CN202090339U - Pedestal pile for foundation construction of transformer substation - Google Patents

Pedestal pile for foundation construction of transformer substation Download PDF

Info

Publication number
CN202090339U
CN202090339U CN2011200984021U CN201120098402U CN202090339U CN 202090339 U CN202090339 U CN 202090339U CN 2011200984021 U CN2011200984021 U CN 2011200984021U CN 201120098402 U CN201120098402 U CN 201120098402U CN 202090339 U CN202090339 U CN 202090339U
Authority
CN
China
Prior art keywords
pile
concrete pile
concrete
enlarged footing
soil layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200984021U
Other languages
Chinese (zh)
Inventor
孙卉
孙元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN2011200984021U priority Critical patent/CN202090339U/en
Application granted granted Critical
Publication of CN202090339U publication Critical patent/CN202090339U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pedestal pile for foundation construction of a transformer substation, which comprises a hollow concrete pile. A hollow expanded toe is arranged at the lower end of the concrete pile and filled with building materials, and the concrete pile is arranged on a designed soil layer, the expanded toe is arranged on a pile-end bearing layer. Further, the expanded toe is filled with common building materials such as slurry, mortar and the like, or is filled with waste building materials such as concrete aggregates, brick aggregates and the like. The pedestal pile is particularly suitable for regions with loose soil. By means of jet-grouting expanding construction, the strength of the soil layer at the end of the concrete pile can be increased greatly, end resistance of the concrete pile can be enhanced greatly, advantages of high-intensity of the body of the concrete pile and high end resistance thereof are functioned and combined sufficiently so that pile top load can be transmitted to the soil layer at the end of the concrete pile effectively, and effects on reducing pile top sedimentation and improving bearing capacity are evident.

Description

Transformer station's capital construction expanded bore pile
Technical field:
The utility model relates to a kind of buildings pile, particularly relates to a kind of transformer station capital construction expanded bore pile, belongs to the realm of building construction.
Background technology:
Along with the development of modern economy, the progress of society, the scale and the territorial scope of transformer station's infrastructure constantly enlarge, and the degree of depth that ground is handled also continues to increase, and pile foundation is as a kind of deep foundation, and it adopts rate also to improve constantly.Concrete pile is a kind of rigid pile, but when soft clay area is used, often to pass thicker mud, pile side friction is on the low side, it is less than normal to add stake end soil body modulus of compressibility, and concrete pile often loses supporting capacity because of sedimentation is excessive, can not give full play to the high advantage of self intensity, supporting capacity is limited, so its range of application is restricted.
The utility model content:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, a kind of transformer station capital construction expanded bore pile is provided, satisfy the requirement of soft soil property bearing capacity.
The utility model is that the technical scheme that the technical solution problem is taked is:
A kind of transformer station capital construction expanded bore pile comprises the concrete pile of hollow, and described concrete pile lower end is provided with the enlarged footing of a hollow, the inner constructional materials of filling of enlarged footing; Described concrete pile is positioned at the soil layer design level, and described enlarged footing is positioned at bearing course at pile end.
The inner filling of described enlarged footing used constructional materials always, as slurries, mortar.
The inner construction waste material of filling of described enlarged footing is as concrete particle, brick particle.
Good effect of the present utility model is:
1, the utility model not only can be filled hole, enlarged footing cave with slurries, mortar, gravel, can also use broken concrete, the filling in the lump of brick fragment associating cement paste, not only the purpose that discarded object utilizes again can be reached, the intensity of enlarged footing itself can also be well improved.
2, the utility model can make concrete pile stake end soil layer intensity strengthen greatly, increase substantially the end resistance of concrete pile, give full play to the high advantage of concrete pile pile strength, fully in conjunction with concrete pile self intensity height and the big advantage of end resistance, make pile top load be delivered to stake end soil layer effectively, reduce a top sedimentation and improve bearing capacity, effect is obvious.
3, the utility model is particularly suitable for the area that the soil is porous, in these areas, expands the bottom application worker by churning, can make full use of the advantage of big end bearing, thereby can meet or exceed the designing requirement of bearing capacity.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
The specific embodiment:
Below in conjunction with accompanying drawing the utility model is described further:
Referring to Fig. 1, a kind of transformer station capital construction expanded bore pile, comprise the concrete pile 1 of hollow, described concrete pile 1 lower end is provided with the enlarged footing 2 of a hollow, the enlarged footing 2 inner constructional materialss of filling; Described concrete pile is positioned at the soil layer design level, and described enlarged footing 2 is positioned at bearing course at pile end.
Described enlarged footing 2 inner slurries, these constructional materialss commonly used of mortar, perhaps fill concrete particle, these construction waste material of brick particle of filling.
This utility model is particularly suitable for the area that the soil is porous, in these areas, expands the bottom application worker by churning, can make full use of the advantage of big end bearing, thereby can meet or exceed the designing requirement of bearing capacity.

Claims (3)

1. transformer station's capital construction expanded bore pile comprises the concrete pile (1) of hollow, and it is characterized in that: described concrete pile (1) lower end is provided with the enlarged footing (2) of a hollow, the inner constructional materials of filling of enlarged footing (2); Described concrete pile (1) is positioned at the soil layer design level, and described enlarged footing (2) is positioned at bearing course at pile end.
2. transformer station according to claim 1 capital construction expanded bore pile is characterized in that: the inner mortar of filling of described enlarged footing (2).
3. transformer station according to claim 1 capital construction expanded bore pile is characterized in that: the inner fill concrete particle of described enlarged footing (2).
CN2011200984021U 2011-04-07 2011-04-07 Pedestal pile for foundation construction of transformer substation Expired - Fee Related CN202090339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200984021U CN202090339U (en) 2011-04-07 2011-04-07 Pedestal pile for foundation construction of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200984021U CN202090339U (en) 2011-04-07 2011-04-07 Pedestal pile for foundation construction of transformer substation

Publications (1)

Publication Number Publication Date
CN202090339U true CN202090339U (en) 2011-12-28

Family

ID=45365416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200984021U Expired - Fee Related CN202090339U (en) 2011-04-07 2011-04-07 Pedestal pile for foundation construction of transformer substation

Country Status (1)

Country Link
CN (1) CN202090339U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284317A (en) * 2016-08-31 2017-01-04 浙江南湖建设有限公司 A kind of building pile foundation construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284317A (en) * 2016-08-31 2017-01-04 浙江南湖建设有限公司 A kind of building pile foundation construction method
CN106284317B (en) * 2016-08-31 2018-07-03 浙江南湖建设有限公司 A kind of building pile foundation construction method

Similar Documents

Publication Publication Date Title
CN201339197Y (en) Self-pressure tower tube base
CN202247575U (en) Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst
CN204401644U (en) A kind of hollow digging foundation
CN106759446A (en) A kind of hollow digging foundation of root keyed for transmission line of electricity
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN201190278Y (en) Concrete long-corn cement soil composite pile
CN202090339U (en) Pedestal pile for foundation construction of transformer substation
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN202830952U (en) Novel soft soil foundation structure
CN203729174U (en) Pile-raft composite foundation structure
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN202672142U (en) Spiral type ground stake
CN204898645U (en) Building rubbish regeneration drainage CFG stake ground
CN201981530U (en) Down hole deep dynamic compaction pile in collapsible loess area
CN204530685U (en) A kind of cement-soil stiff composite pile
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN206829168U (en) A kind of hollow digging foundation of root keyed for transmission line of electricity
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation
CN203080540U (en) Iron tower foundation of power transmission line
CN205591243U (en) Bag pocket type structure of karst punishment when doing is executed to pile foundation
CN202745032U (en) Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations
CN206521667U (en) A kind of permeable pavement construction
CN205999879U (en) Borehole thin-walled rubble fills out core slip casting pile composite foundation
CN205617365U (en) Novel stake of reinforced concrete spiral
CN202830951U (en) Steel-section-and-hard-concrete replacement single pier structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20120407