hole on the ground.Two fence wire rope 2 up and down are set between the vertical columns 8, adopt φ 13 galvanized steel wire ropes, be fixed tightly on the vertical columns 8 through U type kayser 9 after passing the steel cable hole.Be provided with cellular protective screening 4 between two fence wire rope 2 up and down, cellular protective screening 4 fixes through connecting line and fence wire rope 2, and cellular protective screening 4 fixes through pressing from both sides gauze pad sheet 3 and bolt and vertical columns 8.Cellular protective screening 4 adopts TRW III (P) type, and width 2.7m, material are that zinc-coated wire outsourcing covered plastics layer is made; Technical indicator: mesh 135 * 90mm, line footpath φ 3.6mm, single intensity is greater than 450MPa; Every square metre of intensity is greater than 25kN, elongation per unit length 10~20%, and covered plastics layer intensity is extended greater than 200%; Net base material zinc content is 250g/m, and application life is more than 50 years.Be fixed with the punching galvanized steel plain sheet 5 of horizontal stripe shape on the cellular protective screening 4, punching galvanized steel plain sheet 5 is selected the low-carbon (LC) galvanized steel plain sheet for use, thickness 0.5mm, and length 280cm, width 18cm, punching galvanized steel plain sheet 5 intensity, hardness are carried out the requirement of 235# steel GB.
The vertical columns 8 that is positioned at the fence end is fixed on the earth anchor 6 through tractive anchoring wire rope 1.Earth anchor 6 sizes 20 * 20 * 30cm adopts the C15 concrete for making, is embedded in underground and is not less than 1.0m.
Construction sequence is following:
1) earlier prefabricated vertical columns 8 and earth anchor 6 are answered once-cast, smooth surface, no bubble when prefabricated;
2) vertical columns 8 and earth anchor 6 are fixed in assigned address;
3) treat that vertical columns 8 is firm after, wear the steel cable hole with what fence wire rope 2 passed vertical columns 8, beginning tractive fence wire rope 2, fence wire rope 2 should be fully stressed during through vertical columns 8;
4) tractive finishes, and employing φ 16mmU type kayser 9 blocks fence wire rope 2 in vertical columns 8 both sides in the back, vertical columns 8 is fixed in fence wire rope 2 relevant positions, in order to avoid fence wire rope 2 moves;
5) tractive anchoring wire rope 1 is set in the fence end, is fixed on the earth anchor 6.During 1 anchoring of two ends tractive anchoring wire rope, with wire rope tractor tension tractive anchoring wire rope 1, making that whole section fence is stressed can anchoring after evenly;
6) cellular protective screening 4 is launched; Both sides adopt φ 3.2mm connecting line to be banded on the fence wire rope 2 up and down, and bounding wire intensity is greater than 400MPa, and left and right sides and column adopt the zinc-plated connecting bolt of φ 14mm; Wire side requires smooth, fully is connected stressed with vertical columns 8;
7) on cellular protective screening 4 wire sides, hang subsides punching galvanized steel plain sheet 5 at last, spacing 9cm should be evenly attractive in appearance during layout, and punching galvanized steel plain sheet 5 usefulness are fixedly connected with the bounding wire of cellular protective screening 4 with quality.
Claims (2)
1. a railway snow hurdle includes vertical columns (8), it is characterized in that:
Two fence wire rope (2) up and down are set between the described vertical columns (8), are fixed tightly on the vertical columns (8) through U type kayser (9);
Be provided with cellular protective screening (4) between two fence wire rope (2) about described; Cellular protective screening (4) fixes through connecting line and fence wire rope (2), and cellular protective screening (4) fixes through pressing from both sides gauze pad sheet (3) and bolt and vertical columns (8);
Be fixed with the punching galvanized steel plain sheet (5) of horizontal stripe shape on the described cellular protective screening (4).
2. a kind of railway snow hurdle according to claim 1 is characterized in that:
The vertical columns (8) that is positioned at the fence end is fixed on the earth anchor (6) through tractive anchoring wire rope (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120237646 CN202170478U (en) | 2011-07-07 | 2011-07-07 | Snow fence for railways |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120237646 CN202170478U (en) | 2011-07-07 | 2011-07-07 | Snow fence for railways |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202170478U true CN202170478U (en) | 2012-03-21 |
Family
ID=45828674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120237646 Expired - Lifetime CN202170478U (en) | 2011-07-07 | 2011-07-07 | Snow fence for railways |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202170478U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787563A (en) * | 2012-09-02 | 2012-11-21 | 中铁二院工程集团有限责任公司 | Dangerous-rock and rockfall preventing structure of high-steep side slope bridge connected section |
CN103388313A (en) * | 2013-08-02 | 2013-11-13 | 天津市交通建筑设计院 | Windproof net |
CN103907492A (en) * | 2014-03-11 | 2014-07-09 | 青岛厚科化学有限公司 | Multi-purpose protective rack |
CN104018440A (en) * | 2014-06-30 | 2014-09-03 | 布鲁克(成都)工程有限公司 | Flexible barrier net |
CN105862613A (en) * | 2016-02-02 | 2016-08-17 | 中国科学院寒区旱区环境与工程研究所 | Multi-layer rotary windproof sand-storm-blocking grating suitable for strong wind area in Gobi desert |
CN106906704A (en) * | 2017-03-17 | 2017-06-30 | 中铁三局集团有限公司 | High ferro non-fragment orbit repairs roadbed physical isolation method |
CN107856577A (en) * | 2017-12-01 | 2018-03-30 | 绍兴大明电力设计院有限公司 | Permanent type high ferro protective frame |
CN113026587A (en) * | 2021-03-25 | 2021-06-25 | 新疆铁道勘察设计院有限公司 | Comprehensive prevention and control method for road edge avalanche disaster |
-
2011
- 2011-07-07 CN CN 201120237646 patent/CN202170478U/en not_active Expired - Lifetime
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787563A (en) * | 2012-09-02 | 2012-11-21 | 中铁二院工程集团有限责任公司 | Dangerous-rock and rockfall preventing structure of high-steep side slope bridge connected section |
CN103388313A (en) * | 2013-08-02 | 2013-11-13 | 天津市交通建筑设计院 | Windproof net |
CN103907492A (en) * | 2014-03-11 | 2014-07-09 | 青岛厚科化学有限公司 | Multi-purpose protective rack |
CN104018440A (en) * | 2014-06-30 | 2014-09-03 | 布鲁克(成都)工程有限公司 | Flexible barrier net |
CN105862613A (en) * | 2016-02-02 | 2016-08-17 | 中国科学院寒区旱区环境与工程研究所 | Multi-layer rotary windproof sand-storm-blocking grating suitable for strong wind area in Gobi desert |
CN105862613B (en) * | 2016-02-02 | 2018-07-06 | 中国科学院寒区旱区环境与工程研究所 | One kind is suitable for gobi strong wind area multi-layer rotary wind prevention and sand resistance bar grid grid |
CN106906704A (en) * | 2017-03-17 | 2017-06-30 | 中铁三局集团有限公司 | High ferro non-fragment orbit repairs roadbed physical isolation method |
CN106906704B (en) * | 2017-03-17 | 2019-04-02 | 中铁三局集团有限公司 | High-speed rail non-fragment orbit repairs roadbed physical isolation method |
CN107856577A (en) * | 2017-12-01 | 2018-03-30 | 绍兴大明电力设计院有限公司 | Permanent type high ferro protective frame |
CN113026587A (en) * | 2021-03-25 | 2021-06-25 | 新疆铁道勘察设计院有限公司 | Comprehensive prevention and control method for road edge avalanche disaster |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202170478U (en) | Snow fence for railways | |
CN204530433U (en) | Steel pipe pile foundation combination steel trestle | |
CN204000652U (en) | Semi-rigid protective screening for Falling Rocks protection | |
CN102677703A (en) | Falling-rock-impact-resistant open cut tunnel/shed tunnel ceiling cushion layer structure and construction method thereof | |
CN102011408B (en) | Wire pole base embedded in pit | |
CN102261078A (en) | Steel wire rope net as well as active protecting net and rockfall protecting fence containing steel wire rope net | |
CN204940966U (en) | A kind of economical Underground Garage Pillar web frame | |
CN102587301B (en) | Double-layer flexible windproof net | |
CN206070542U (en) | A kind of new stone blocking net Cable Structure for avalanche preventing and treating | |
CN108166395B (en) | A kind of construction method for building beam bridge across Business Line | |
CN212077787U (en) | Water conservancy and hydropower engineering bank wall | |
CH687031A5 (en) | A method for creating or restructuring a laengs an embankment extending edge path. | |
CN203096545U (en) | Pile composite foundation of soft soil layer of expressway | |
CN202899600U (en) | Construction site limb quick installation and removal protecting device | |
CN203116626U (en) | Multiuse blasting protector | |
CN204849649U (en) | Guardrail | |
CN205443976U (en) | Prevent wind and hinder husky fence | |
CN201162189Y (en) | Middle standing pillar structure of flexible anti-collision fence | |
CN201627154U (en) | Foreign material invasion rigid protective screen for high-speed railways | |
CN205839587U (en) | A kind of multifunction energy-saving illumination Bridge guardrail | |
CN204898943U (en) | Power consumption shear force wall | |
CN114809798A (en) | Reinforced concrete protective fence suitable for large-gradient ground | |
CN204728227U (en) | The special snow hurdle of a kind of railway | |
CN202055254U (en) | Wire rope net, and positive protective net and rock fall protective fence comprising same | |
CN210636318U (en) | Column net type rolling stone blocking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120321 |
|
CX01 | Expiry of patent term |