CN107387124A - Tunnel lining concrete maintenance construction technique - Google Patents

Tunnel lining concrete maintenance construction technique Download PDF

Info

Publication number
CN107387124A
CN107387124A CN201710731335.4A CN201710731335A CN107387124A CN 107387124 A CN107387124 A CN 107387124A CN 201710731335 A CN201710731335 A CN 201710731335A CN 107387124 A CN107387124 A CN 107387124A
Authority
CN
China
Prior art keywords
maintenance
temperature
tunnel
region
humidity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710731335.4A
Other languages
Chinese (zh)
Inventor
赵勇
倪光斌
章远方
林传年
孙世豪
吕刚
霍建勋
万鹏
蒋思
王浩
姚坤锋
耿冬梅
纪博林
严振林
杨建福
孙振宇
刘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FSDIG Construction Machinery Co ltd
Railway Engineering Research Institute of CARS
China Railway Fifth Survey and Design Institute Group Co Ltd
China Railway Economic and Planning Research Institute
Original Assignee
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
China Railway Economic and Planning Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Railway No5 Institute Engineering Machinery Co Ltd, China Railway Fifth Survey and Design Institute Group Co Ltd, China Railway Economic and Planning Research Institute filed Critical Beijing Railway No5 Institute Engineering Machinery Co Ltd
Priority to CN201710731335.4A priority Critical patent/CN107387124A/en
Publication of CN107387124A publication Critical patent/CN107387124A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to tunnel-liner conservation technology field, there is provided a kind of tunnel lining concrete maintenance construction technique.Tunnel-liner is divided axially into multiple by maintenance section by this technique, each it is divided into again by maintenance section multiple by maintenance region, maintenance operations are carried out by maintenance section to each one by one, maintenance operations include monitoring each by the temperature and humidity in maintenance region, spraying treatment and heat radiation processing are carried out by maintenance region respectively to each simultaneously, so as to each meet design temperature change curve and setting moisture curve by the temperature and humidity in maintenance region.This maintaining process can not only realize the intelligent control of temperature and humidity, and heating and two breeding handguard sections of humidification are separate, it is independent of each other each other between temperature maintenance condition and humidity curing condition, therefore can be according to the different demands of different zones, temperature and humidity, which is precisely controlled, to be realized to each region, can finally significantly improve tunnel-liner quality, concrete strength and surface soundness.

Description

Tunnel lining concrete maintenance construction technique
Technical field
The present invention relates to tunnel-liner conservation technology field, and in particular to a kind of tunnel lining concrete maintenance construction work Skill.
Background technology
At present, at home in constructing tunnel, lining cutting typically uses natural curing, and pole end item is supported using simple water spray Shield processing.Because above-mentioned maintenance process is had a great influence by external environment and human factor, maintenance effect is bad, it is difficult to ensures lining The quality and service life of block.
The content of the invention
(1) technical problems to be solved
It is an object of the invention to provide a kind of maintaining process that can significantly improve tunnel-liner quality.
(2) technical scheme
To achieve the above object, the invention provides a kind of tunnel lining concrete maintenance construction technique, by tunnel-liner It is divided axially into multiple by maintenance section, is each divided into again by maintenance section multiple by maintenance region, is carried out one by one to each by maintenance section Secondary lining, maintenance and heat and moisture preserving operation, wherein, passed during secondary lining is carried out to the pre-buried temperature of concrete core Sensor;Conserve and the process of heat and moisture preserving operation is:Monitoring is each conserved the humidity and concrete core temperature in region, simultaneously Spraying treatment and heat radiation processing are carried out by maintenance region to each by maintenance trolley respectively, the latter is shifted in maintenance trolley During by maintenance section, by be incubated chassis to it is previous by maintenance section be incubated and moisturizing handle so that each by maintenance region Temperature and humidity meet design temperature change curve and setting moisture curve.
Preferably, region axially pre-buried multiple temperature sensors are each conserved.
Preferably, it is multiple to be uniformly distributed by maintenance region along the circumference of tunnel-liner.
Preferably, heat radiation processing is carried out by maintenance region to each by multiple electric boiling plates.
Preferably, the electric boiling plate electrical heating temperature is adjustable.
Preferably, atomization process atomizer with high-pressure fluid conveyance conduit is realized.
Preferably, each sprayed by maintenance region by multiple atomizers.
Preferably, the atomizer is 5~10 micron order atomizers.
Preferably, in spraying treatment and heat radiation before processing, first by it is multiple by maintenance regional seal be a relative closure Space.
(3) beneficial effect
A kind of tunnel lining concrete maintenance construction technique provided by the invention, it is multiple by the way that tunnel-liner is divided axially into By maintenance section, each it is divided into again by maintenance section multiple by maintenance region, secondary lining, maintenance is carried out by maintenance section to each one by one Operated with heat and moisture preserving, wherein, to the pre-buried temperature sensor of concrete core during secondary lining is carried out;Maintenance and guarantor The process of warm moisturizing operation is:Monitoring is each by the humidity and concrete core temperature in maintenance region, while pass through maintenance trolley Spraying treatment and heat radiation processing are carried out by maintenance region respectively to each, when maintenance trolley shifts to the latter by maintenance section, By be incubated chassis to it is previous by maintenance section be incubated and moisturizing handle so that each by maintenance region temperature and humidity Meet design temperature change curve and setting moisture curve, can not only realize the intelligent control of temperature and humidity, and It is separate due to heating and humidifying two breeding handguard sections, mutually not shadow between temperature maintenance condition and humidity curing condition Ring, therefore temperature and humidity, which is precisely controlled, can be realized to each region, can finally be shown according to the different demands of different zones Write and improve tunnel-liner quality, particularly lining concrete intensity, surface soundness;In addition, maintenance trolley and insulation chassis are tight Being set with lining trolley, the pouring molding and maintenance for making secondary lining are accomplished without any letup, and are incubated chassis while being incubated, Maintenance trolley can also be simultaneously to next operation heated and be incubated by maintenance section, so that greatly accelerating maintenance The efficiency of construction.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of tunnel-liner curing system of the embodiment of the present invention;
Fig. 2 is schematic diagram of the lining concrete core temperature curve with curing temperature curve of the embodiment of the present invention;
Fig. 3 is a kind of schematic diagram of tunnel-liner maintenance trolley of the embodiment of the present invention.
In figure:
1st, it is bowed out;2nd, electric boiling plate;3rd, sprayer unit;4th, sealing device;5th, industrial control cabinet;7th, support frame;8th, skeleton;A, serve as a contrast Platform building cart;B, maintenance trolley;C, it is incubated chassis.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
With reference to shown in Fig. 1 and Fig. 2, a kind of tunnel lining concrete maintenance construction technique provided in an embodiment of the present invention is main If the concrete strength of tunnel-liner and surface soundness are improved by the control of temperature and humidity.This technique is:By tunnel Road lining cutting is divided axially into multiple by maintenance section, is each divided into again by maintenance section multiple by maintenance region, is conserved one by one to each Duan Jinhang secondary linings, maintenance and the maintenance of heat and moisture preserving operation three phases, wherein, secondary by lining trolley a progress To the pre-buried temperature sensor of concrete core during lining cutting, preferably temperature is respectively provided with the vault and haunch opening position of lining cutting Sensor, and region axially pre-buried multiple temperature sensors are each conserved, preferably poured in lining cutting and 3 are chosen in length range Ring, the front and rear pre-buried position of two rings from end mould with a distance from be no less than 1m;Conserve and the process of heat and moisture preserving operation is:Monitoring is each supported The humidity and concrete core temperature in region are protected, while is carried out respectively at spraying by maintenance region to each by maintenance trolley b Reason and heat radiation processing, when maintenance trolley b shifts to the latter by maintenance section, by being incubated chassis c to previous by maintenance section Insulation and moisturizing processing are carried out, so as to each meet design temperature change curve by the temperature and humidity in maintenance region and set wet Spend change curve.
Lining concrete should be poured completion and preferably be selected as starting point, record deadline by lining concrete core temperature record Take lining concrete pour after the completion of 96 hours, lining concrete core temperature change statistical form in, lining concrete should be indicated The parameters such as core position, lining cutting mileage, lining section, lining thickness, concrete grade, become with specific reference to concrete core temperature Law and lining construction rhythm, formulate lining concrete curing temperature curve.
Realized specifically, this technique relies on a kind of tunnel-liner curing system, the system includes what is be arranged before and after Lining trolley, maintenance trolley and insulation chassis, with reference to shown in figure 3, the maintenance trolley includes bowed out 1 and controller, bowed out 1 shape The shapes and sizes of shape and size substantially with tunnel-liner inwall are adapted, i.e., bowed out 1 shape is substantially domed, and size is omited Less than tunnel-liner;Bowed out 1 outside is provided with multiple heaters and multiple sprayer units 3, and heater is used to pass through hot spoke The form penetrated forms heating to the inwall of tunnel-liner, and sprayer unit 3 is used to spray to the inwall of tunnel-liner, each heating dress The heating region put is correspondingly provided with a temperature-detecting device for being used to detect tunnel-liner temperature and (is embedded in the temperature of lining cutting core Spend sensor), the spray area of each sprayer unit 3 is correspondingly provided with a Humidity Detection for being used to detect tunnel-liner humidity and filled Put, each heater and humidification device are each responsible for heating and humidify a regional area of lining cutting;Temperature-detecting device It is connected with humidity detector with controller, for giving the temperature and humidity information transfer of the regional detected to control Device, according to the concrete condition of tunnel-liner different zones, controller controls the heating-up temperature of each heater and each spray again The spray amount of mist device 3, so as to entirely reach default temperature and humidity by the tunnel-liner in maintenance region and continue to set Duration.
From the foregoing, it will be observed that heating that this maintaining process is arranged by compartmentalization and humidification, according to concrete core temperature change Rule and lining construction rhythm, lining concrete curing temperature curve is formulated, meets lining cutting curing concrete internal-external temperature difference requirement, Coordinate corresponding with each region temperature-detecting device and humidity detector, can not only realize the intelligence control of temperature and humidity System, and it is separate due to heating and humidifying two breeding handguard sections, between temperature maintenance condition and humidity curing condition each other It is independent of each other, therefore temperature and humidity, which is precisely controlled, can be realized to each region, finally according to the different demands of different zones Tunnel-liner quality, particularly lining concrete intensity, surface soundness can be significantly improved;In addition, maintenance trolley and insulation Chassis follows lining trolley setting closely, and the pouring molding and maintenance for making secondary lining are accomplished without any letup, and is incubated chassis and is being incubated While, maintenance trolley can also be simultaneously to next operation heated and be incubated by maintenance section, so that greatly adding The fast efficiency of maintenance construction.
It is multiple to be uniformly distributed by maintenance region along the circumference of tunnel-liner, it is circumferentially distributed it is multiple by maintenance region by centre It is stepped distribution to both sides, because the lining cutting region at different height has different temperature and humidity curing requirements, so Be advantageous to realize for the tunnel-liner in different height region and accurately conserve, special temperature is formulated for each maintenance region Controlling curve and humid control curve, to reach optimal maintenance effect.
Wherein, multiple atomising devices are preferably and are uniformly distributed in bowed out 1 outside, so the direct face of each atomising device institute To the area of nebulization region be all identical, whole tunnel-liner is all uniformly humidified.
In certain embodiments, heater is electric boiling plate 2, by multiple electric boiling plates 2 to each by maintenance region Heat radiation processing is carried out, electric boiling plate electrical heating temperature is adjustable, and bowed out 1 lateral surface is spliced by multiple electric boiling plates 2, i.e., , each other can be with per mutually at a certain angle between two adjacent heating plates in the circumferential direction of tunnel-liner Sealing welding connects, and spliced entirety is substantially domed, is adapted with the shape with tunnel-liner.In electric boiling plate 2 The settable skeleton 8 being welded by steel I-beam in side, to install and support each electric boiling plate 2.
Specifically, sprayer unit 3 includes atomizer and the high-pressure fluid conveyance conduit that is connected with atomizer, at atomization Reason high-pressure fluid conveyance conduit coordinates atomizer to realize that atomizer and high-pressure fluid conveyance conduit are arranged at electrical heating The outside of plate 2;Atomizer is preferably 5~10 micron order atomizers, coordinates high-pressure fluid, forms minimum atomizing particle, So as to avoid the generation of condensation, the uniformity of humidification is improved.
In addition, this maintenance trolley also includes support frame 7, support frame 7 can be welded by square steel and/or I-steel, be led to Cross welding or bolted mode is connected with the skeleton 8 of bowed out inner side, so as to support the inner side for being arranged on bowed out 1, support frame 7 Bottom be provided with road wheel, road wheel walking is in orbit, and road wheel is furnished with motor, and motor is connected with the traction drive, from And drive this maintenance trolley to be advanced in tunnel, realize the maintenance to whole section of tunnel-liner.
Support frame 7 preferably has platform, and controller is arranged on platform, and controller can be integrated in industrial control cabinet 5, industrial control cabinet The control button such as settable startup, pause and stopping outside 5, for quickly controlling the operation of complete machine;It can be set in industrial control cabinet 5 specific Control panel, for controlling and setting operational factor and start-stop time for each heater and humidification device, finally Form efficient intelligent control.
In certain embodiments, bowed out 1 edge is provided with sealing device 4, i.e., at bowed out 1 axial both ends and base The sealing device 4 is set, and sealing device 4, in spraying treatment and heat radiation before processing, first will in sealing contact with tunnel-liner Multiple spaces by maintenance regional seal for a relative closure, provided safeguard for maintenance trolley control of temperature and humidity.
Further, sealing device 4 can be air bag, after inflation, it is possible to achieve good between tunnel-liner Good sealing, and finish in one section of tunnel-liner maintenance, need to be moved to next section when being conserved, air bag need to only be carried out Deflation, it is easy to operate, efficient.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, only tunnel ventilation dual-active The embodiment of plug system, rather than its limitations, and for single-piston Tunnel Ventilation System, integrated closed system, tunnel Exhaust fan is set, equally can be according to the similar setting of size of equipment;Although the present invention is carried out with reference to the foregoing embodiments Detailed description, it will be understood by those within the art that:It still can be to the technology described in foregoing embodiments Scheme is modified, or carries out equivalent substitution to which part technical characteristic;And these modifications or replacement, do not make corresponding The essence of technical scheme departs from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (9)

1. a kind of tunnel lining concrete maintenance construction technique, it is characterised in that tunnel-liner is divided axially into multiple conserved Section, be each divided into again by maintenance section it is multiple by maintenance region, one by one to each by maintenance section progress secondary lining, maintenance and insulation Moisturizing operates, wherein, to the pre-buried temperature sensor of concrete core during secondary lining is carried out;Maintenance and heat and moisture preserving The process of operation is:Monitoring is each by the humidity and concrete core temperature in maintenance region, while by maintenance trolley to each Spraying treatment and heat radiation processing are carried out by maintenance region respectively, when maintenance trolley shifts to the latter by maintenance section, pass through guarantor Warm chassis is incubated and moisturizing is handled to previous by maintenance section, so as to each be met and set by the temperature and humidity in maintenance region Determine temperature variation curve and setting moisture curve.
2. tunnel lining concrete maintenance construction technique according to claim 1, it is characterised in that each by maintenance region Axially pre-buried multiple temperature sensors.
3. tunnel lining concrete maintenance construction technique according to claim 1, it is characterised in that multiple by maintenance region It is uniformly distributed along the circumference of tunnel-liner.
4. tunnel lining concrete maintenance construction technique according to claim 1, it is characterised in that pass through multiple electrical heating Plate carries out heat radiation processing to each by maintenance region.
5. tunnel lining concrete maintenance construction technique according to claim 4, it is characterised in that the electric boiling plate electricity Heating-up temperature is adjustable.
6. tunnel lining concrete maintenance construction technique according to claim 1, it is characterised in that the atomization process by High-pressure fluid conveyance conduit coordinates atomizer to realize.
7. tunnel lining concrete maintenance construction technique according to claim 6, it is characterised in that each by maintenance region Sprayed by multiple atomizers.
8. tunnel lining concrete maintenance construction technique according to claim 6, it is characterised in that the atomizer is 5~10 micron order atomizers.
9. tunnel lining concrete maintenance construction technique according to claim 1, it is characterised in that in spraying treatment and heat Before radiation treatment, first by multiple spaces by maintenance regional seal for a relative closure.
CN201710731335.4A 2017-08-23 2017-08-23 Tunnel lining concrete maintenance construction technique Pending CN107387124A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710731335.4A CN107387124A (en) 2017-08-23 2017-08-23 Tunnel lining concrete maintenance construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710731335.4A CN107387124A (en) 2017-08-23 2017-08-23 Tunnel lining concrete maintenance construction technique

Publications (1)

Publication Number Publication Date
CN107387124A true CN107387124A (en) 2017-11-24

Family

ID=60346607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710731335.4A Pending CN107387124A (en) 2017-08-23 2017-08-23 Tunnel lining concrete maintenance construction technique

Country Status (1)

Country Link
CN (1) CN107387124A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108068206A (en) * 2017-12-19 2018-05-25 中铁局集团天津建设工程有限公司 The spray pipe network support device of concrete curing and its automation curing system
CN108678800A (en) * 2018-07-12 2018-10-19 中交第二公路工程局有限公司 A kind of tunnel health dust-extraction unit and dust removal method
CN109505627A (en) * 2018-12-04 2019-03-22 三峡大学 A kind of multifunctional intellectual tunnel lining concrete automatic maintenance trolley and method
CN109682503A (en) * 2019-01-11 2019-04-26 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete pressure monitoring system and its application method
CN110656957A (en) * 2019-09-26 2020-01-07 苏锦生 Tunnel inner face lining concrete atomization maintenance vehicle for tunnel construction
CN111365023A (en) * 2020-03-30 2020-07-03 安徽华骅桥梁设备制造有限公司 Automatic maintenance equipment of high-efficient constant temperature and humidity tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202047830U (en) * 2011-05-24 2011-11-23 中铁十二局集团第三工程有限公司 Tunnel secondary lining concrete curing trolley
CN104712345A (en) * 2015-01-31 2015-06-17 夏玉军 Tunnel lining concrete heat preserving and maintaining construction device
CN104963698A (en) * 2015-06-25 2015-10-07 山东大学 Heat-preservation moisture-preservation life-preserving device for tunnel lining concrete and construction method thereof
CN104975862A (en) * 2015-07-03 2015-10-14 中铁十四局集团有限公司 Full-automatic tunnel concrete lining maintenance device and use method thereof
CN204754944U (en) * 2015-07-03 2015-11-11 中铁十四局集团有限公司 Tunnel concrete lining independently maintain equipment entirely

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202047830U (en) * 2011-05-24 2011-11-23 中铁十二局集团第三工程有限公司 Tunnel secondary lining concrete curing trolley
CN104712345A (en) * 2015-01-31 2015-06-17 夏玉军 Tunnel lining concrete heat preserving and maintaining construction device
CN104963698A (en) * 2015-06-25 2015-10-07 山东大学 Heat-preservation moisture-preservation life-preserving device for tunnel lining concrete and construction method thereof
CN104975862A (en) * 2015-07-03 2015-10-14 中铁十四局集团有限公司 Full-automatic tunnel concrete lining maintenance device and use method thereof
CN204754944U (en) * 2015-07-03 2015-11-11 中铁十四局集团有限公司 Tunnel concrete lining independently maintain equipment entirely

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108068206A (en) * 2017-12-19 2018-05-25 中铁局集团天津建设工程有限公司 The spray pipe network support device of concrete curing and its automation curing system
CN108678800A (en) * 2018-07-12 2018-10-19 中交第二公路工程局有限公司 A kind of tunnel health dust-extraction unit and dust removal method
CN109505627A (en) * 2018-12-04 2019-03-22 三峡大学 A kind of multifunctional intellectual tunnel lining concrete automatic maintenance trolley and method
CN109682503A (en) * 2019-01-11 2019-04-26 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete pressure monitoring system and its application method
CN110656957A (en) * 2019-09-26 2020-01-07 苏锦生 Tunnel inner face lining concrete atomization maintenance vehicle for tunnel construction
CN111365023A (en) * 2020-03-30 2020-07-03 安徽华骅桥梁设备制造有限公司 Automatic maintenance equipment of high-efficient constant temperature and humidity tunnel

Similar Documents

Publication Publication Date Title
CN107387124A (en) Tunnel lining concrete maintenance construction technique
CN107435546A (en) Tunnel-liner intelligence maintenance trolley
CN104070598B (en) The curing kilns of a kind of air energy
CN107602150A (en) Tunnel concrete maintenance trolley
CN207568621U (en) Tunnel-liner intelligence maintenance trolley
CN104827553B (en) A kind of energy-conserving and environment-protective heating in medium frequency automatic temperature control concrete curing system
CN102094349A (en) Novel baking oven
CN206349184U (en) A kind of heat sink cooled for copper cabling
CN203980928U (en) A kind of hot water cyclesystem of concrete segment curing kilns
CN110027099A (en) Concrete intelligence health promotion system
CN104369265B (en) Concrete standard fog room environment adjustment system and control method
CN108396135A (en) Steam humidifying hot air blending device and method
CN206883881U (en) High ferro prefabricated case beam automatic intelligent shower water curing system
CN102221492B (en) Portable maintenance device
CN107475816A (en) A kind of multiple field carbon fiber pre-oxidation furnace
CN205164999U (en) Indoor water spray curing means
CN103953166B (en) A kind of flat roof deck induces snow blowing apparatus step by step
CN207437085U (en) Tunnel concrete maintenance trolley
CN104075545B (en) A kind of electrothermal tube drying equipment
CN105195344A (en) Indoor water spraying maintaining device
CN106925483A (en) It is a kind of can thermostatic control paint temperature environment-friendly type tubing spray-painting plant
CN206064783U (en) A kind of fresh air dehumidifying system
CN205523023U (en) Stoving of label printing machine is beaten and is rolled up composite set
CN206066674U (en) A kind of cement, concrete sample maintenance equipment
CN104197674B (en) A kind of catalyst dry kiln

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100038 East auxiliary building, 10 Fuxing Road, Beijing, Haidian District

Applicant after: CHINA RAILWAY ECONOMIC AND PLANNING RESEARCH INSTITUTE Co.,Ltd.

Applicant after: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Applicant after: F.S.D.I.G CONSTRUCTION MACHINERY Co.,Ltd.

Address before: 100038 East auxiliary building, 10 Fuxing Road, Beijing, Haidian District

Applicant before: CHINA RAILWAY ECONOMIC AND PLANNING Research Institute

Applicant before: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Applicant before: F.S.D.I.G CONSTRUCTION MACHINERY Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20191011

Address after: Room 501, 503-506, 510, 517-523, 601-605, Dongfu Building, 10 Fuxing Road, Haidian District, Beijing, 100036

Applicant after: CHINA RAILWAY ECONOMIC AND PLANNING RESEARCH INSTITUTE Co.,Ltd.

Applicant after: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Applicant after: F.S.D.I.G CONSTRUCTION MACHINERY Co.,Ltd.

Applicant after: CARS RAILWAY ENGINEERING Research Institute

Address before: 100038 East auxiliary building, 10 Fuxing Road, Beijing, Haidian District

Applicant before: CHINA RAILWAY ECONOMIC AND PLANNING RESEARCH INSTITUTE Co.,Ltd.

Applicant before: CHINA RAILWAY FIFTH SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Applicant before: F.S.D.I.G CONSTRUCTION MACHINERY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication