CN111231076A - Template device for cushion stone - Google Patents

Template device for cushion stone Download PDF

Info

Publication number
CN111231076A
CN111231076A CN202010067913.0A CN202010067913A CN111231076A CN 111231076 A CN111231076 A CN 111231076A CN 202010067913 A CN202010067913 A CN 202010067913A CN 111231076 A CN111231076 A CN 111231076A
Authority
CN
China
Prior art keywords
stone
template
fixing plate
fixing plates
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010067913.0A
Other languages
Chinese (zh)
Other versions
CN111231076B (en
Inventor
刘启亮
李荐
杨贝贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202010067913.0A priority Critical patent/CN111231076B/en
Publication of CN111231076A publication Critical patent/CN111231076A/en
Application granted granted Critical
Publication of CN111231076B publication Critical patent/CN111231076B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention provides a cushion stone template device, which relates to the technical field of prefabricated bent caps, and comprises two first fixing plates which are arranged side by side and vertically, wherein at least one pair of second fixing plates are vertically arranged between the two first fixing plates; each pair of the second fixing plate and the two first fixing plates form a positioning frame for positioning a pouring position of the cushion stone. The first fixing plate of the stone pad template device can move on the prefabricated cover beam, when the stone pad is poured on the prefabricated cover beam, the first fixing plate can be moved repeatedly to adjust the position of the pre-poured stone pad, the positions of each pair of second fixing plates and the first fixing plate are fixed relatively, the fact that the spacing distance between the stone pads is adjusted when the pouring position of the stone pad is adjusted through the first fixing plate is guaranteed, the stone pad does not need to be pre-embedded or bar-planted, deviation of the position of the poured stone pad caused by insufficient accuracy of pre-embedding or bar-planting is avoided, and the problem of correcting the pouring position in a later period is also avoided.

Description

Template device for cushion stone
Technical Field
The invention relates to the technical field of prefabricated bent caps, in particular to a base stone template device.
Background
The pouring of the existing cushion stone needs pre-buried steel bars or embedded steel bars for positioning and fixing, when the cushion stone and the bent cap are poured together, positioning steel bars and template fixing steel bars are welded on the bent cap steel bars, then the template is installed, and concrete is poured.
The method has the problems that the positioning accuracy of the poured cushion stone is not high, and the later adjustment is not easy.
Disclosure of Invention
The invention aims to provide a template device for a pad stone, which aims to solve the technical problem that the positioning precision of the pad stone is not enough when the existing pad stone is poured.
The invention provides a stone pad template device which comprises two first fixing plates which are arranged side by side and vertically, wherein at least one pair of second fixing plates are vertically arranged between the two first fixing plates;
each pair of the second fixing plate and the two first fixing plates form a positioning frame for positioning a pouring position of the cushion stone;
and a cushion stone template component for pouring a cushion stone is arranged in the positioning frame.
Furthermore, connecting pieces for connecting side dies of the prefabricated cover beam are arranged at two ends of the first fixing plate.
Furthermore, the connecting piece is a C-shaped buckle, and a locking bolt for locking is arranged on the connecting piece.
Furthermore, the locating frame by first fixed plate with four lateral walls are formed to the second fixed plate, all be provided with the positioning bolt who is used for adjusting and fixed padstone template subassembly position on the lateral wall.
Furthermore, the positioning bolts arranged on the side walls are correspondingly arranged.
Further, the base stone template component comprises a base stone template main body and a clamp, wherein the clamp sleeve is arranged outside the base stone template main body.
Further, the base stone template component also comprises a plurality of wedge-shaped fastening blocks, and the tip parts of the wedge-shaped fastening blocks are inserted between the clamp and the base stone template main body.
Further, each pair of the second fixing plates is detachably connected with the first fixing plate.
Furthermore, a plurality of adjusting holes used for being connected with the second fixing plate are formed in the first fixing plate.
Further, two pairs of second fixing plates are arranged between the two first fixing plates.
The first fixing plate of the stone pad template device can move on the prefabricated cover beam, when the stone pad is poured on the prefabricated cover beam, the first fixing plate can be moved repeatedly to adjust the position of the pre-poured stone pad, the positions of each pair of second fixing plates and the first fixing plate are fixed relatively, the fact that the spacing distance between the stone pads is adjusted when the pouring position of the stone pad is adjusted through the first fixing plate is guaranteed, the stone pad does not need to be pre-embedded or bar-planted, deviation of the position of the poured stone pad caused by insufficient accuracy of pre-embedding or bar-planting is avoided, and the problem of correcting the pouring position in a later period is also avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic structural diagram of a stone pad template device according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of another angle of the stone pad template device according to the embodiment of the present invention.
Icon: 100-a first fixing plate; 200-a second fixation plate; 300-a main body of a stone template; 400-clamping a hoop; 500-a wedge-shaped fastening block; 600-positioning bolts; 700-connecting piece.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 and 2, the stone pad formwork device provided by the invention comprises two first fixing plates 100 which are arranged side by side and vertically, and at least one pair of second fixing plates 200 are vertically arranged between the two first fixing plates 100;
each pair of the second fixing plate 200 and the two first fixing plates 100 form a positioning frame for positioning a pouring position of a cushion stone;
and a cushion stone template component for pouring a cushion stone is arranged in the positioning frame.
In some embodiments, the bolsters are positioned on the precast capping beams, and the bolsters are cast on the precast capping beams, typically after the precast capping beams are cast; two first fixed plates 100 that just place side by side and vertically can make the locating frame remove the position of pouring of stone pad after on prefabricated bent cap, pour behind the stone template subassembly of installation in the installing frame, before not pouring, the position homoenergetic of pouring can carry out simple and convenient regulation.
In the prior art, positioning steel bars and template fixing steel bars are welded on cover beam steel bars, and then templates are installed for pouring concrete; if the pouring position is found to be deviated after the template is installed, the pouring position is not easy to adjust.
This stone backing template device does not need the fixed muscle of template, makes things convenient for the adjustment of later stage to the position of stone backing template subassembly.
Based on the above embodiment, further, the two ends of the first fixing plate 100 are provided with connectors 700 connected with the side dies of the prefabricated capping beam.
The first fixing plate 100 is connected with the side mold of the prefabricated bent cap through the connecting piece 700, so that the position of the cushion stone template device is fixed, and the problem that the movement of the cushion stone template device affects the pouring accuracy when a cushion stone is poured is avoided.
In order to better connect the base stone formwork device with the side mold of the prefabricated capping beam, further, the connecting member 700 is a C-shaped buckle, and a locking bolt for locking is arranged on the connecting member 700.
The connecting piece 700 is a C-shaped buckle, the lower end of the connecting piece 700 is connected with the side die of the prefabricated bent cap, the other end of the connecting piece 700 locks the first fixing plate 100 through a locking bolt, so that one end of the first fixing plate 100 is fixed on the side die of the prefabricated bent cap, the two ends of the first fixing plate 100 are connected with the side die of the prefabricated bent cap, and the position of the stone-padding template device is fixed.
Based on the above embodiment, further, the positioning frame is formed by the first fixing plate 100 and the second fixing plate 200 to have four side walls, and the side walls are respectively provided with a positioning bolt 600 for adjusting and fixing the position of the bolster template assembly.
The base stone template component is located the locating frame, and has certain distance between the lateral wall of base stone template component and locating frame, for the position that more accurate location base stone was pour, adjust the position of base stone template component in the locating frame through positioning bolt 600 to it is fixed, utilize positioning bolt 600 to accurately adjust the position of base stone template component once more, thereby make the position accuracy that the base stone was pour higher.
Be provided with the screw hole on the lateral wall of posting, positioning bolt 600 is located the screw hole, makes the length of the part of deepening positioning bolt 600 in the posting adjust through rotatory positioning bolt 600, and four positioning bolt 600 mutually support, make the base stone module subassembly be located the position of waiting to pour the base stone, improve the accuracy of pouring.
In order to make the movement of the stone pad template assembly in the positioning frame more stable and not easy to incline, further, the positioning bolts 600 arranged on the opposite side walls are correspondingly arranged.
General positioning bolt 600 all sets up the middle part at the lateral wall, and each positioning bolt 600 all can make the stone backing template produce the power that moves to opposite lateral wall, mutually supports through four positioning bolt 600, makes the stone backing template subassembly be located the position of pouring of stone backing, and the stone backing of pouring is more accurate.
Based on above-mentioned embodiment basis, further, the base stone template subassembly includes base stone template main part 300 and clamp 400, the clamp 400 cover sets up outside the base stone template main part 300.
Generally, the height of the base stone template assembly is higher than that of the positioning frame, so that the base stone template assembly can keep a fixed shape when a base stone is poured, the clamp 400 is sleeved outside the base stone template assembly, and the firmness degree of the whole base stone template assembly is increased.
Based on the above embodiment, further, the stone pad template assembly further comprises a plurality of wedge-shaped fastening blocks 500, wherein the tip of each wedge-shaped fastening block 500 is inserted between the hoop 400 and the stone pad template body 300.
The utility model discloses a template device is used in when pouring the bed stone, fixes a position and acts as the function of template, needs the dismantlement of relapse, has the dismantlement that can conveniently relapse for bed stone template device has sufficient intensity.
There is certain clearance between clamp 400 and the base stone template main part 300, makes things convenient for clamp 400 cover to take off outside base stone template main part 300 and from base stone template main part 300.
In order to enable the clamp 400 to cut a fixing effect on the stone pad template main body 300, a wedge-shaped fastening block 500 is provided between the clamp 400 and the stone pad template main body 300, a tip of the wedge-shaped fastening block 500 is inserted between the clamp 400 and the stone pad template main body 300 from top to bottom, and a plurality of wedge-shaped fastening blocks 500 are provided between the clamp 400 and the stone pad template main body 300 for firmly fixing the clamp 400 outside the stone pad template main body 300.
Based on the above embodiment, further, each pair of the second fixing plates 200 is detachably connected to the first fixing plate 100.
In order to make the pouring of the base stone on the prefabricated bent cap of different specifications of this base stone template device can adapt to, second fixed plate 200 and first fixed plate 100 can be dismantled and connect, change different second fixed plate 200, form different locating frames to satisfy and fix a position the base stone of different specifications on the prefabricated bent cap of difference.
Based on the above embodiment, further, a plurality of adjusting holes for connecting with the second fixing plate 200 are provided on the first fixing plate 100.
A plurality of adjusting holes are formed in the first fixing plate 100, and the second fixing plate 200 is fixed to the adjusting holes of the first fixing plate 100 by bolts; because a plurality of adjusting holes are formed in the first fixing plate 100, the mounting position of the second fixing plate 200 on the first fixing plate 100 can be adjusted at will, so that the positions of the adjusting positioning frames and the distance between the adjacent positioning frames are adjusted, and the requirement for pouring the cushion stones on various prefabricated cover beams is met.
Utilize the bolt to make first fixed plate 100 and second fixed plate 200 connect, made things convenient for the dismantlement and the installation in later stage, made it can use repeatedly on the prefabricated bent cap of difference, on the different specification's of the prefabricated bent cap of same specification bed stone.
Based on the above embodiment, further, two pairs of second fixing plates 200 are disposed between the two first fixing plates 100.
A plurality of bolsters may be provided on the precast capping beam, but it is sufficient to provide two general bolsters in the width direction of the precast capping beam, i.e., two pairs of second fixing plates 200 between the two first fixing plates 100.
A plurality of cushion stones can be arranged in the width direction of the precast capping beam, that is, the number of the second fixing plates 200 with the same number of pairs as the cushion stones is arranged between the two first fixing plates 100.
The first fixing plate 100 of the stone pad template device can move on the prefabricated cover beam, when the stone pad is poured on the prefabricated cover beam, the first fixing plate 100 can be moved repeatedly to adjust the position of the precast stone pad, and the positions of each pair of second fixing plates 200 and the first fixing plate 100 are fixed relatively, so that the adjustment of the spacing distance between the stone pads is ensured to be completed when the pouring position of the stone pad is adjusted through the first fixing plate 100, and the stone pad pouring does not need to be pre-buried or bar-planted, thereby avoiding the deviation of the position of the poured stone pad caused by insufficient accuracy of pre-buried or bar-planted, and also avoiding the problem of correcting the pouring position by later-stage adjustment.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. A stone pad template device is characterized by comprising two first fixing plates which are arranged side by side and vertically, and at least one pair of second fixing plates are vertically arranged between the two first fixing plates;
each pair of the second fixing plate and the two first fixing plates form a positioning frame for positioning a pouring position of the cushion stone;
and a cushion stone template component for pouring a cushion stone is arranged in the positioning frame.
2. The apparatus of claim 1, wherein both ends of the first fixing plate are provided with connectors to side molds of the precast capping beam.
3. The stepping stone template device according to claim 2, wherein the connecting piece is a C-shaped buckle, and a locking bolt for locking is arranged on the connecting piece.
4. The stone pad template device of claim 1, wherein the positioning frame is formed by the first fixing plate and the second fixing plate into four side walls, and positioning bolts for adjusting and fixing the position of the stone pad template assembly are arranged on the side walls.
5. The stepping stone template device according to claim 4, wherein the positioning bolts are correspondingly arranged relative to the positioning bolts arranged on the side wall.
6. The stepping stone template device of claim 1, wherein the stepping stone template assembly comprises a stepping stone template body and a collar, the collar being disposed outside the stepping stone template body.
7. The stone template assembly of claim 6, wherein the stone template assembly further comprises a plurality of wedge-shaped fastening blocks,
the tip of the wedge-shaped fastening block is inserted between the clamp and the base stone template main body.
8. The stepping stone template device of claim 1, wherein each pair of said second fixing plates is removably connected to said first fixing plate.
9. The stepping stone template device according to claim 8, wherein the first fixing plate is provided with a plurality of adjusting holes for connecting with the second fixing plate.
10. The stepping stone template device according to claim 1, wherein two pairs of second fixing plates are provided between two first fixing plates.
CN202010067913.0A 2020-01-20 2020-01-20 Stone mattress template device Active CN111231076B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010067913.0A CN111231076B (en) 2020-01-20 2020-01-20 Stone mattress template device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010067913.0A CN111231076B (en) 2020-01-20 2020-01-20 Stone mattress template device

Publications (2)

Publication Number Publication Date
CN111231076A true CN111231076A (en) 2020-06-05
CN111231076B CN111231076B (en) 2024-05-17

Family

ID=70878096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010067913.0A Active CN111231076B (en) 2020-01-20 2020-01-20 Stone mattress template device

Country Status (1)

Country Link
CN (1) CN111231076B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262394A (en) * 2022-02-23 2022-11-01 中国五冶集团有限公司 Method for erecting rapid supporting and detaching template for bridge pad stone

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110000088A1 (en) * 2008-02-01 2011-01-06 Compact-Habit, S. L. Method and installation for manufacturing hollow, prismatic, modular reinforced concrete elements, and element obtained therefrom
CN202064278U (en) * 2011-02-11 2011-12-07 沧州路桥工程公司 Pre-buried steel plate localizator for bridge padstone
CN203866708U (en) * 2014-02-24 2014-10-08 吴洪 Support pad stone formwork
CN205242276U (en) * 2015-12-25 2016-05-18 北京市政建设集团有限责任公司 Base stone template structure
CN107030862A (en) * 2016-12-30 2017-08-11 中铁四局集团第四工程有限公司 Pier shaft pinner embedded hole hole-forming device
CN206438413U (en) * 2017-01-07 2017-08-25 中铁十五局集团第五工程有限公司 Bridge pier pinner preformed hole alignment system
CN206448177U (en) * 2017-01-23 2017-08-29 中铁二局第四工程有限公司 A kind of bridge pinner fixture components
CN107988919A (en) * 2018-01-04 2018-05-04 中铁八局集团第三工程有限公司 A kind of and the pinner and pre-embedded bolt hole forming equipment of bridge pier cap synchronous construction
CN208219413U (en) * 2017-09-08 2018-12-11 无锡市交通工程有限公司 A kind of bridge pad pinner adjustable template device
CN110485302A (en) * 2019-08-13 2019-11-22 中铁广州工程局集团第三工程有限公司 A kind of bridge pier cap and pinner concrete synchronous construction method
CN211541689U (en) * 2020-01-20 2020-09-22 中交一公局集团有限公司 Template device for cushion stone

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110000088A1 (en) * 2008-02-01 2011-01-06 Compact-Habit, S. L. Method and installation for manufacturing hollow, prismatic, modular reinforced concrete elements, and element obtained therefrom
CN202064278U (en) * 2011-02-11 2011-12-07 沧州路桥工程公司 Pre-buried steel plate localizator for bridge padstone
CN203866708U (en) * 2014-02-24 2014-10-08 吴洪 Support pad stone formwork
CN205242276U (en) * 2015-12-25 2016-05-18 北京市政建设集团有限责任公司 Base stone template structure
CN107030862A (en) * 2016-12-30 2017-08-11 中铁四局集团第四工程有限公司 Pier shaft pinner embedded hole hole-forming device
CN206438413U (en) * 2017-01-07 2017-08-25 中铁十五局集团第五工程有限公司 Bridge pier pinner preformed hole alignment system
CN206448177U (en) * 2017-01-23 2017-08-29 中铁二局第四工程有限公司 A kind of bridge pinner fixture components
CN208219413U (en) * 2017-09-08 2018-12-11 无锡市交通工程有限公司 A kind of bridge pad pinner adjustable template device
CN107988919A (en) * 2018-01-04 2018-05-04 中铁八局集团第三工程有限公司 A kind of and the pinner and pre-embedded bolt hole forming equipment of bridge pier cap synchronous construction
CN110485302A (en) * 2019-08-13 2019-11-22 中铁广州工程局集团第三工程有限公司 A kind of bridge pier cap and pinner concrete synchronous construction method
CN211541689U (en) * 2020-01-20 2020-09-22 中交一公局集团有限公司 Template device for cushion stone

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262394A (en) * 2022-02-23 2022-11-01 中国五冶集团有限公司 Method for erecting rapid supporting and detaching template for bridge pad stone

Also Published As

Publication number Publication date
CN111231076B (en) 2024-05-17

Similar Documents

Publication Publication Date Title
CN211541689U (en) Template device for cushion stone
CN110016858B (en) Bridge support filler stone template system with adjustable elevation
CN208219413U (en) A kind of bridge pad pinner adjustable template device
CN210013117U (en) Bridge beam supports stone backing template system with adjustable elevation
CN110394884A (en) A kind of prefabricated post adjustable mold and prefabricated column production method
CN111231076A (en) Template device for cushion stone
CN210858007U (en) Adjustable turnover type counter-ridge mold for kitchens and bathrooms
CN211646015U (en) Four corners adjustment crab-bolt stone setting template
CN110318540A (en) A kind of civil construction pours device with concrete slab
CN208343138U (en) A kind of concrete mats block shaping device
CN107599137B (en) Detachable mold assembly and construction method thereof
CN215055310U (en) Adjustable steel column mold
CN206289653U (en) New contact net foundation construction mould
CN212764009U (en) Superposed beam die
CN113279590A (en) Clamping fixture for fixing embedded steel bars of pier body
CN110394882A (en) A kind of precast beam production mould and assembly and disassembly method
CN212312338U (en) Frock is fixed to built-in fitting
CN220150333U (en) A template structure for concrete side ditch construction
CN217352795U (en) Type construction equipment is moulded with drainage pipe area to municipal construction
CN219568497U (en) Counter-force positioning device
CN217579752U (en) Adjustable anticollision wall template
CN220266319U (en) Four-corner leveling bolt shaping steel mould
CN219951706U (en) A climbing form device for small-section receipts slope mound
CN218436666U (en) Hollow thin wall mound bent cap construction support body
CN217168942U (en) Multi-item adjustable small box girder comb plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant