CN204459502U - Prestress steel cylinder concrete electric power piping lane - Google Patents
Prestress steel cylinder concrete electric power piping lane Download PDFInfo
- Publication number
- CN204459502U CN204459502U CN201520072246.XU CN201520072246U CN204459502U CN 204459502 U CN204459502 U CN 204459502U CN 201520072246 U CN201520072246 U CN 201520072246U CN 204459502 U CN204459502 U CN 204459502U
- Authority
- CN
- China
- Prior art keywords
- steel cylinder
- electric power
- base
- piping lane
- hoop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 61
- 239000010959 steel Substances 0.000 title claims abstract description 61
- 239000004567 concrete Substances 0.000 title claims abstract description 46
- 238000010276 construction Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 31
- 229910052742 iron Inorganic materials 0.000 claims description 14
- 239000011513 prestressed concrete Substances 0.000 claims description 8
- 239000002184 metal Substances 0.000 claims description 5
- 229910052751 metal Inorganic materials 0.000 claims description 5
- 238000009413 insulation Methods 0.000 claims description 2
- 238000005286 illumination Methods 0.000 claims 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 11
- 239000011241 protective layer Substances 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 239000011372 high-strength concrete Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000010865 sewage Substances 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
预应力钢筒混凝土电力管廊,在预应力钢筒混凝土管(1)内壁,垂直于轴线安装环向底座(2),在环向底座(2)上水平安装电缆支架(3),同时,在预应力钢筒混凝土管(1)内壁上安装照明灯具(6),在预应力钢筒混凝土管(1)内下部安装绝缘走道(8)。通过采用工厂预制的预应力钢筒混凝土管做为电力管廊的基础结构,通过在其内部安装可拆卸的环向支架组合装置、照明装置及绝缘踏板,建造周期大大缩短、成本下降、工程效率显著提升,具有适用范围广,经济寿命长、抗震性能好、安装方便、运行用度低,基本不渗水等优点。
In the prestressed steel tube concrete power pipe gallery, a hoop base (2) is installed perpendicular to the axis on the inner wall of the prestressed steel tube concrete tube (1), and a cable support (3) is installed horizontally on the hoop base (2). At the same time, A lighting fixture (6) is installed on the inner wall of the prestressed steel cylinder concrete pipe (1), and an insulating walkway (8) is installed at the inner lower part of the prestressed steel cylinder concrete pipe (1). By using factory prefabricated prestressed steel cylinder concrete pipes as the basic structure of the power pipe gallery, and installing detachable ring bracket assembly devices, lighting devices and insulating pedals inside, the construction period is greatly shortened, the cost is reduced, and the engineering efficiency is improved. Significantly improved, it has the advantages of wide application range, long economic life, good seismic performance, convenient installation, low operating cost, and basically no water seepage.
Description
技术领域technical field
本实用新型涉及地下电力管线安装电力管廊设施结构改进技术,属于建设或电力输送领域,是一种可工厂化规模生产的将预应力钢筒混凝土管道与刚性支架、走道、照明等设施相结合的新型结构的电力管廊,尤其是预应力钢筒混凝土电力管廊。The utility model relates to the structure improvement technology of underground power pipeline installation power pipe corridor facilities, belongs to the field of construction or power transmission, and is a kind of factory-scale production that combines prestressed steel cylinder concrete pipelines with rigid supports, walkways, lighting and other facilities. The new structure of the power pipe gallery, especially the prestressed steel tube concrete power pipe gallery.
背景技术Background technique
预应力钢筒混凝土管(Prestressed Concrete Cylinder Pipe,简写PCCP)是指在带有钢筒的高强混凝土管芯上缠绕环向预应力钢丝,再在其上喷制致密的水泥砂浆保护层而制成的输水管。PCCP采用钢制承插口,同钢筒焊在一起,承插口有凹槽和胶圈形成了滑动式胶圈的柔性接头。PCCP是由薄钢板、高强钢丝和混凝土构成的复合管材,它充分而又综合地发挥了钢材的抗拉、易密封和混凝土的抗压、耐腐蚀性能,具有高密封性、高强度和高抗渗的特性,承受内外压较高、接头密封性好、抗震能力强、施工方便快捷、防腐性能好、维护方便等特性,被工程界所关注,广泛应用于长间隔输水干线、压力倒虹吸、城市供水工程、产业有压输水管线、电厂循环水工程下水管道、压力排污干管等。适用于跨区域水源地之间的大型输水工程,自来水、工业和农业灌溉系统的供配水管网,电厂循环水管道,各种市政压力排污主管道和倒虹吸管等,在全球范围内广泛使用。Prestressed Concrete Cylinder Pipe (PCCP for short) is made by winding a hoop prestressed steel wire on a high-strength concrete tube core with a steel cylinder, and then spraying a dense cement mortar protective layer on it. of water pipes. PCCP adopts steel socket, which is welded together with the steel cylinder. The socket has grooves and aprons to form a flexible joint of sliding aprons. PCCP is a composite pipe composed of thin steel plate, high-strength steel wire and concrete. It fully and comprehensively exerts the tensile strength and easy sealing of steel and the compression and corrosion resistance of concrete. It has high sealing performance, high strength and high resistance. The characteristics of seepage, high internal and external pressure, good sealing performance of joints, strong earthquake resistance, convenient and quick construction, good anti-corrosion performance, and convenient maintenance have attracted the attention of the engineering community and are widely used in long-distance water transmission lines and pressure inverted siphons. , urban water supply projects, industrial pressurized water pipelines, sewer pipes for power plant circulating water projects, pressure sewage main pipes, etc. It is suitable for large-scale water transmission projects between cross-regional water sources, water supply and distribution pipe networks for tap water, industrial and agricultural irrigation systems, circulating water pipes for power plants, various municipal pressure sewage main pipes and inverted siphons, etc., and is widely used around the world .
目前,国内地下电力管廊多数采用箱涵及钢筋混凝土管结构的管廊型式。箱涵是采用现浇混凝土成型,质量不易控制,工期长,抗震性能低,长期运行后,抗渗防水性能大幅降低,维护困难,费用大。而钢筋混凝土管虽采用预制型式,克服了现场施工质量不易控制的缺点,但由于受其管体的构造影响,防水抗渗性不佳。At present, most domestic underground power pipe galleries adopt the pipe gallery type of box culvert and reinforced concrete pipe structure. The box culvert is made of cast-in-place concrete, the quality is not easy to control, the construction period is long, and the seismic performance is low. After long-term operation, the impermeability and waterproof performance will be greatly reduced, making maintenance difficult and expensive. Although the reinforced concrete pipe adopts the prefabricated type, which overcomes the disadvantage that the construction quality is not easy to control on site, but due to the influence of the structure of the pipe body, the waterproof and impervious properties are not good.
实用新型内容Utility model content
本实用新型的目的是提供预应力钢筒混凝土电力管廊,既便于制造、安装和维护,又兼有抗震性和防水抗渗性能好的优点,达到电力管廊的设计、使用要求。The purpose of the utility model is to provide a prestressed steel tube concrete power pipe gallery, which is not only convenient for manufacture, installation and maintenance, but also has the advantages of good shock resistance, waterproof and anti-seepage performance, and meets the design and use requirements of the power pipe gallery.
本实用新型的目的将通过以下技术措施来实现:包括预应力钢筒混凝土管、环向底座、电缆支架、照明灯具、接地扁铁和绝缘走道;在预应力钢筒混凝土管内壁,垂直于轴线安装环向底座,在环向底座上水平安装电缆支架,同时,在环形支架底座上安装照明灯具,在预应力钢筒混凝土管内下部安装绝缘走道。The purpose of this utility model will be achieved through the following technical measures: including prestressed steel cylinder concrete pipe, ring base, cable bracket, lighting fixture, ground flat iron and insulating walkway; Install the ring base, and install the cable support horizontally on the ring base. At the same time, install the lighting fixture on the ring support base, and install the insulating walkway in the lower part of the prestressed steel cylinder concrete pipe.
尤其是,在预应力钢筒混凝土管内壁,垂直于轴线平行安装至少二个环向底座,在相邻的环向底座上相同高度分别水平安装至少二个电缆支架。In particular, on the inner wall of the prestressed steel cylinder concrete pipe, at least two hoop bases are installed perpendicular to the axis in parallel, and at least two cable supports are installed horizontally at the same height on adjacent hoop bases.
尤其是,电缆支架分别安装在环向底座的左右二侧。In particular, the cable brackets are respectively installed on the left and right sides of the hoop base.
尤其是,环向底座为可拆卸刚性结构,电缆支架的一侧固定安装在环向底座上。In particular, the hoop base is a detachable rigid structure, and one side of the cable support is fixedly installed on the hoop base.
尤其是,环向底座底部一段断开并连接顶紧装置,而且,该顶紧装置至少一端通过绝缘胶板连接环向底座的断开端面。该顶紧装置呈弹性上弓结构或中部向上凸起的铰接结构。In particular, a section of the hoop to the bottom of the base is disconnected and connected to the clamping device, and at least one end of the clamping device is connected to the disconnected end surface of the hoop to the base through an insulating rubber plate. The tightening device is in the form of an elastic upper bow structure or a hinged structure in which the middle part protrudes upwards.
尤其是,照明灯具安装在环向底座的上部或左、右二侧。In particular, the lighting fixtures are installed on the upper part or on the left and right sides of the circumferential base.
尤其是,环向底座上安装接地扁铁,接地扁铁内端与预应力钢筒混凝土管内的接地金属结构连接,接地扁铁直接焊接在环向底座下方。In particular, the grounding flat iron is installed on the hoop base, the inner end of the grounding flat iron is connected with the grounding metal structure in the prestressed steel cylinder concrete pipe, and the grounding flat iron is directly welded under the hoop base.
尤其是,在预应力钢筒混凝土管内下部水平安装绝缘走道,绝缘走道为平板结构,并从内侧穿过并跨接相邻的环向底座。In particular, an insulating walkway is installed horizontally in the lower part of the prestressed steel tube concrete tube, the insulating walkway is a flat plate structure, and passes through from the inner side and bridges the adjacent ring base.
本实用新型的优点和效果:通过采用工厂预制的预应力钢筒混凝土管做为电力管廊的基础结构,通过在其内部安装可拆卸的环向支架组合装置、照明装置及绝缘踏板,建造周期大大缩短、成本下降、工程效率显著提升,具有适用范围广,经济寿命长、抗震性能好、安装方便、运行用度低,基本不渗水水等优点。The advantages and effects of the utility model: by adopting the factory-prefabricated prestressed steel cylinder concrete pipe as the basic structure of the power pipe gallery, and installing a detachable ring bracket combination device, lighting device and insulating pedal inside it, the construction period is shortened. It is greatly shortened, the cost is reduced, and the engineering efficiency is significantly improved. It has the advantages of wide application range, long economic life, good seismic performance, convenient installation, low operating cost, and basically no water seepage.
附图说明Description of drawings
图1为本实用新型实施例1结构示意图。Fig. 1 is a structural schematic diagram of Embodiment 1 of the utility model.
附图标记包括:预应力钢筒混凝土管1、环向底座2、电缆支架3、顶紧装置4、绝缘胶板5、照明灯具6、接地扁铁7、绝缘走道8。The reference signs include: prestressed steel cylinder concrete pipe 1, circular base 2, cable support 3, jacking device 4, insulating rubber plate 5, lighting fixture 6, ground flat iron 7, and insulating walkway 8.
具体实施方式Detailed ways
本实用新型原理在于,预应力钢筒混凝土管道是集合了薄钢板、中厚钢板、异型钢、普通钢筋、高强预应力钢丝、高强混凝土、高强砂浆和橡胶密封圈等原辅材料制造而成的免维护的管材,其发展至今,已有一套完整的设计模式,包括制造方法、不同的零件组合、承受内外压时预应力钢丝及管芯等不同部位的应力应变状况、腐蚀环境的设计选择等,使其可以适用在各种地下环境中,并保证其寿命和可靠性。预应力钢筒混凝土管的预应力钢丝、承插口、钢筒等均埋在水泥基砂浆或混凝土内,由于水泥本身高达PH 12.5的高碱性环境,使得内层金属表面产生钝化膜保护层,此保护层会阻止金属进一步氧化,所以预应力钢筒混凝土管具有其它管种所没有的防蚀特性,加之其100年的设计寿命,使得它的使用寿命长。同时,因其不透水薄钢筒、管芯高强混凝土及保护层高强砂浆的三重结构组合,使其具有极高的防水抗渗性;其采用柔性双橡胶圈钢制承插口,可满足至少0.5°的自由转角,能够在一定程度上抵抗不均匀沉降,抗震性优。同时,预应力钢筒混凝土管从管道的设计、原材料的采购验收、工序控制及成品检验等均在厂内完成,更便于质量控制,节约工期。因此以此为基础结构条件实现电力管廊是理想的。The principle of the utility model is that the prestressed steel cylinder concrete pipeline is manufactured by combining raw and auxiliary materials such as thin steel plate, medium-thick steel plate, special-shaped steel, ordinary steel bar, high-strength prestressed steel wire, high-strength concrete, high-strength mortar and rubber sealing ring. Maintenance-free pipes have developed a complete set of design patterns, including manufacturing methods, different parts combinations, stress and strain conditions of different parts such as prestressed steel wires and tube cores under internal and external pressure, and design choices for corrosive environments. , so that it can be applied in various underground environments, and its life and reliability are guaranteed. The prestressed steel wires, sockets, and steel cylinders of the prestressed steel cylinder concrete pipe are all buried in cement-based mortar or concrete. Due to the high alkaline environment of the cement itself as high as PH 12.5, a passive film protective layer is formed on the inner metal surface , This protective layer will prevent the metal from further oxidation, so the prestressed steel cylinder concrete pipe has anti-corrosion properties that other pipe types do not have, and its 100-year design life makes it have a long service life. At the same time, because of the triple structure combination of the impermeable thin steel cylinder, the high-strength concrete of the tube core and the high-strength mortar of the protective layer, it has extremely high waterproof and impermeability; it adopts a flexible double rubber ring steel socket, which can meet at least 0.5 The free rotation angle of ° can resist uneven settlement to a certain extent, and has excellent shock resistance. At the same time, the prestressed steel cylinder concrete pipe is completed in the factory from the design of the pipeline, the purchase and acceptance of raw materials, process control and finished product inspection, which is more convenient for quality control and saves construction time. Therefore, it is ideal to use this as the basic structural condition to realize the power pipe gallery.
本实用新型由预应力钢筒混凝土管1和内部配套设施组成。包括:预应力钢筒混凝土管1、环向底座2、电缆支架3、照明灯具6、接地扁铁7、绝缘走道8。The utility model is composed of a prestressed steel cylinder concrete pipe 1 and internal supporting facilities. Including: prestressed steel cylinder concrete pipe 1, ring base 2, cable support 3, lighting fixture 6, ground flat iron 7, insulating walkway 8.
下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
实施例1:如附图1所示,在预应力钢筒混凝土管1内壁,垂直于轴线安装环向底座2,在环向底座2上水平安装电缆支架3,同时,在预应力钢筒混凝土管1内壁上安装照明灯具6,在预应力钢筒混凝土管1内下部安装绝缘走道8。Embodiment 1: As shown in accompanying drawing 1, on the inner wall of the prestressed steel cylinder concrete pipe 1, a hoop base 2 is installed perpendicular to the axis, and a cable support 3 is installed horizontally on the hoop base 2. At the same time, the prestressed steel tube concrete A lighting fixture 6 is installed on the inner wall of the tube 1, and an insulating walkway 8 is installed at the inner lower part of the prestressed steel cylinder concrete tube 1.
前述中,在预应力钢筒混凝土管1内壁,垂直于轴线平行安装至少二个环向底座2,在相邻的环向底座2上相同高度分别水平安装至少二个电缆支架3。电力管线沿着预应力钢筒混凝土管1延伸方向顺担在这些电缆支架3上。In the foregoing, on the inner wall of the prestressed steel cylinder concrete pipe 1, at least two hoop bases 2 are installed perpendicular to the axis and parallel to the axis, and at least two cable supports 3 are horizontally installed on adjacent hoop bases 2 at the same height. The power pipelines are placed on these cable supports 3 along the extension direction of the prestressed steel cylinder concrete pipe 1 .
前述中,电缆支架3分别安装在环向底座2的左右二侧。In the foregoing, the cable brackets 3 are respectively installed on the left and right sides of the hoop base 2 .
前述中,环向底座2为可拆卸刚性结构,电缆支架3的一侧固定安装在环向底座2上。In the foregoing, the hoop base 2 is a detachable rigid structure, and one side of the cable support 3 is fixedly installed on the hoop base 2 .
前述中,环向底座2底部一段断开并连接顶紧装置4,而且,该顶紧装置4至少一端通过绝缘胶板5连接环向底座2的断开端面。该顶紧装置4呈弹性上弓结构或中部向上凸起的铰接结构。顶紧装置4中部向下压后向左右二端释放张力,使得环向底座2向外有限扩张压紧在预应力钢筒混凝土管1内壁固定以提供足够的稳固和荷载强度。In the foregoing, a section of the bottom of the hoop base 2 is disconnected and connected to the tightening device 4 , and at least one end of the tightening device 4 is connected to the disconnected end surface of the hoop base 2 through an insulating rubber plate 5 . The tightening device 4 has an elastic upper bow structure or a hinged structure in which the middle part protrudes upward. After the middle part of the tightening device 4 is pressed down, the tension is released to the left and right ends, so that the circumferential base 2 is limitedly expanded outwards and fixed on the inner wall of the prestressed steel cylinder concrete pipe 1 to provide sufficient stability and load strength.
前述中,照明灯具6安装在环向底座2的上部或左、右二侧。In the foregoing, the lighting fixture 6 is installed on the upper part or on the left and right sides of the circumferential base 2 .
前述中,环向底座2上安装接地扁铁7,接地扁铁7内端与预应力钢筒混凝土管1内的接地金属结构连接,接地扁铁7直接焊接在环向底座2下方,方便电缆敷设时保护线缆的敷设。In the above, the grounding flat iron 7 is installed on the hoop base 2, the inner end of the grounding flat iron 7 is connected to the grounding metal structure in the prestressed steel tube concrete pipe 1, and the grounding flat iron 7 is directly welded under the hoop base 2, which is convenient for cables Protect the laying of cables during laying.
前述中,在预应力钢筒混凝土管1内下部水平安装绝缘走道8,绝缘走道8为平板结构,并从内侧穿过并跨接相邻的环向底座2。In the foregoing, the insulating walkway 8 is horizontally installed in the lower part of the prestressed steel cylinder concrete pipe 1 , the insulating walkway 8 is a flat plate structure, and passes through and bridges the adjacent circular base 2 from the inside.
本实用新型中,环向底座2是由异型钢卷圆后制成,电缆支架3采用异型钢制成,在环向底座2上呈对称分布,可采用焊接或螺栓连接方式固定在环向支架底座上。In the utility model, the hoop base 2 is made of special-shaped steel rolled round, and the cable bracket 3 is made of special-shaped steel, which is symmetrically distributed on the hoop base 2 and can be fixed on the hoop bracket by welding or bolt connection. on the base.
本实用新型工作时,先安装预应力钢筒混凝土管1进行,安装好之后,再依次进行管廊内部可拆卸的环向底座2、电缆支架3、接地扁铁7、照明灯具6及绝缘走道8进行安装,环向底座2的间距根据电缆敷设规范要求设定,最终将电缆放置在电缆支架3上。采取顶紧装置将其锁紧贴合在管廊内壁。顶紧装置4顶紧前加绝缘胶板5,以满足地下电缆敷设的要求。When the utility model works, the prestressed steel cylinder concrete pipe 1 is installed first, and after installation, the detachable circular base 2, cable support 3, grounding flat iron 7, lighting fixture 6 and insulating walkway are sequentially carried out inside the pipe gallery. 8 for installation, the distance from the ring to the base 2 is set according to the requirements of the cable laying specification, and finally the cable is placed on the cable support 3. Use a jacking device to lock it tightly to the inner wall of the pipe gallery. An insulating rubber sheet 5 is added before the jacking device 4 is jacked up, so as to meet the requirements of underground cable laying.
本实用新型以高强、高抗渗性的预应力钢筒混凝土管1结构为管廊基础构造,在其内部安装可拆卸的环向底座2,进一步的再依次安装支架、照明、绝缘等管廊构件,是一种结构性能优异的新型的电力管廊。应用于电力管廊,充分利用了预应力钢筒混凝土管1高强度、高抗渗性、安装简单及免维护的特点,同时还兼具其质量容易控制、工期短、抗震性能优等特性。The utility model uses the high-strength, high-impermeability prestressed steel tube concrete pipe 1 structure as the basic structure of the pipe gallery, and installs a detachable circular base 2 inside it, and further installs the pipe gallery such as brackets, lighting, and insulation in sequence. The component is a new type of power pipe gallery with excellent structural performance. Applied to power pipe gallery, it makes full use of the characteristics of high strength, high impermeability, simple installation and maintenance-free of prestressed steel cylinder concrete pipe 1, and also has the characteristics of easy quality control, short construction period and excellent seismic performance.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520072246.XU CN204459502U (en) | 2015-01-28 | 2015-01-28 | Prestress steel cylinder concrete electric power piping lane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520072246.XU CN204459502U (en) | 2015-01-28 | 2015-01-28 | Prestress steel cylinder concrete electric power piping lane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204459502U true CN204459502U (en) | 2015-07-08 |
Family
ID=53666386
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520072246.XU Expired - Lifetime CN204459502U (en) | 2015-01-28 | 2015-01-28 | Prestress steel cylinder concrete electric power piping lane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204459502U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105958397A (en) * | 2016-05-31 | 2016-09-21 | 新疆大华龙管业有限公司 | Flexible joint reinforced concrete composite high-molecular waterproof layer electric power gallery |
| CN108797639A (en) * | 2018-06-26 | 2018-11-13 | 九州职业技术学院 | A kind of damping assembled underground pipe gallery and installation method |
-
2015
- 2015-01-28 CN CN201520072246.XU patent/CN204459502U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105958397A (en) * | 2016-05-31 | 2016-09-21 | 新疆大华龙管业有限公司 | Flexible joint reinforced concrete composite high-molecular waterproof layer electric power gallery |
| CN108797639A (en) * | 2018-06-26 | 2018-11-13 | 九州职业技术学院 | A kind of damping assembled underground pipe gallery and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203924113U (en) | Prefabricated pipe gallery | |
| CN204691790U (en) | A kind of Novel separated type cover arch of tunnel structural shape | |
| CN105064400A (en) | Urban comprehensive pipe rack of steel corrugated plate structure | |
| CN204898721U (en) | Steel construction city utility tunnel | |
| WO2008025200A1 (en) | A prestressed concrete pipe unit with a steel socket and a steel spigot and a concrete pipe formed of such concrete pipe units | |
| CN202247950U (en) | Square culvert component | |
| CN103883837B (en) | The pipe plugging part of adjustable interior outside dimension | |
| CN205670671U (en) | Cable seal water repellent component | |
| CN206929445U (en) | A kind of novel steel wire network framework drainpipe | |
| CN204151824U (en) | A kind of glass reinforced plastic underground comprehensive pipe network common trench | |
| CN205617425U (en) | Prefabricated structure of assembling of utility tunnel | |
| CN212612636U (en) | Prefabricated inspection well | |
| CN205557584U (en) | Steel pipe corridor and large -scale utility tunnel system | |
| CN104455889A (en) | Integrated underground pipe gallery with compensation device | |
| CN105735353A (en) | Prefabricated comprehensive pipe gallery | |
| CN208136954U (en) | Precast splice type Pipe rack | |
| CN108086356A (en) | A kind of prefabricated assembled tube-in-tube waterproof pipe gallery and installation method | |
| CN205205863U (en) | Prefabricated inspection shaft | |
| CN107269940A (en) | A kind of many Pipe racks of assembled waterproof | |
| CN204464920U (en) | PCCP power pipe gallery inner wall tension ring bracket base | |
| CN204717161U (en) | With the PCCP culvert pipe of pre-buried weldment | |
| CN204717156U (en) | With the PCCP culvert pipe of pre-buried EXPANSION ANCHOR BOLTS steel pipe | |
| CN204098062U (en) | Novel underground PCCP culvert pipe | |
| CN113531229B (en) | High-performance steel cylinder concrete composite jacking pipe and production process thereof | |
| CN109149488B (en) | Urban railway pipeline arrangement structure and method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150708 |
|
| CX01 | Expiry of patent term |