CN201751495U - Concrete pouring semi-buried box transformer substation - Google Patents

Concrete pouring semi-buried box transformer substation Download PDF

Info

Publication number
CN201751495U
CN201751495U CN2010202446029U CN201020244602U CN201751495U CN 201751495 U CN201751495 U CN 201751495U CN 2010202446029 U CN2010202446029 U CN 2010202446029U CN 201020244602 U CN201020244602 U CN 201020244602U CN 201751495 U CN201751495 U CN 201751495U
Authority
CN
China
Prior art keywords
box body
transformer substation
box
concrete
concrete pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202446029U
Other languages
Chinese (zh)
Inventor
黄晓宁
李想
张谊诚
颜孝勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Daqo Changjiang Electric Co Ltd
Original Assignee
Jiangsu Daqo Changjiang Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Daqo Changjiang Electric Co Ltd filed Critical Jiangsu Daqo Changjiang Electric Co Ltd
Priority to CN2010202446029U priority Critical patent/CN201751495U/en
Application granted granted Critical
Publication of CN201751495U publication Critical patent/CN201751495U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model belongs to a piece of power transmission and distribution equipment and relates to a box transformer substation structure, specifically to a concrete pouring semi-buried box transformer substation, which comprises a concrete base and a box body. The box body is divided into two parts of an upper box body and a lower box body, wherein the main body of the lower box body is embedded in the concrete base and an upper end of the lower box body is connected with the upper box body via a fastener. The concrete pouring semi-buried box transformer substation of the utility model adopts a split structure and is convenient in manufacture, installation and transportation. Due to the arrangement of the concrete base at the lower part of the box body of the box transformer substation, during the site construction, only a foundation pit is required to be excavated and is tightly filled with plain soil after the box transformer substation with the concrete base is in place, reducing the civil engineering operation and the construction cost.

Description

Concrete pouring semi-underground box-type substation
Technical field
The utility model belongs to equipment for power transmission and distribution, relates to a kind of box-type substation structure, specifically is a kind of concrete pouring semi-underground box-type substation.
Background technology
The casing of tradition box-type substation is generally overall structure, and case becomes needs the cast on-site basic platform when installing, and the case change is installed on the basic platform.The defective of this structure is: case becomes the work such as needing to carry out before civil engineering, cast basis of installing, and workload is big, has increased operating expenses and cycle.
Summary of the invention
Technical problem to be solved in the utility model is, provides a kind of manufacturing and easy for installation, site operation efficient height, construction cost low.
Concrete pouring semi-underground box-type substation of the present utility model includes concrete bed and casing, described casing is divided into upper box body and lower part box two parts, the main body of lower part box is embedded in the concrete bed, and the lower part box upper end is connected with upper box body by securing member.
The utility model adopts and divides body structure, its manufacturing, installation and convenient transportation; Because the lower box that becomes at case is provided with concrete bed, only need dig out foundation pit during site operation, will have case at the bottom of the concrete and become the plain soil in back in place and tamp and get final product, reduced civil engineering work and operating expenses.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in the figure, this concrete pouring semi-underground box-type substation includes concrete bed 1 and casing 2, described casing is divided into upper box body 21 and lower part box 22 two parts, and the main body of lower part box is embedded in the concrete bed 1, and the lower part box upper end is connected with upper box body by securing member.
Concrete bed of the present utility model and casing one factory that coexists makes, and when constructing at the scene, only need dig out foundation pit, will have case at the bottom of the concrete and become the plain soil in back in place and tamp and get final product.

Claims (1)

1. concrete pouring semi-underground box-type substation, it is characterized in that: it includes concrete bed (1) and casing (2), described casing is divided into upper box body (21) and lower part box (22) two parts, the main body of lower part box is embedded in the concrete bed (1), and the lower part box upper end is connected with upper box body by securing member.
CN2010202446029U 2010-07-02 2010-07-02 Concrete pouring semi-buried box transformer substation Expired - Fee Related CN201751495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202446029U CN201751495U (en) 2010-07-02 2010-07-02 Concrete pouring semi-buried box transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202446029U CN201751495U (en) 2010-07-02 2010-07-02 Concrete pouring semi-buried box transformer substation

Publications (1)

Publication Number Publication Date
CN201751495U true CN201751495U (en) 2011-02-23

Family

ID=43601902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202446029U Expired - Fee Related CN201751495U (en) 2010-07-02 2010-07-02 Concrete pouring semi-buried box transformer substation

Country Status (1)

Country Link
CN (1) CN201751495U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639401A (en) * 2016-10-28 2017-05-10 合肥华义电气科技有限公司 Method for producing and manufacturing box structure of cast semi-buried type box type substation
CN109004567A (en) * 2018-10-17 2018-12-14 上海南桥变压器有限责任公司 Integrated container-type substation
CN116677005A (en) * 2023-04-28 2023-09-01 国网上海市电力公司 Prefabricated formula basis of assembled transformer substation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639401A (en) * 2016-10-28 2017-05-10 合肥华义电气科技有限公司 Method for producing and manufacturing box structure of cast semi-buried type box type substation
CN109004567A (en) * 2018-10-17 2018-12-14 上海南桥变压器有限责任公司 Integrated container-type substation
CN109004567B (en) * 2018-10-17 2023-12-22 上海电气集团(张家港)变压器有限公司 Integral box-type substation
CN116677005A (en) * 2023-04-28 2023-09-01 国网上海市电力公司 Prefabricated formula basis of assembled transformer substation

Similar Documents

Publication Publication Date Title
CN202627017U (en) Prefabricated integrated wind driven generator foundation
CN201751495U (en) Concrete pouring semi-buried box transformer substation
CN203229965U (en) 10 kV box-type substation basic standard module
CN210946866U (en) Prefabricated shell spiral anchor composite foundation
CN202969410U (en) SCOPE type pipe tower foundation
CN102409697A (en) Prefabricated tower and mast structure foundation
CN203393740U (en) Integral reinforced concrete foundation structure for assembling drainage pipelines
CN202787296U (en) Foundation structure of anchor pole blower fan
CN205046569U (en) Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder
CN201473966U (en) Novel paving base structure of L type suspension rigid foundation for rocky crane beams in underground plants
CN203782738U (en) Prefabricated type communication base station foundation
CN202227362U (en) Prefabricated assembly type tower mast structural foundation
CN202401469U (en) Connection type prefabricated communication tower foundation
CN201560437U (en) Manhole
CN205188982U (en) Removable system of strutting of rectangle work well
CN204356793U (en) A kind of assembling hollow reinforced concrete independent foundation
CN204435421U (en) A kind of assembling manhole
CN206657040U (en) A kind of ammeter box fixed mount
CN203129169U (en) Independent-column supporting elevator base structure in foundation pit
CN208501724U (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation
CN203429656U (en) Assembly type steel reinforced concrete four-column combined foundation for container prefabricated house
CN203531004U (en) Electric reactor foundation
CN201372776Y (en) Novel oil pumping unit base
CN202109159U (en) Anchor bolt for mounting a solar energy battery assembly
CN202363784U (en) Semi-buried environment-friendly cement box transformer substation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110223

Termination date: 20160702