CN202064278U - Pre-buried steel plate localizator for bridge padstone - Google Patents

Pre-buried steel plate localizator for bridge padstone Download PDF

Info

Publication number
CN202064278U
CN202064278U CN2011200366185U CN201120036618U CN202064278U CN 202064278 U CN202064278 U CN 202064278U CN 2011200366185 U CN2011200366185 U CN 2011200366185U CN 201120036618 U CN201120036618 U CN 201120036618U CN 202064278 U CN202064278 U CN 202064278U
Authority
CN
China
Prior art keywords
padstone
concrete
pinner
steel plate
buried steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200366185U
Other languages
Chinese (zh)
Inventor
李友林
孟福胜
董长乐
贺景宜
言丽平
赵建军
毕沧丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cangzhou Road and Bridge Engineering Co
Original Assignee
Cangzhou Road and Bridge Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cangzhou Road and Bridge Engineering Co filed Critical Cangzhou Road and Bridge Engineering Co
Priority to CN2011200366185U priority Critical patent/CN202064278U/en
Application granted granted Critical
Publication of CN202064278U publication Critical patent/CN202064278U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pre-buried steel plate localizer for a bridge padstone. Two longitudinal beams (2) and two cross beams (3) which form a #-shaped frame and tightened by connecting bolts (4) are arranged above a padstone pre-buried steel plate (1), positioning bolts (5) are connected between the longitudinal beams (2), lower limiting devices (6) are hung on the longitudinal beams (2) and connected with four corners of the padstone pre-buried steel plate (1), and fixing and adjusting bolts (7) are connected to the outer ends of the longitudinal beams (2); and upper limiting bolts (8) are connected to the cross beams (3). The widths of the longitudinal beams can be adjusted through the positioning bolts, and through the fixing and adjusting bolts, the longitudinal beams are fixed to a capping beam template below and planimetric position and elevation of the padstone pre-buried steel plate are adjusted. The lower limiting devices are used for limiting the sinking of the padstone pre-buried steel plate, and the upper limiting bolts are used for limiting the ascent of the padstone pre-buried steel plate. After concrete pouring of a capping beam at the padstone is finished, bridge padstone steel bars and the pre-buried steel plate are promptly installed and fixed through the localizer, and when the planimetric position and elevation of the padstone pre-buried steel plate are adjusted accurately, a padstone template is erected; before the prehardening of capping beam concrete, padstone concrete is poured; and when padstone concrete pouring is finished, the upper limiting bolts and the lower limiting devices can be loosened and then dismantled and cleaned for next padstone concrete construction. The localizer can achieve the purpose that the capping beam concrete and the padstone concrete are poured at one stage, so that the capping beam concrete and the padstone concrete are integrated, which improves the quality and durableness of the padstone concrete.

Description

Bridge pinner pre-embedded steel slab locator
Technical field
The utility model belongs to locator for building, specifically the used locator of road bridge steel concrete bent cap pinner construction pre-embedded steel slab.
Background technology
Steel concrete bent cap and pinner are a kind of foundation structure forms that the high-grade highway bridge generally adopts.In the prior art, generally be to build bent cap earlier, second stage concrete is built pinner again.Its operating principle is: build the bent cap concrete, and pre-buried pinner steel plate and reinforcing bar thereof, when treating that the bent cap concrete strength satisfies the second stage concrete construction requirement, the cutter hair is disposed pinner place bent cap concrete, builds the pinner concrete.The deficiency of its existence is: 1, because of being full of reinforcing bar in its pinner concrete cross section, and its end face is welded with the pinner pre-embedded steel slab, and pinner place bent cap concrete chisel hair is difficult to realize, causes pinner and two phase of bent cap concrete can not effectively become one; 2, in a single day the pinner pre-embedded steel slab plane coordinates occurs and absolute altitude is defective, disposes very difficulty, causes pinner pre-embedded steel slab absolute altitude qualification rate low.
Summary of the invention
The purpose of the utility model is to overcome the above-mentioned deficiency of prior art, and a kind of bridge pinner pre-embedded steel slab locator is provided, and has realized that bent cap, pinner concrete first phase build, and result of use is good.
For reaching above-mentioned purpose, the utility model is taked following technical scheme: the utility model comprises: the pinner pre-embedded steel slab, it is characterized in that: above the pinner pre-embedded steel slab, be provided with longeron, crossbeam, longeron, crossbeam are respectively two, the two intersects formation well cabinet frame and fastening by connecting bolt in length and breadth, be connected with positioning bolt between two longerons, be hung with lower retainer and pinner pre-embedded steel slab on longeron four jiaos are connected, and the outer end activity of longeron is connected with the secured adjusted bolt; The movable upper limit bolt that is connected with corresponding to the pinner pre-embedded steel slab on the crossbeam.
The utility model is taked technique scheme, has following beneficial effect: the intersecting parallels locating rack that the utility model adopts longeron, crossbeam to form, regulate longeron width and accurate fixing longeron position by positioning bolt, by connecting bolt that longeron, crossbeam is fastening.By the secured adjusted bolt longeron is fixed on the bent cap template of below, adjusts pinner pre-embedded steel slab plan-position and absolute altitude.With the lower retainer pinner pre-embedded steel slab of slinging, restriction pinner pre-embedded steel slab sinks.Float with upper limit spiral limits pre-embedded steel slab.After treating that the bent cap concreting of pinner place is finished, bridge pinner reinforcing bar, pre-embedded steel slab are installed at once, and are fixed with locator, treat that pinner pre-embedded steel slab plan-position and absolute altitude are accurately adjusted after, a upright pinner template; Before the bent cap concrete initial set, build the pinner concrete.After treating that pinner concreting is finished, can become flexible pinner pre-embedded steel slab upper limit spiral and lower retainer, be used for next pinner concrete construction after the dismounting cleaning.The utility model can satisfy the purpose that bent cap, pinner concrete first phase are built, and makes its one-tenth as a whole, has improved pinner quality of concrete and durability.
Description of drawings
Below in conjunction with drawings and Examples the utility model is elaborated:
Fig. 1 is the utility model plan structure sketch.
Fig. 2 is the utility model master TV structure sketch.
Mark among the figure: 1-pinner pre-embedded steel slab, 2-longeron, 3-crossbeam, 4-connecting bolt, 5-positioning bolt, 6-lower retainer, 7-secured adjusted bolt, 8-upper limit bolt, 9-long slot bore, the interim hanger of 10-, 11-length adjustment device.
The specific embodiment
By Fig. 1, shown in Figure 2, the utility model comprises: pinner pre-embedded steel slab 1, longeron 2, crossbeam 3.Longeron 2, crossbeam 3 are respectively two, be positioned at the top of pinner pre-embedded steel slab 1, longeron 2, crossbeam 3 intersect formation well cabinet frame and fastening by connecting bolt 4 in length and breadth, between two longerons 2, be connected with positioning bolt 5, be hung with lower retainer 6 and pinner pre-embedded steel slab 1 on longeron 2 four jiaos are connected, and the outer end activity of longeron 2 is connected with secured adjusted bolt 7; The movable upper limit bolt 8 that is connected with corresponding to pinner pre-embedded steel slab 1 on the crossbeam 3.
On crossbeam 3, offer the long slot bore 9 that is used to regulate width corresponding to connecting bolt 4.
Four jiaos of pinner pre-embedded steel slab 1 are provided with interim hanger 10, are used to connect lower retainer 6, and lower retainer 6 is provided with length adjustment device 11, is used to limit pinner pre-embedded steel slab 1.
Before the pinner concrete strength satisfies construction requirement, plate-girder and installs, the interim hanger of pinner pre-embedded steel slab is cut away, polishes and get final product.
The utility model is applied in the construction of a bridge of Coast Expressway, and effect is fine.Begin to adopt traditional handicraft, have 30% pinner pre-embedded steel slab disadvantages such as injustice, sinking, come-up to occur.After using the utility model, disadvantages such as injustice, sinking, come-up do not appear in the pinner pre-embedded steel slab, have obtained the good effect of qualification rate 100%.After to be used for many highway bridge pinner project benefits remarkable.

Claims (3)

1. bridge pinner pre-embedded steel slab locator, it comprises: pinner pre-embedded steel slab (1), it is characterized in that: be provided with longeron (2), crossbeam (3) in the top of pinner pre-embedded steel slab (1), longeron (2), crossbeam (3) are respectively two, the two intersects formation well cabinet frame and fastening by connecting bolt (4) in length and breadth, between two longerons (2), be connected with positioning bolt (5), be hung with lower retainer (6) and pinner pre-embedded steel slab (1) on longeron (2) four jiaos are connected, and the outer end activity of longeron (2) is connected with secured adjusted bolt (7); Crossbeam (3) activity of going up is connected with the upper limit bolt (8) corresponding to pinner pre-embedded steel slab (1).
2. a kind of bridge pinner pre-embedded steel slab locator according to claim 1 is characterized in that: go up at crossbeam (3) and offer long slot bore (9) corresponding to connecting bolt (4).
3. a kind of bridge pinner pre-embedded steel slab locator according to claim 1 is characterized in that: four jiaos of pinner pre-embedded steel slab (1) are provided with interim hanger (10).
CN2011200366185U 2011-02-11 2011-02-11 Pre-buried steel plate localizator for bridge padstone Expired - Fee Related CN202064278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200366185U CN202064278U (en) 2011-02-11 2011-02-11 Pre-buried steel plate localizator for bridge padstone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200366185U CN202064278U (en) 2011-02-11 2011-02-11 Pre-buried steel plate localizator for bridge padstone

Publications (1)

Publication Number Publication Date
CN202064278U true CN202064278U (en) 2011-12-07

Family

ID=45058144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200366185U Expired - Fee Related CN202064278U (en) 2011-02-11 2011-02-11 Pre-buried steel plate localizator for bridge padstone

Country Status (1)

Country Link
CN (1) CN202064278U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532870A (en) * 2014-11-28 2015-04-22 国网河南省电力公司洛阳供电公司 Embedded bolt positioning device
CN110700607A (en) * 2019-10-11 2020-01-17 中建八局第一建设有限公司 Pre-buried steel sheet installation device of isolation bearing
CN110777650A (en) * 2019-11-29 2020-02-11 中建三局第二建设工程有限责任公司 Embedded assembly type expansion joint overlength installation suspension leveling positioning system and construction method
CN111231076A (en) * 2020-01-20 2020-06-05 中交一公局集团有限公司 Template device for cushion stone
CN111705671A (en) * 2020-06-24 2020-09-25 中铁五局集团有限公司 Pre-buried rag bolt location and inspection fixture
CN114606874A (en) * 2022-03-16 2022-06-10 中铁二院昆明勘察设计研究院有限责任公司 Deviation rectifying treatment method for railway deviation three-line abutment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532870A (en) * 2014-11-28 2015-04-22 国网河南省电力公司洛阳供电公司 Embedded bolt positioning device
CN110700607A (en) * 2019-10-11 2020-01-17 中建八局第一建设有限公司 Pre-buried steel sheet installation device of isolation bearing
CN110777650A (en) * 2019-11-29 2020-02-11 中建三局第二建设工程有限责任公司 Embedded assembly type expansion joint overlength installation suspension leveling positioning system and construction method
CN111231076A (en) * 2020-01-20 2020-06-05 中交一公局集团有限公司 Template device for cushion stone
CN111231076B (en) * 2020-01-20 2024-05-17 中交一公局集团有限公司 Stone mattress template device
CN111705671A (en) * 2020-06-24 2020-09-25 中铁五局集团有限公司 Pre-buried rag bolt location and inspection fixture
CN114606874A (en) * 2022-03-16 2022-06-10 中铁二院昆明勘察设计研究院有限责任公司 Deviation rectifying treatment method for railway deviation three-line abutment
CN114606874B (en) * 2022-03-16 2023-09-19 中铁二院昆明勘察设计研究院有限责任公司 Railway deviation three-wire bridge abutment deviation rectifying processing method

Similar Documents

Publication Publication Date Title
CN202064278U (en) Pre-buried steel plate localizator for bridge padstone
CN201103243Y (en) Leveling device for plane pouring
CN202248876U (en) Shear wall door/window opening formwork composite device
CN103174166B (en) A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof
CN103255717A (en) Method for constructing hit-preventing wall
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
CN103334379A (en) Construction method for hanging part of anti-collision guardrail on expressway
CN106702907A (en) Bridge guardrail base adjustable flange plate construction method
CN210858007U (en) Adjustable turnover type counter-ridge mold for kitchens and bathrooms
CN105525571A (en) Construction method of anti-collision wall
CN207761334U (en) A kind of adjustable late poured band support device
CN206625260U (en) A kind of detachable late poured band support post
CN202672722U (en) Supporting structure for beam bottom template of pouring beam
CN203475310U (en) Formwork for concrete slabs of composite steel-concrete box girders
CN206859018U (en) The Combined formwork structure being exclusively used in airport pavement concrete construction
CN207846228U (en) Prestressed concrete simply supported box girder face pre-buried sleeve positioning die
CN109837924B (en) Construction method for intersection part of lattice column and main body structure of foundation pit support
CN204039902U (en) Bridge precast beam plate lower support structure and levelling device
CN202622992U (en) Universal-type post-tensioned T-beam precast pedestal with detachable modules and adjustable steel members
CN116290089A (en) Concrete pouring template system for underground space and construction method thereof
CN215889394U (en) Device for controlling elevation of cast large-area floor slab
CN212052342U (en) Construction auxiliary tool is transversely widened to prestressed concrete T roof beam of scalable regulation
CN204876558U (en) A locating support that is used for cast -in -place reversed beam side form board of going up
CN211775752U (en) Outer batter post template steel pipe scaffold support system
CN210797262U (en) Be applied to combination formula steel mould of flower groove concrete barrier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

Termination date: 20170211