CN205591243U - Bag pocket type structure of karst punishment when doing is executed to pile foundation - Google Patents

Bag pocket type structure of karst punishment when doing is executed to pile foundation Download PDF

Info

Publication number
CN205591243U
CN205591243U CN201620419485.2U CN201620419485U CN205591243U CN 205591243 U CN205591243 U CN 205591243U CN 201620419485 U CN201620419485 U CN 201620419485U CN 205591243 U CN205591243 U CN 205591243U
Authority
CN
China
Prior art keywords
karst
pouch
bag
pile foundation
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620419485.2U
Other languages
Chinese (zh)
Inventor
罗彩红
郭蕾
陈虹
秦尚林
陈善雄
许锡昌
戴张俊
余飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Highway Administration Of Huizhou Municipality
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Highway Administration Of Huizhou Municipality
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Highway Administration Of Huizhou Municipality, Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Highway Administration Of Huizhou Municipality
Priority to CN201620419485.2U priority Critical patent/CN205591243U/en
Application granted granted Critical
Publication of CN205591243U publication Critical patent/CN205591243U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a bag pocket type structure of karst punishment when doing is executed to pile foundation mixes light material, pile foundation, stratum by bag, karst, bubble and constitutes, and the karst distributes in the stratum, and during karst embedding stratum was passed to the pile foundation, the bag bag was passed from the cylinder hole in the bag bag to the pile foundation, and the bag bag meets with the karst, is equipped with the bubble and mixes the light and expect in the bag bag. The bag bag is ring platform shape, and the height is the same with the karst height, and the cylinder hole is left at bag mind -set bottom surface center in the top surface, and bag cross section is the annular, and the cross section is unchangeable to the bottom surface internal diameter from the top surface, and the external diameter is the grow gradually. The technique is reasonable, economic environmental protection, and the effect is showing, has satisfied the demand of filling of the bulky karst foundation pile foundation of karst area construction.

Description

The bag type paste structure of karst punishment when pile foundation applies
Technical field
This utility model relates to architectural and civil engineering technical field of construction, particularly relates to the bag type paste structure of karst punishment when a kind of pile foundation applies, and it is applicable to punishment construction and the foundation stabilization of karst area large volume karst.
Background technology
The stability of the structure foundation of karst region is serious by solution cavity Effect of Fissure, and the existence of karst reduces its foundation bearing capacity, strengthens the sedimentation and deformation of ground.Therefore, in order to avoid or reduce the karst adverse effect to structure foundation, improve its foundation bearing capacity, reduce foundation settlement deformation, thus meet the building requirement to ground, it is necessary to karst region is carried out basement process.
Slip casting method is one of conventional Karst treatment technology.Existing slurry injection technique is that the serosity that utilizes pressure to solidify injects in ground space or crack by boring, grout curing or have certain cohesive force or intensity, makes a kind of method that the physical and mechanical property of rock mass improves.In karst area, often carrying out basement process with pile foundation form through solution cavity, pile foundation lacks power transmission layer in the range of solution cavity, it is therefore desirable to solution cavity is carried out injecting treatment, to provide pile side friction, play the bearing capacity of stake, and for the slip casting of karst, often injecting paste material is full of whole solution cavity cavity, owing to karst volume is excessive, needing substantial amounts of filler to be irrigated, the karst that filler is also possible to along running through runs off in a large number, thus causes waste greatly.Additionally, the note completely of karst fills compared with can providing around pile body and noting filling in the range of frictional force, can not more significantly improve the bearing capacity of pile foundation.Therefore, on the premise of ensureing pile foundation bearing capacity, the most effectively carry out karst filling, thus it is the most necessary for exploring a kind of karst pile foundation construction placement method effective, feasible, that save.
For solving the problems referred to above, study the bag type paste structure of karst punishment when a kind of pile foundation applies, karst for karst area large volume is punished, meet the needs of karst piling Technology, preferably improve rock mass globality, improve its mechanical property, improve ground, bearing capacity of pile foundation, ensure the quality of engineering, save construction investment cost, reduction of erection time, and civil engineering construction, design are the most significant.
Utility model content
The purpose of this utility model is for the karst in the unfavorable foundation that subject building upper load in civil engineering, it is to there are provided the bag type paste structure of karst punishment when a kind of pile foundation applies, rational technology, novel in design, selection is appropriate, and it is convenient to apply, efficient economizing, meet the research needs of karst area large volume karst piling Technology, for karst area civil engineering construction, great significance for design.
For solving the problems referred to above, this utility model employing techniques below measure:
The bag type paste structure of karst punishment when a kind of pile foundation applies, it is made up of pouch, karst, bubble mixing light material, pile foundation, stratum, it is characterized in that: karst is distributed in the earth formation, pile foundation embeds in stratum through karst, pile foundation cylindrical hole from pouch passes pouch, pouch connects with karst, in pouch built with bubble mixing light material.Pouch is annulus platform shape, pouch height and karst heighthIdentical, pouch leaves cylindrical hole from end face center to bottom center, and pouch cross section is annular, and cross section is constant to bottom surface internal diameter from end face, and external diameter becomes larger, pouch cross sectional inner diameter and Pile DiameterΦIdentical, end face external diameterdBigger 0.5 ~ 1.0m than Pile Diameter, end face external diameter passes through calculating formulad=Φ+ (0.5 ~ 1.0m) determines, bottom surface external diameterDAccording to karst heighthBow inclination angle with pouchθ, pass through calculating formulaD= d+2htanθDetermining, pouch inclination angle of bowing is 30 ° ~ 35 °.
Described pouch is that thin-walled elastomeric material is made, and pouch end face leaves injected hole.
In described pouch, filler is bubble mixing light material, bubble mixing light material rapid solidification molding, forms annulus mesa-shaped.
This utility model compared with prior art, has the following advantages and effect:
1) pouch is identical with karst height ensure that packing material contacts with karst top and bottom, pile foundation is made to have preferable power transmission carrier in the range of karst, contact good with casting resin of stake, the offer of pile side friction it is provided and is farthest played, making pile foundation preferably play its bearing capacity;
2) very big due to karst interior void size, it is full of and needs to expend substantial amounts of filler, the filler of molding is limited in around pile foundation by this technique by pouch, it is not necessary to be filled with whole karst, is greatly saved filler while ensureing pile foundation stress;
3) bubble mixing light material has Lightness, and density just corresponds to the 1/5~about 1/8 of portland cement concrete, can alleviate charges Integral Loading.The porous of air bubble mix light-textured soil makes it have low elastic modelling quantity, so that it has good absorption and dispersion to load.
The bag type paste structure of karst punishment when this pile foundation applies, meet the filling demand of karst area large volume karst foundation pile foundation construction, technology is reasonable, economic and environment-friendly, effect is notable, engineering design, construction there is preferable directive function, for karst area civil engineering construction, great significance for design.
Accompanying drawing explanation
Fig. 1 is a kind of pile foundation bag type paste structural representation of karst punishment when applying;
Fig. 2 is a kind of pile foundation bag structure schematic diagram in the bag type paste structure of karst punishment when applying.
In figure: 1 pouch, 2 karst, 3 bubble mixing light material, 4 pile foundations, 5 stratum.
Detailed description of the invention
Below according to accompanying drawing, this utility model is described in further detail:
According to Fig. 1, Fig. 2, the bag type paste structure of karst punishment when a kind of pile foundation applies, it is made up of pouch 1, karst 2, bubble mixing light material 3, pile foundation 4, stratum 5, it is characterized in that: karst 2 is distributed in stratum 5, pile foundation 4 embeds in stratum 5 through karst 2, and the pile foundation 4 cylindrical hole from pouch 1 passes pouch 1, pouch 1 connects with karst 2, in pouch 1 built with bubble mixing light material 3, pouch 1 is in annulus platform shape, and pouch 1 height and karst 2 are highlyhIdentical, pouch 1 leaves cylindrical hole from end face center to bottom center, and pouch 1 cross section is annular, and cross section is constant to bottom surface internal diameter from end face, and external diameter becomes larger, pouch 1 cross sectional inner diameter and pile foundation 4 diameterΦIdentical, end face external diameterdRatio pile foundation 4 diameter big 0.5 or 0.6 or 0.7 or 0.8 or 0.9 or 1.0m, end face external diameter passes through calculating formulad=Φ+ (0.5 or 0.6 or 0.7 or 0.8 or 0.9 or 1.0m) determines, bottom surface external diameterDAccording to karst 2 heighthBow inclination angle with pouch 1θ, pass through calculating formulaD= d+2htanθDetermining, pouch 1 inclination angle of bowing is 30 ° or 31 ° or 32 ° or 33 ° or 34 ° or 35 °.
Described pouch 1 is made for thin-walled elastomeric material, and pouch 1 end face leaves injected hole.
In described pouch 1, filler selects bubble mixing light material 3, bubble mixing light material 3 rapid solidification molding, forms annulus mesa-shaped.

Claims (2)

1. the bag type paste structure of karst punishment when a pile foundation applies, it is made up of pouch (1), karst (2), bubble mixing light material (3), pile foundation (4), stratum (5), it is characterized in that: karst (2) is distributed in stratum (5), pile foundation (4) embeds in stratum (5) through karst (2), the pile foundation (4) cylindrical hole from pouch (1) passes pouch (1), pouch (1) connects with karst (2), in pouch (1) built with bubble mixing light material (3), pouch (1) is in annulus platform shape, and pouch (1) height is with karst (2) highlyhIdentical, pouch (1) leaves cylindrical hole from end face center to bottom center, and pouch (1) cross section is annular, pouch (1) cross sectional inner diameter and pile foundation (4) diameterΦIdentical, end face external diameterdThe ratio big 0.5 ~ 1.0m of pile foundation (4) diameter, bottom surface external diameterDAccording to karst (2) highlyhBow inclination angle with pouch (1)θDetermining, pouch (1) inclination angle of bowing is 30 ° ~ 35 °.
The bag type paste structure of karst punishment when a kind of pile foundation the most according to claim 1 applies, it is characterised in that: described pouch (1) is that thin-walled elastomeric material is made, and pouch (1) end face leaves injected hole.
CN201620419485.2U 2016-05-10 2016-05-10 Bag pocket type structure of karst punishment when doing is executed to pile foundation Expired - Fee Related CN205591243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620419485.2U CN205591243U (en) 2016-05-10 2016-05-10 Bag pocket type structure of karst punishment when doing is executed to pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620419485.2U CN205591243U (en) 2016-05-10 2016-05-10 Bag pocket type structure of karst punishment when doing is executed to pile foundation

Publications (1)

Publication Number Publication Date
CN205591243U true CN205591243U (en) 2016-09-21

Family

ID=56930899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620419485.2U Expired - Fee Related CN205591243U (en) 2016-05-10 2016-05-10 Bag pocket type structure of karst punishment when doing is executed to pile foundation

Country Status (1)

Country Link
CN (1) CN205591243U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114990940A (en) * 2022-04-27 2022-09-02 天津鼎元软地基科技发展股份有限公司 Pile cap type ground fixing piece, manufacturing method thereof, and assembling structure and method of pile top

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114990940A (en) * 2022-04-27 2022-09-02 天津鼎元软地基科技发展股份有限公司 Pile cap type ground fixing piece, manufacturing method thereof, and assembling structure and method of pile top
CN114990940B (en) * 2022-04-27 2024-04-30 天津鼎元软地基科技发展股份有限公司 Pile cap type ground fixing piece, manufacturing method thereof, and pile top assembling structure and method

Similar Documents

Publication Publication Date Title
CN102587358B (en) Construction technology of high polymer material post-grouting squeezed cast-in-place pile
CN106121090B (en) The method of anchor connection reinforcing bar in 3D printing filled wall
CN103741678B (en) With the miniature stake of urethane slip casting of stake bag and constructional method thereof and application method
WO2019169956A1 (en) Structured cemented gravel pile and construction method therefor
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN109138011A (en) Existing building foundation stabilization and method for correcting error
CN110387877A (en) A kind of stiff composite pile construction technology
CN102409598A (en) Method for processing vehicle bump at bridge head of existing highway
CN107268599B (en) Substrate buried type large-scale filling karst cave reinforcing structure and reinforcing method
CN205591243U (en) Bag pocket type structure of karst punishment when doing is executed to pile foundation
CN105484230A (en) Pile and soil concreted and integrated composite pile and construction method thereof
CN102839647B (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN202247947U (en) Soil retaining structure with anti-sliding cement soil piles
CN102605779A (en) High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure
CN105926658B (en) The bellows note of large volume karst pile foundation construction fills fill method and structure
CN202247910U (en) Soil retaining structure with different inclination angles of anti-skid cement soil pile
CN102383422A (en) Compacted expansion mini-type mortar pile pile-forming method and pile-forming device
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN209619949U (en) A kind of core structure of native compound action
CN103410143A (en) Construction method for improving bearing capacity of hollow pile foundation
CN202202325U (en) Compacted and expanded micro mortar pile forming device
CN101892665A (en) Construction method for grouting and vibro-replacement stone pile composite foundation
CN209603123U (en) A kind of bottom-enlarging filling pile structure for cutting down negative friction
CN201981530U (en) Down hole deep dynamic compaction pile in collapsible loess area
CN207079432U (en) Treatment of soft foundation composite foundation structure layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

Termination date: 20170510