CN202047830U - Tunnel secondary lining concrete curing trolley - Google Patents

Tunnel secondary lining concrete curing trolley Download PDF

Info

Publication number
CN202047830U
CN202047830U CN2011201666219U CN201120166621U CN202047830U CN 202047830 U CN202047830 U CN 202047830U CN 2011201666219 U CN2011201666219 U CN 2011201666219U CN 201120166621 U CN201120166621 U CN 201120166621U CN 202047830 U CN202047830 U CN 202047830U
Authority
CN
China
Prior art keywords
secondary lining
tunnel
door frame
concrete curing
lining concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201666219U
Other languages
Chinese (zh)
Inventor
舒文军
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2011201666219U priority Critical patent/CN202047830U/en
Application granted granted Critical
Publication of CN202047830U publication Critical patent/CN202047830U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to tunnel construction equipment, in particular to a tunnel secondary lining concrete curing trolley which solves the problems of influence on the integrity and durability due to the insufficiency of hydration of the existing tunnel secondary lining concrete curing. The tunnel secondary lining concrete curing trolley comprises a door frame, wherein the bottom of the door frame is provided with a road wheel, an arc-shaped steel tube is arranged outside the upper part of the door frame, water drainage holes are uniformly arranged outside the steel tube, and one end part of one side of the steel tube is connected with a water pipe connector. The tunnel secondary lining concrete curing trolley can solve the problems of insufficient strength of concrete, crack, and the like due to insufficient curing of secondary lining, is beneficial to the improvement of the integrity and durability of secondary lining and ensures the construction quality of secondary lining tunnel concrete.

Description

Tunnel double-lining concrete curing chassis
Technical field
The utility model relates to constructing tunnel equipment, is specially a kind of tunnel double-lining concrete curing chassis.
Background technology
After the tunnel double-lining construction is finished, there is concrete strength deficiency in various degree, or even the concrete cracking phenomenon.Generally speaking, lining concrete strength deficiency and cracking are very complicated system problems, and influence factor is a lot, but temperature and humidity has the greatest impact to concrete strength deficiency and cracking.
In present most of constructing tunnel, temperature is higher in the hole, dryness of air.The temperature height, hydrated cementitious speeds up, and concrete strength developing is also fast, and water is the necessary condition of hydrated reaction of cement, has only ambient humidity suitable, hydrated reaction of cement could carry out smoothly, and concrete strength is attained full development.If humidity is not enough, hydrated reaction of cement can not normally carry out, even stops aquation, can seriously reduce concrete strength.Hydrated cementitious is insufficient, and hydration is not finished, and also can make concrete structure loose, forms cup shake, increases seepage of water, thereby influences concrete globality and durability.
Summary of the invention
There is the insufficient problem that influences globality and durability of aquation in the utility model in order to solve existing tunnel two lining concrete curings, and a kind of tunnel double-lining concrete curing chassis is provided.
The utility model is to adopt following technical scheme to realize: tunnel double-lining concrete curing chassis, comprise door frame, the door frame bottom is provided with road wheel, and the door frame upper outside is provided with the steel pipe of arcuation, the uniform spilled water hole that has in the outside of steel pipe, steel pipe one side end is connected to water pipe head.When carrying out the secondary maintenance, connect water pipe head on high-pressure water pipe and the steel pipe with flexible pipe, open gate valve, with the artificial trolley running that promotes, water sprays from spilled water hole, can serve as a contrast the surfaces maintenance of sprinkling water to two.
The utility model can solve concrete strength deficiency and the problems of crack because of two lining maintenances appearance not in place preferably, helps improving two lining globality and durability, guarantees the tunnel double-lining concrete construction quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure: 1-door frame, 2-road wheel, 3-steel pipe, 4-water pipe head, 5-reinforcing bar.
The specific embodiment
Tunnel double-lining concrete curing chassis comprises door frame 1, and door frame 1 bottom is provided with road wheel 2, and door frame 1 upper outside is provided with the steel pipe 3 of arcuation, the uniform spilled water hole that has in the outside of steel pipe 3, and steel pipe 3 one side ends are connected to water pipe head 4.In the specific implementation process, steel pipe 3 adopts Φ 48 coating steel pipes to make, and section configuration is reserved ventilation cloth bag position simultaneously than the little 15--20cm of two lining sections; Interval 15cm-20cm fires spilled water hole on the steel pipe 3; Door frame adopts the H14 section steel manufacture, adopts reinforcing bar 5 welding of Φ 20 fixing between steel pipe 3 and the door frame 1.

Claims (1)

1. tunnel double-lining concrete curing chassis, it is characterized in that: comprise door frame (1), door frame (1) bottom is provided with road wheel (2), door frame (1) upper outside is provided with the steel pipe (3) of arcuation, the uniform spilled water hole that has in the outside of steel pipe (3), steel pipe (3) one side ends are connected to water pipe head (4).
CN2011201666219U 2011-05-24 2011-05-24 Tunnel secondary lining concrete curing trolley Expired - Fee Related CN202047830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201666219U CN202047830U (en) 2011-05-24 2011-05-24 Tunnel secondary lining concrete curing trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201666219U CN202047830U (en) 2011-05-24 2011-05-24 Tunnel secondary lining concrete curing trolley

Publications (1)

Publication Number Publication Date
CN202047830U true CN202047830U (en) 2011-11-23

Family

ID=44988141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201666219U Expired - Fee Related CN202047830U (en) 2011-05-24 2011-05-24 Tunnel secondary lining concrete curing trolley

Country Status (1)

Country Link
CN (1) CN202047830U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102941618A (en) * 2012-12-13 2013-02-27 中国水利水电第十四工程局有限公司 Lateral top arch concrete maintenance trolley for tunnel
CN104963704A (en) * 2015-07-22 2015-10-07 舟山市智海技术开发有限公司 Tunnel concrete curing device and construction method thereof
CN104963703A (en) * 2015-07-22 2015-10-07 舟山市智海技术开发有限公司 Tunnel concrete curing device and construction method thereof
CN104989430A (en) * 2015-07-22 2015-10-21 顾达容 Tunnel lining concrete curing device and construction method thereof
CN105952478A (en) * 2016-06-22 2016-09-21 中国水利水电第十四工程局有限公司 Large-section tunnel side top arch concrete curing trolley
CN106246209A (en) * 2015-01-31 2016-12-21 夏玉军 A kind of tunnel inner lining concrete insulated curing constructing device and construction method thereof
CN107387124A (en) * 2017-08-23 2017-11-24 中国铁路经济规划研究院 Tunnel lining concrete maintenance construction technique
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN108442939A (en) * 2018-02-01 2018-08-24 中铁十二局集团有限公司 A kind of totally-enclosed mobile atomizer maintenance rack
CN111088987A (en) * 2019-12-17 2020-05-01 中铁隧道集团三处有限公司 A equipment for single track tunnel invert construction

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102941618B (en) * 2012-12-13 2015-12-23 中国水利水电第十四工程局有限公司 A kind of Lateral top arch concrete maintenance trolley for tunnel
CN102941618A (en) * 2012-12-13 2013-02-27 中国水利水电第十四工程局有限公司 Lateral top arch concrete maintenance trolley for tunnel
CN106246209B (en) * 2015-01-31 2018-03-20 中铁隧道集团二处有限公司 A kind of tunnel inner lining concrete insulated curing constructing device and its construction method
CN106246209A (en) * 2015-01-31 2016-12-21 夏玉军 A kind of tunnel inner lining concrete insulated curing constructing device and construction method thereof
CN104989430A (en) * 2015-07-22 2015-10-21 顾达容 Tunnel lining concrete curing device and construction method thereof
CN104963703A (en) * 2015-07-22 2015-10-07 舟山市智海技术开发有限公司 Tunnel concrete curing device and construction method thereof
CN104963704A (en) * 2015-07-22 2015-10-07 舟山市智海技术开发有限公司 Tunnel concrete curing device and construction method thereof
CN105952478A (en) * 2016-06-22 2016-09-21 中国水利水电第十四工程局有限公司 Large-section tunnel side top arch concrete curing trolley
CN107387124A (en) * 2017-08-23 2017-11-24 中国铁路经济规划研究院 Tunnel lining concrete maintenance construction technique
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN108442939A (en) * 2018-02-01 2018-08-24 中铁十二局集团有限公司 A kind of totally-enclosed mobile atomizer maintenance rack
CN111088987A (en) * 2019-12-17 2020-05-01 中铁隧道集团三处有限公司 A equipment for single track tunnel invert construction
CN111088987B (en) * 2019-12-17 2022-03-01 中铁隧道集团三处有限公司 A equipment for single track tunnel invert construction

Similar Documents

Publication Publication Date Title
CN202047830U (en) Tunnel secondary lining concrete curing trolley
CN205116466U (en) Waterproof construction of node is hung futilely to assembly type structure outer wall
CN103850352B (en) A kind of method of attachment of precast plate
CN201648912U (en) Prefabricated water drainage system groove
CN205742265U (en) Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof
CN204098064U (en) Employing fibre reinforced plastics are the concrete box culvert of main muscle
CN106499113B (en) One kind just beats preparation technology without finish coat assembled wall
CN103669654B (en) Wallboard external-hanging structure and aerated concrete wall panel, wallboard connecting component
CN108035241A (en) A kind of assembled steel-mixed combined bridge and its construction technology
CN202164545U (en) Vertical prestressing pore canal communicating pipes and mud-jacking pipes
CN103882992B (en) Band ring-type rebar connector
CN207553287U (en) A kind of sill bolt plate precast wall body and its connecting node with laminated floor slab
CN204001212U (en) Band ring-type rebar connector
CN111088817A (en) Prefabricated assembled cable well and construction method thereof
CN203716343U (en) Plastic sheet internal mold cement mortar wall body
CN203346950U (en) Hidden laying structure for temporary water supply pipes of high-rise building
CN206646722U (en) A kind of reinforced concrete composite structure overlaps beam slab
CN2791160Y (en) Building-board building form-net without dismounting
CN204282528U (en) A kind of prefabricated balcony structure
CN210049652U (en) Corrugated pane outer wall structure of cast-in-place prestressed bare concrete elevated station and elevated station
CN204459502U (en) Prestress steel cylinder concrete electric power piping lane
CN106545106A (en) A kind of heat insulation integrated body of wall with waterproof construction and its processing technology
CN103465357B (en) A kind of precast hollow concrete structure inner chamber core tire
CN112359869A (en) Combined structure pipe gallery of UHPC and steel
CN201991095U (en) Heat-preserving energy-saving plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20190524

CF01 Termination of patent right due to non-payment of annual fee