CN202131834U CN201120191332U CN201120191332U CN202131834U CN 202131834 U CN202131834 U CN 202131834U CN 201120191332 U CN201120191332 U CN 201120191332U CN 201120191332 U CN201120191332 U CN 201120191332U CN 202131834 U CN202131834 U CN 202131834U
Authority
CN
China
Prior art keywords
wall
groove
fitting
built
transformer station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120191332U
Other languages
Chinese (zh)
Inventor
孟越峰
张国喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120191332U priority Critical patent/CN202131834U/en
Application granted granted Critical
Publication of CN202131834U publication Critical patent/CN202131834U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model discloses a prefabricated substation wall, which includes a pedestal, a groove and a wall body, wherein the groove is arranged at the upper part of the pedestal; and the wall body is arranged at the upper part of the groove. All the components are uniform-standard components, so as to reduce the cost on mass production, bring convenience for construction and assembly, and further accelerate the construction speed of the substation.

Description

The preassembled transformer station enclosure wall
Technical field
The utility model relates to a kind of building unit, specifically, relates to a kind of preassembled transformer station enclosure wall.
Background technology
In recent years, for guaranteeing safety, high-quality, economic power supply, be the regional economy service better, country has raised a huge sum of money, has carried out " city net and rural power grids " improvement project.Simultaneously, inquire into,, obtain better economic benefit and social benefit in the hope of learning from other's strong points to offset one's weaknesses with regard to standardization, miniaturization Design and the construction scheme of transformer station.
But, do not solve the defective that speed of application is slow, investment is big all the time.
The utility model content
The technical problem that the utility model solved provides a kind of preassembled transformer station enclosure wall, can effectively improve the installation speed of transformer station.
Technology contents is following:
A kind of preassembled transformer station enclosure wall comprises pedestal, groove and body of wall, and said groove is arranged on said pedestal top, and said body of wall is arranged on said groove top.
Further: said body of wall is provided with the top of a wall at the top.
Further: be embedded with built-in fitting in said groove and the body of wall.
Further: be embedded with built-in fitting in said groove, body of wall and the top of a wall.
Further: the built-in fitting in the said body of wall is a single-layer steel structure.
Further: the built-in fitting in the said body of wall adopts hollow-core construction.
Further: the inside of built-in fitting is cast with layer of concrete.
Technique effect is following:
1, the utility model can reduce construction costs, practices thrift investment;
2, because each parts all adopts the unified standard parts, so it is low to produce cost in enormous quantities, and it is easy to assembly to construct, and can accelerate the speed of application of transformer station.
Description of drawings
Fig. 1 is the structural representation of enclosure wall in the utility model;
Fig. 2 is the structural representation of pier in the utility model;
Fig. 3 is the cross section structural representation of pier in the utility model;
Fig. 4 is the structural representation of main wall in the utility model;
Fig. 5 is the cross section structural representation of main wall in the utility model.
The specific embodiment
Below with reference to exemplary preferred embodiments and reference drawings, the technical scheme of the utility model is done detailed description.
As shown in Figure 1, be the structural representation of enclosure wall in the utility model.The structure of enclosure wall comprises pedestal 11, groove 12, body of wall 13, built-in fitting 14 and the top of a wall 15, and pedestal 11, groove 12, body of wall 13, built-in fitting 14 all are prefabricated components, makes respectively and pours into a mould according to unified standard before the construction.
Pedestal 11 is placed in the ditch that digs in advance; On the top of pedestal 11 are grooves 12, and body of wall 13 is placed on the top of groove 12, in order to increase the intensity of groove 12, body of wall 13 and the top of a wall 15; Can in groove 12, body of wall 13 and the top of a wall 15, bury built-in fitting 14 underground, built-in fitting 14 is a single-layer steel structure.The top of body of wall 13 is provided with the top of a wall 15, and various fixtures, for example wire gauze, lamp and watch-dog or the like can be set on the top of the top of a wall 15.
Shown in Fig. 2 and 3, Fig. 2 is the structural representation of pier in the utility model, and Fig. 3 is the cross section structural representation of pier in the utility model.Pier is owing to will bear bigger strength; So its structure is firmer than enclosure wall; The structure of pier comprises pedestal 11, groove 12, body of wall 13, built-in fitting 14 and the top of a wall 15, and the built-in fitting 14 of body of wall 13 adopts hollow-core construction, and built-in fitting 14 inside are fluid concrete not.The assembling mode of pier is identical with enclosure wall.
Like Fig. 4 and shown in Figure 5, Fig. 4 is the structural representation of main wall in the utility model, and Fig. 5 is the cross section structural representation of main wall in the utility model.The structure of main wall is firmer than pier, is usually used in the construction of large-scale substation.The structure of main wall comprises pedestal 11, groove 12, body of wall 13, built-in fitting 14 and the top of a wall 15, and the assembling mode of main wall is identical with enclosure wall.Body of wall 13 adopts hollow-core construction, body of wall 13 inner fluid concretes.

Claims (7)

1. preassembled transformer station enclosure wall, it is characterized in that: comprise pedestal, groove and body of wall, said groove is arranged on said pedestal top, and said body of wall is arranged on said groove top.
2. preassembled transformer station enclosure wall as claimed in claim 1 is characterized in that: said body of wall is provided with the top of a wall at the top.
3. preassembled transformer station enclosure wall as claimed in claim 1 is characterized in that: be embedded with built-in fitting in said groove and the body of wall.
4. preassembled transformer station enclosure wall as claimed in claim 2 is characterized in that: be embedded with built-in fitting in said groove, body of wall and the top of a wall.
5. like claim 3 or 4 described preassembled transformer station enclosure walls, it is characterized in that: the built-in fitting in the said body of wall is a single-layer steel structure.
6. like claim 3 or 4 described preassembled transformer station enclosure walls, it is characterized in that: the built-in fitting in the said body of wall adopts hollow-core construction.
7. preassembled transformer station enclosure wall as claimed in claim 6 is characterized in that: the inside of built-in fitting is cast with layer of concrete.
CN201120191332U 2011-06-08 2011-06-08 Prefabricated substation wall Expired - Fee Related CN202131834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120191332U CN202131834U (en) 2011-06-08 2011-06-08 Prefabricated substation wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120191332U CN202131834U (en) 2011-06-08 2011-06-08 Prefabricated substation wall

Publications (1)

Publication Number Publication Date
CN202131834U true CN202131834U (en) 2012-02-01

Family

ID=45520607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120191332U Expired - Fee Related CN202131834U (en) 2011-06-08 2011-06-08 Prefabricated substation wall

Country Status (1)

Country Link
CN (1) CN202131834U (en)

Similar Documents

Publication Publication Date Title
CN205530344U (en) Utility tunnel is pour to split type no mould
CN202596184U (en) Lifting node for assembly type large wallboard
CN202706297U (en) Floorslab with prefabricated water and electricity components
CN204940616U (en) The integrated prefabricated concrete folding wallboard of a kind of modular door and window
CN203393740U (en) Integral reinforced concrete foundation structure for assembling drainage pipelines
CN203296203U (en) Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node
CN202131834U (en) Prefabricated substation wall
CN201560437U (en) Manhole
CN203394019U (en) Frame type template structure for placing of concrete
CN206128114U (en) Assembled prefabricated comprehensive pipe rack
CN205777892U (en) A kind of industrialization Prefabricated enclosure wall
CN201751495U (en) Concrete pouring semi-buried box transformer substation
CN204435421U (en) A kind of assembling manhole
CN202325541U (en) Tunnel structure with improved structure
CN203247771U (en) Novel supporting column provided with steel structure
CN202745186U (en) Novel drainage inspection shaft
CN206157767U (en) Utility tunnel
CN204001945U (en) A kind of ogee chimney structure
CN202000463U (en) Prefabricated reinforced concrete drainage inspection well
CN103452220A (en) Floor slab with prefabricated water and electric components
CN201127208Y (en) Wall hanging type flower bed
CN202577563U (en) Granite floor drain plate
CN204001946U (en) A kind of " 8 " font chimney structure
CN202756793U (en) Reserved fixed pipe clamp of housing project drainage flanging
CN204042216U (en) A kind of corrugated pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201