CN205242276U - Base stone template structure - Google Patents

Base stone template structure Download PDF

Info

Publication number
CN205242276U
CN205242276U CN201521105456.0U CN201521105456U CN205242276U CN 205242276 U CN205242276 U CN 205242276U CN 201521105456 U CN201521105456 U CN 201521105456U CN 205242276 U CN205242276 U CN 205242276U
Authority
CN
China
Prior art keywords
pinner
panel
formwork structure
pipe
elbow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521105456.0U
Other languages
Chinese (zh)
Inventor
王松
徐霖
孟昭晖
刘鑫
王来顺
杨建辉
袁俊
刘淼
孟兴业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201521105456.0U priority Critical patent/CN205242276U/en
Application granted granted Critical
Publication of CN205242276U publication Critical patent/CN205242276U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a base stone template structure, wherein, first panel (10) are two, the same and mutual disposition of shape, second panel (11) are two, and the same and mutual disposition of shape is two between first panel (10) to it becomes to hold the inside cavity of treating the prosthetic base stone of going up to enclose with first panel (10), the both ends head of screw rod (14) passes first panel (10) of mutual disposition respectively, triangle back of the body wedge (13) embolias the both ends head of above -mentioned screw rod (14), fasten with retaining member (15) in triangle back of the body wedge (13) the outside. The utility model discloses very light just processing cycle is short, the on -site Assembly of being convenient for, dismantlement, especially adapted restoration of going up base stone. And can monitor the packing degree of the filler material in the template.

Description

A kind of pinner formwork structure
Technical field
The utility model relates to field of track traffic, especially relates to a kind of pinner formwork structure.
Background technology
China's track traffic is at present in fast-developing period, and elevated bridge is because of its economy institute accountingHeavy larger, wherein to connect of vitals bearing as the upper and lower structure of bridge auxiliary for bearing pad stonePart, arranging of it is mainly the facility for guaranteeing that bridge pad is installed, adjusted, replaces.
Current pinner template mainly adopts sizing steel template, fills disease pinner and repair material in templateMaterial, and form entirety with patching material. This sizing steel template requires machining accuracy high, processing weekPhase is long, for the whether full very difficult very first time judgement of packing material in template.
Utility model content
The purpose of this utility model is to have the problems referred to above for existing pinner template, and a kind of pinner is providedFormwork structure, its process-cycle is short, facilitates installation and removal, can be applicable to the reparation of pinner.
The purpose of this utility model is achieved through the following technical solutions:
The utility model provides a kind of pinner formwork structure, and it comprises:
The first panel, the second panel, the triangle back of the body wedge, screw rod and locking member;
Described the first panel is two, the identical and positioned opposite of shape; The second panel is two, shapeIdentical and be oppositely disposed between two described the first panels, and surround inner empty with described the first panelChamber, this cavity holds upper pinner to be repaired;
Described back cord is arranged on the outside of described the first panel;
The two ends of described screw rod is passed respectively the first panel of positioned opposite;
Described triangle back of the body cover of wedge enters the two ends of above-mentioned screw rod; The outside locking member of described triangle back of the body wedgeFastening.
More preferably, described pinner formwork structure also comprises:
One or more blast pipes;
Described in being arranged on, described blast pipe is embedded in the side of pinner formwork structure, or described in being arranged onIn the inner space that the first panel and the second panel surround;
The least significant end of described blast pipe is higher than the upper surface of the upper steel plate of upper pinner bottom, most significant end higher thanThe upper surface of pinner formwork structure.
More preferably, described blast pipe is connected with elbow, and the other end of described elbow upward; Or,Described blast pipe is connected with elbow, and the other end of described elbow upward and be connected with blast pipe and matchAdd senior executive.
More preferably, described blast pipe is pvc pipe, and the diameter of described blast pipe is Φ 10mm~Φ30mm。
More preferably, described pinner formwork structure also comprises:
Grout pipe;
The least significant end of described grout pipe exceeds the upper surface of pinner on bearing, and the other end exceeds described pinnerThe upper surface of formwork structure.
More preferably, described grout pipe is connected with elbow, and the other end of described elbow upward; Or,Described grout pipe is connected with elbow, and the other end of described elbow upward and be connected with grout pipe and matchAdd senior executive.
More preferably, described grout pipe is pvc pipe, and the diameter of described grout pipe is Φ 30mm~Φ70mm。
More preferably, the outside of described the second panel (11) is also provided with described back cord (12). .
More preferably, described the first panel and the second panel adopt the phenolic aldehyde that thickness is 1.0cm~2cm to coverFilm bamboo offset plate, forms according to pinner dimensioned on scene.
More preferably, described triangle back of the body wedge processes with the lumps of wood according to on-the-spot actual angle.
Can be found out by above-mentioned the technical solution of the utility model, the utlity model has following technology effectReally:
The utility model adopts phenolic aldehyde film coating plywood to form template as panel and the little lumps of wood as back cordMain body, very light and the process-cycle is short, be convenient to Assembling, dismounting, be very applicable to upper pinnerRepair.
In addition, can monitor the filling extent of the packing material in template by the setting of blast pipe.
In addition, can conveniently be in the milk by the setting of grout pipe, and the position grouting that can ensure to come to nothing is enriched.
Brief description of the drawings
Fig. 1 is the exploded perspective view of the utility model example structure;
Fig. 2 is the structural representation of the utility model embodiment;
Fig. 3 is the use state reference map of the utility model pinner formwork structure.
In accompanying drawing:
Bearing 01, upper pinner 02, upper steel plate 03, pinner formwork structure 04, the first panel 10,Two panels 11, back cord 12, triangle back cord 13, screw rod 14, locking member 15, blast pipe 16 and groutingPipe 17.
Detailed description of the invention
Below with reference to accompanying drawing, the utility model is described in further details.
The utility model provides a kind of pinner formwork structure, and its structure as depicted in figs. 1 and 2, comprising:
The first panel 10, the second panel 11, back cord 12, the triangle back of the body wedge 13, screw rod 14 and locking member15。
The length of above-mentioned the first panel 10 is greater than the length of the second panel 11, and the two adopts thickness to beThe phenolic aldehyde bamboo plywood coated with film of 1.0cm~2cm, adopts woodworking machinery machine-shaping according to on-the-spot pinner size.The first panel 10 is two, the identical and positioned opposite of shape; The second panel 11 is two, shape phaseWith and be oppositely disposed between two described the first panels 10, and in surrounding with described the first panel 10Cavities, this cavity holds upper pinner to be repaired.
Above-mentioned back cord 12 is two, and it adopts the lumps of wood, and as adopted the 3*4 lumps of wood, it is separately positioned on phaseTo the outside of the first panel 10 of arranging, between itself and the first panel 10, fix with iron nail.
In order to reinforce the utility model, the outside of above-mentioned the second panel 11 also can arrange back cord 12, twoBetween person, fix with iron nail.
The two ends of above-mentioned screw rod 14 is passed respectively the first panel 10 of positioned opposite, this screw rod successively14 can adopt the screw rod of φ 14~φ 18, preferably adopt the screw rod of φ 16.
Above-mentioned triangle back of the body wedge 13 is processed with the lumps of wood according to on-the-spot actual angle, and it is inserted in above-mentioned screw rod 14Two ends, and near the outside of back cord 12, and use the locking member 15 supporting with above-mentioned screw rod 14 (asNut and packing ring) fastening.
The side of above-mentioned pinner formwork structure is also offered grout hole and is penetrated grout pipe 17. This grout pipe 17Least significant end exceed the upper surface of pinner on bearing. This grout pipe close is inserted in one end of this grout pipe 17Envelope, the other end exceeds the upper surface of pinner formwork structure. This grout pipe can be pvc pipe, also canFor steel pipe, diameter is Φ 30mm~Φ 70mm, preferably Φ 50mm.
Above-mentioned pinner formwork structure is also buried one or more blast pipes 16 underground. This blast pipe 16 can be buried undergroundAt the side of pinner formwork structure, also can be embedded in first panel 10 and second of pinner formwork structureIn the inner space that panel 11 surrounds. When blast pipe 16 is embedded in the side of pinner formwork structure,Need the corresponding side at pinner formwork structure to offer multiple steam vents 16 and at itself and blast pipe 16Cooperation place good seal. When blast pipe 16 is embedded in internal cavities, the least significant end of this blast pipe 16 is highIn the upper surface of the upper steel plate 03 of upper pinner 02 bottom, most significant end is higher than the upper table of pinner formwork structureFace. This blast pipe 16 can be pvc pipe, can be also the pipe of other material, as rubber tube, steelPipe etc., diameter is Φ 10mm~Φ 30mm, preferred diameter is Φ 20mm.
Enrich for the position grouting that ensures to come to nothing, in the utility model, one of them blast pipe 16 connectsHave elbow, upward, the other end of elbow also can be connected with blast pipe and match the other end of its elbowAdd senior executive; Equally, one of them grout pipe 17 is connected with elbow, the other end of its elbow upward,The other end of elbow also can be connected with grout pipe matches and add senior executive. Can ensure like this blast pipeOr the most significant end of grout pipe and the distance of least significant end are not less than the difference in height threshold value of setting, thereby canCome to nothing position grouting of guarantee is enriched.
While using this pinner formwork structure, need to be at the surrounding Assembling of upper pinner to be repaired. GroupWhen dress, first a pair of back cord 12 is placed on respectively to the outside of two the first panels 10, then by firstPanel 10 penetrates respectively the two ends of screw rod 14, secondly installs successively three respectively at the two ends of screw rod 14Angle back of the body wedge 13 and locking member 15; Two the second panels 11 are arranged symmetrically with and are placed on the first panel 10Inner side, and with locking member 15 pretensions; Then adjust the position of the first panel 10 and the second panel 11,Make it be close to upper pinner to be repaired; Finally reinforce locking by locking member 15, form main template body,Mould seam crossing is sealed with sealing joint strip and quick-dry type fluid sealant; Then bury blast pipe 16 Hes undergroundGrout pipe 17, and by good the position seals of itself and the perforate of pinner formwork structure, form as shown in Figure 3Structure; Finally be in the milk by grout pipe 17 again.
Can be found out by above-mentioned embodiment of the present utility model, the utility model adopts Assembling, tears openThe mode of unloading designs, and adopts phenolic aldehyde film coating plywood to form template as panel and the little lumps of wood as back cordMain body, fixes to a pair of Screw arbor with nut at both-ends of back cord arranged outside along bridge, and close with sealing joint strip and quick-dry typeSealing is sealed mould seam crossing.
Although with preferred embodiment openly as above, embodiment does not limit this practicality to the utility modelNovel. Not departing from the spirit and scope of the utility model, any equivalence of doing changes or retouching,Belong to equally the protection domain of the utility model. Therefore protection domain of the present utility model should be with this ShenThe content that claim please defines is standard.

Claims (10)

1. a pinner formwork structure, is characterized in that, described pinner formwork structure comprises:
The first panel (10), the second panel (11), triangle back of the body wedge (13), screw rod (14) and lockingPart (15);
Described the first panel (10) is two, the identical and positioned opposite of shape; The second panel (11)Be two, shape is identical and be oppositely disposed between two described the first panels (10), and with describedThe first panel (10) surrounds internal cavities, and this cavity holds upper pinner to be repaired;
The two ends of described screw rod (14) is passed respectively first panel (10) of positioned opposite;
Described triangle back of the body wedge (13) is inserted in the two ends of above-mentioned screw rod (14); Described triangle back of the body wedge (13)Locking member for outside (15) fastening.
2. pinner formwork structure according to claim 1, is characterized in that, described pinner templateStructure also comprises:
One or more blast pipes (16);
Described in described blast pipe (16) is arranged on, be embedded in the side of pinner formwork structure, or arrangeIn the inner space that described the first panel (10) and the second panel (11) surround;
The least significant end of described blast pipe (16) is higher than the upper surface of the upper steel plate of upper pinner bottom, the highestEnd is higher than the upper surface of pinner formwork structure.
3. pinner formwork structure according to claim 1, is characterized in that,
Described blast pipe (16) is connected with elbow, and the other end of described elbow upward;
Or,
Described blast pipe (16) is connected with elbow, and the other end of described elbow upward and be connected with and arrangeWhat tracheae (16) matched adds senior executive.
4. pinner formwork structure according to claim 3, is characterized in that, described blast pipe (16)For pvc pipe, the diameter of described blast pipe (16) is Φ 10mm~Φ 30mm.
5. according to the pinner formwork structure described in claim 1 to 4 any one, it is characterized in that,Described pinner formwork structure also comprises:
Grout pipe (17);
The least significant end of described grout pipe (17) exceeds the upper surface of pinner on bearing, and the other end exceeds instituteState the upper surface of pinner formwork structure.
6. pinner formwork structure according to claim 5, is characterized in that,
Described grout pipe (17) is connected with elbow, and the other end of described elbow upward;
Or,
Described grout pipe (17) is connected with elbow, and the other end of described elbow upward and be connected with and fill withWhat slurry pipe (17) matched adds senior executive.
7. pinner formwork structure according to claim 6, is characterized in that, described grout pipe (17)For pvc pipe, the diameter of described grout pipe (17) is Φ 30mm~Φ 70mm.
8. pinner formwork structure according to claim 1, is characterized in that, described the second panel(11) outside is also provided with described back cord (12).
9. pinner formwork structure according to claim 1, is characterized in that, described the first panel(10) and the second panel (11) adopts the phenolic aldehyde bamboo plywood coated with film that thickness is 1.0cm~2cm, according toOn scene, pinner dimensioned forms.
10. pinner formwork structure according to claim 1, is characterized in that, the described triangle back of the bodyWedge (13) processes with the lumps of wood according to on-the-spot actual angle.
CN201521105456.0U 2015-12-25 2015-12-25 Base stone template structure Expired - Fee Related CN205242276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521105456.0U CN205242276U (en) 2015-12-25 2015-12-25 Base stone template structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521105456.0U CN205242276U (en) 2015-12-25 2015-12-25 Base stone template structure

Publications (1)

Publication Number Publication Date
CN205242276U true CN205242276U (en) 2016-05-18

Family

ID=55941356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521105456.0U Expired - Fee Related CN205242276U (en) 2015-12-25 2015-12-25 Base stone template structure

Country Status (1)

Country Link
CN (1) CN205242276U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016858A (en) * 2019-05-14 2019-07-16 四川省铁路产业投资集团有限责任公司 The adjustable bridge pad pinner template system of absolute altitude
CN111231076A (en) * 2020-01-20 2020-06-05 中交一公局集团有限公司 Template device for cushion stone

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016858A (en) * 2019-05-14 2019-07-16 四川省铁路产业投资集团有限责任公司 The adjustable bridge pad pinner template system of absolute altitude
CN110016858B (en) * 2019-05-14 2023-11-17 四川省铁路产业投资集团有限责任公司 Bridge support filler stone template system with adjustable elevation
CN111231076A (en) * 2020-01-20 2020-06-05 中交一公局集团有限公司 Template device for cushion stone
CN111231076B (en) * 2020-01-20 2024-05-17 中交一公局集团有限公司 Stone mattress template device

Similar Documents

Publication Publication Date Title
CN205716049U (en) Fixed wall pipe waterproof construction
CN103982199A (en) Plug template, plug node and blocking method for template trolley for secondary lining of tunnel
CN205242276U (en) Base stone template structure
CN103603470A (en) Stone dry-hanging veneer in cylinder structure and construction method thereof
CN205840313U (en) Exterior wall joint part plank sheathing installs structure
CN103670452A (en) Installation structure and method for accurately positioning tunnel arch wall lining buried type water-stop belt
CN106194210B (en) The installation method of tunnel lining trolley, working method and pre-pouring grout pipe fixing device
CN206245663U (en) Heavy terrace expansion joint connector
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN205325962U (en) Prefabricated component buried sleeve positioner
CN203847132U (en) Plug formwork for formwork trolley and plug junction for secondary lining of tunnel
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN204725723U (en) A kind of glass fiber reinforced plastic flange mould
CN207484711U (en) A kind of antiseep construction of horizontal structure deformation joint
CN102400552B (en) Boundary beam upper-port anti-expansion mold reinforcing device
CN206503165U (en) A kind of steel structure inspection shaft
CN203050108U (en) Concrete slab pipe installation reserved hole construction mold
CN105888247A (en) Construction method for expansion joint of industrial pond
CN204326524U (en) Nonmetallic composite negative and positive Angle formwork for building
CN107576574B (en) Testing method for equal-size limit water pressure resistance of deformation joint embedded water stop
CN207420013U (en) The seamless splicing construction of plain form
CN203626164U (en) Dry-hanging stone veneer of cylindrical structure
CN107965136A (en) The seamless splicing construction and method of plain form
CN204386140U (en) A kind of recoverable suspension scaffold shaped steel anchor device
CN204983655U (en) Reserved pipe cover of floor poling hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Song

Inventor after: Xu Lin

Inventor after: Meng Zhaohui

Inventor after: Liu Xin

Inventor after: Liu Kuigang

Inventor after: Wang Laishun

Inventor after: Yuan Jun

Inventor after: Liu Miao

Inventor after: Meng Xingye

Inventor before: Wang Song

Inventor before: Xu Lin

Inventor before: Meng Zhaohui

Inventor before: Liu Xin

Inventor before: Wang Laishun

Inventor before: Yang Jianhui

Inventor before: Yuan Jun

Inventor before: Liu Miao

Inventor before: Meng Xingye

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20211225