CN202148524U - 一种钢筋混凝土梳齿锚 - Google Patents
一种钢筋混凝土梳齿锚 Download PDFInfo
- Publication number
- CN202148524U CN202148524U CN201120211455U CN201120211455U CN202148524U CN 202148524 U CN202148524 U CN 202148524U CN 201120211455 U CN201120211455 U CN 201120211455U CN 201120211455 U CN201120211455 U CN 201120211455U CN 202148524 U CN202148524 U CN 202148524U
- Authority
- CN
- China
- Prior art keywords
- steel concrete
- anchor
- broach anchor
- broach
- entity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120211455U CN202148524U (zh) | 2011-06-22 | 2011-06-22 | 一种钢筋混凝土梳齿锚 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120211455U CN202148524U (zh) | 2011-06-22 | 2011-06-22 | 一种钢筋混凝土梳齿锚 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202148524U true CN202148524U (zh) | 2012-02-22 |
Family
ID=45589587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120211455U Expired - Lifetime CN202148524U (zh) | 2011-06-22 | 2011-06-22 | 一种钢筋混凝土梳齿锚 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202148524U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286974A (zh) * | 2011-06-22 | 2011-12-21 | 中铁大桥局股份有限公司 | 一种钢筋混凝土梳齿锚 |
CN103290855A (zh) * | 2013-06-13 | 2013-09-11 | 中交路桥华南工程有限公司 | 具有异形刃脚的围堰结构 |
-
2011
- 2011-06-22 CN CN201120211455U patent/CN202148524U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286974A (zh) * | 2011-06-22 | 2011-12-21 | 中铁大桥局股份有限公司 | 一种钢筋混凝土梳齿锚 |
CN103290855A (zh) * | 2013-06-13 | 2013-09-11 | 中交路桥华南工程有限公司 | 具有异形刃脚的围堰结构 |
CN103290855B (zh) * | 2013-06-13 | 2015-04-15 | 中交路桥华南工程有限公司 | 具有异形刃脚的围堰结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202559362U (zh) | 一种双排钢板桩与h型钢组合基坑支护结构 | |
JP5347898B2 (ja) | 既設矢板岸壁の補強構造及び方法 | |
CN101649621A (zh) | 利用钢围堰施工防撞桥墩的工艺 | |
CN202317679U (zh) | 一种龙门机床的横梁 | |
CN202148524U (zh) | 一种钢筋混凝土梳齿锚 | |
CN201762651U (zh) | 隧道仰拱栈桥 | |
CN105625198A (zh) | 加固刚架拱桥 | |
CN102286974A (zh) | 一种钢筋混凝土梳齿锚 | |
JP2014105499A (ja) | 建設機械のアッパーフレーム | |
CN102425111A (zh) | 大截面异形墩帽模板及其安装方法 | |
CN201671063U (zh) | 一种施工预制梁用的活动钢底座及其标准节 | |
CN207295746U (zh) | 一种筒型基础钢板桩组合式围堰 | |
CN204325898U (zh) | 钢板桥 | |
CN202247670U (zh) | 高架桥防震挡块 | |
CN208618291U (zh) | 一种适用于箱涵顶进的装配式重力后背墙 | |
CN218861322U (zh) | 一种减小桥台侧向力的整体桥结构 | |
CN110397094A (zh) | 满足整体式桥台桩土相互作用边界条件的构造及装配方法 | |
CN217352686U (zh) | 轮式挖掘机下车架 | |
CN204344135U (zh) | 一种仰拱矮边墙组合式加固装置及增高靴体系 | |
CN203856483U (zh) | 一种用于隧洞初期支护的加长式钢拱架结构 | |
CN202308992U (zh) | 一种h型梁的加固结构 | |
CN203530995U (zh) | 一种水上铺排架 | |
CN202323748U (zh) | 桥梁护栏施工用的高强度侧壁板 | |
CN204780566U (zh) | 一种消除桥头跳车的桥梁接地段结构 | |
CN204588479U (zh) | 万吨级可移动门式起重机的轨道结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150211 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150211 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20120222 |
|
CX01 | Expiry of patent term |