CN202131598U - Rock bore type anchor structure - Google Patents

Rock bore type anchor structure Download PDF

Info

Publication number
CN202131598U
CN202131598U CN201120156618U CN201120156618U CN202131598U CN 202131598 U CN202131598 U CN 202131598U CN 201120156618 U CN201120156618 U CN 201120156618U CN 201120156618 U CN201120156618 U CN 201120156618U CN 202131598 U CN202131598 U CN 202131598U
Authority
CN
China
Prior art keywords
rock bore
rock
anchorage element
anchor structure
anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120156618U
Other languages
Chinese (zh)
Inventor
林小军
熊国斌
牟廷敏
范碧琨
梁健
曹瑞
何勇
罗建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN201120156618U priority Critical patent/CN202131598U/en
Application granted granted Critical
Publication of CN202131598U publication Critical patent/CN202131598U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a rock bore type anchor structure, which can effectively reduce the construction amount and the construction cycle so as to lower the engineering cost. The rock bore type anchor structure comprises a rock bore (10), an anchor cable (11), an outer anchoring part (20) and an inner anchoring part (30). The rock bore (10) extends into the rock and soil bearing layer inwardly from the outside of the layer. The outer anchoring part (20) and the inner anchoring part (30) are respectively fixed to the outer end and the inner end of the rock bore (10). The anchor cable (11) passes through the rock bore (10). The two ends of the anchor cable (11) are in anchoring connection with the outer anchoring part (20) and the inner anchoring part (30) respectively through an outer anchoring member (21) and an inner anchoring member (31). Due to the adoption of the rock bore type anchor structure, the construction amount and the construction cycle are effectively reduced and the building material is saved so as to lower the engineering cost. The anchor cable is easy to replace and maintain. The rock bore type anchor structure is wide in application range and is suitable for various civil engineering in need of the drawing resistance. The rock bore type anchor structure has better social and economic benefits.

Description

Petrosal foramen formula anchorage structure
Technical field
The utility model relates to the anchorage that uses in the civil engineering, the anchorage of particularly building in the fragmented rock body or the soil body.
Background technology
At present in the clay model engineering to needing the engineering of huge tension pull out force in fragmented rock body or the soil body environment, often to build gravity anchor separately.Present gravity anchor adopts concrete pouring to form the anchorage of big volume usually, provides engineering required tension pull out force through its substrate frictional resistance.Because traditional gravity anchor bulky often causes constructional difficulties when in the civil engineering that build in the mountain area, using, and is unfavorable for reducing construction costs.
The utility model content
The utility model technical problem to be solved provides a kind of petrosal foramen formula anchorage structure, can reduce construction volume and construction period effectively, and help reducing construction costs.
It is following that the utility model solves the technical scheme that its technical problem adopted:
The petrosal foramen formula anchorage structure of the utility model, it is characterized in that: it comprises petrosal foramen, anchor cable, outer anchorage element and interior anchorage element; The petrosal foramen ecto-entad extends in the geotechnical body bearing stratum, and outer anchorage element, interior anchorage element are fixedly installed on outer end, the inner of petrosal foramen respectively; Anchor cable passes petrosal foramen, and its two ends form anchor connection through outer ground tackle, interior ground tackle with outer anchorage element, interior anchorage element respectively.
The beneficial effect of the utility model is, can effectively reduce construction volume and construction period, saves constructional materials, helps reducing construction costs; Its anchor cable is easy to change, safeguard; Wide application is applicable to the various civil engineerings that need the drawing drag, has better society and economic benefit.
Description of drawings
This manual comprises like next width of cloth accompanying drawing:
Fig. 1 is the structural representation of the utility model petrosal foramen formula anchorage structure.
Component shown in the figure, toponym and pairing mark: petrosal foramen 10, anchor cable 11, outer anchorage element 20, outer ground tackle 21, interior anchorage element 30, interior ground tackle 31, service depot 32, passage 33.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
With reference to Fig. 1, the petrosal foramen formula anchorage of the utility model structure comprises petrosal foramen 10, anchor cable 11, outer anchorage element 20 and interior anchorage element 30.Petrosal foramen 10 ecto-entads extend in the geotechnical body bearing stratum, and outer anchorage element 20, interior anchorage element 30 are fixedly installed on outer end, the inner of petrosal foramen 10 respectively.Anchor cable 11 passes petrosal foramen 10; Its two ends are respectively through outer ground tackle 21, interior ground tackle 31 and outer anchorage element 20, the 30 formation anchor connections of interior anchorage element; Make geotechnical body and outer anchorage element 20, interior anchorage element 30 be combined to form a common stressed integral body, this stressed integral body becomes an anchorage that the tension pull out force can externally be provided.Said outer anchorage element 20, interior anchorage element 30 adopt reinforced concrete members usually.Compare with traditional gravity anchor, the utility model can effectively reduce construction volume and construction period, saves constructional materials, helps reducing construction costs, and its anchor cable is easy to change, safeguard.
With reference to Fig. 1, the construction sequence of the utility model is: in excavation passage 33 to the geotechnical body bearing stratum, and excavate out service depot 32; Drilling petrosal foramen 10; Outside geotechnical body with service depot 32 in build respectively steel concrete form outside anchorage element 20, interior anchorage element 30; Lay anchor cable 11, and make anchor cable 11 and outer anchorage element 20, the 30 formation anchor connections of interior anchorage element through outer ground tackle 21, interior ground tackle 31; Backfilling working chamber 32, passage 33.
Some principles of the above the utility model petrosal foramen formula anchorage structure that just explains through diagrams; Be not be to the utility model be confined to shown in described concrete structure and the scope of application in; So every the modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.

Claims (2)

1. petrosal foramen formula anchorage is constructed, and it is characterized in that: it comprises petrosal foramen (10), anchor cable (11), outer anchorage element (20) and interior anchorage element (30); Petrosal foramen (10) ecto-entad extends in the geotechnical body bearing stratum, and outer anchorage element (20), interior anchorage element (30) are fixedly installed on outer end, the inner of petrosal foramen (10) respectively; Anchor cable (11) passes petrosal foramen (10), and its two ends form anchor connection through outer ground tackle (21), interior ground tackle (31) with outer anchorage element (20), interior anchorage element (30) respectively.
2. petrosal foramen formula anchorage structure as claimed in claim 1, it is characterized in that: said outer anchorage element (20), interior anchorage element (30) are reinforced concrete member.
CN201120156618U 2011-05-17 2011-05-17 Rock bore type anchor structure Expired - Fee Related CN202131598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120156618U CN202131598U (en) 2011-05-17 2011-05-17 Rock bore type anchor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120156618U CN202131598U (en) 2011-05-17 2011-05-17 Rock bore type anchor structure

Publications (1)

Publication Number Publication Date
CN202131598U true CN202131598U (en) 2012-02-01

Family

ID=45520371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120156618U Expired - Fee Related CN202131598U (en) 2011-05-17 2011-05-17 Rock bore type anchor structure

Country Status (1)

Country Link
CN (1) CN202131598U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276670A (en) * 2013-07-01 2013-09-04 韩雪峰 Suspension bridge anchorage underground drilling comprehensive anchoring scheme

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276670A (en) * 2013-07-01 2013-09-04 韩雪峰 Suspension bridge anchorage underground drilling comprehensive anchoring scheme
CN103276670B (en) * 2013-07-01 2015-09-09 韩雪峰 A kind of suspension bridge anchorage is holed comprehensive anchoring process

Similar Documents

Publication Publication Date Title
CN2878511Y (en) Tensile compression combined self-anchored rock anchor rod
CN203475429U (en) Combined type anchor rod suitable for loess side slope
CN102704971B (en) Grouting grouting cable anchor in hole
CN203530973U (en) Composite anchor rod
CN201485863U (en) Digging rock bolt compound environment-protection basis
CN201665875U (en) Light gravity-type anti-earthquake concrete retaining wall
CN202073095U (en) Combination anchor structure
CN102535459A (en) High-efficient integrated anchor rod
CN203361150U (en) Composite anti-floating anchor pile
CN202131598U (en) Rock bore type anchor structure
CN204662246U (en) steep slope bridge pier structure
CN103147777A (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN102733380A (en) Lag pile and construction method thereof
CN202187345U (en) Gravity type anchorage construction in Karst regions
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN202124863U (en) Screw anchor excavated composite foundation
CN101565955B (en) Micro-stress shelter pile foundation strengthening method for present pile foundation
CN204510209U (en) Secondary grouting prestress anchorage cable
CN203924054U (en) Variable cross-section anchoring body anchor pole or anchor cable ruggedized construction
CN206308687U (en) A kind of precast pile
CN202064352U (en) Prestressing anchor rope anchor block structure
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation
CN202124857U (en) Splitting pile
CN202117569U (en) Drill
CN203559414U (en) H-shaped steel reinforced concrete pile provided with connected double cylinders

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20120517