CN202047398U - Steel cable dam - Google Patents

Steel cable dam Download PDF

Info

Publication number
CN202047398U
CN202047398U CN2011201339289U CN201120133928U CN202047398U CN 202047398 U CN202047398 U CN 202047398U CN 2011201339289 U CN2011201339289 U CN 2011201339289U CN 201120133928 U CN201120133928 U CN 201120133928U CN 202047398 U CN202047398 U CN 202047398U
Authority
CN
China
Prior art keywords
dam
cable wire
dam body
fixed
trussed construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201339289U
Other languages
Chinese (zh)
Inventor
魏群
张国新
刘尚蔚
魏鲁双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN2011201339289U priority Critical patent/CN202047398U/en
Application granted granted Critical
Publication of CN202047398U publication Critical patent/CN202047398U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a steel cable dam, which comprises a truss structured dam body and steel structured water retaining face plates. The lower end of the truss structured dam body is fixed onto a dam base concrete supporting platform, steel cables are fixedly distributed on supporting joints of the truss structured dam body, each steel cable is obliquely dragged upwards to be fixed into the terrane or on concrete side slopes on two banks, and anticorrosive paint polyuria material layers are arranged on the truss structured dam body, the steel structured face plates, the steel cables and connecting bolts in an auxiliary manner. The steel cable dam is simple in structure, easy in construction and maintenance and short in construction period, since pressure borne by the side slopes on the two banks is alleviated by the steel cables to a large extent, requirements on the side slopes on the two banks in dam construction are not high, the steel cable dam is applicable to multiple terrains, even treatment to supporting platforms on side slopes on the two banks of dam shoulders can be omitted, and traction force of the dam body to the bottom supporting platform is alleviated to a great extent. Additionally, the steel cable dam is simple, stable and reliable in structure, long in service life, and suitable for industrialization production and on-site assembly implement, and cost is greatly reduced.

Description

The cable wire dam
Technical field
The utility model relates to the dam structure in Hydraulic and Hydro-Power Engineering field, specifically relates to a kind of cable wire dam.
Background technology
At present, there is multiple dam body in the hydrotechnics field, earth dam for example, and loose rock dam, concrete dam, arch dam, types such as steel-structure dam, all there is its unique advantage on various dams.Earth and rockfill dam expends a large amount of sandstone material, long construction period, and special release floodwatering facility and seepage control system need be set.Ordinary steel structure dam body, its origin of force normally utilizes dam base concrete cushion cap and the special constructing concrete side slope in two sides, steel work panel and trussed construction water pressure pass at the bottom of the dam and the two sides side slope, what the steel work dam body mainly bore is pressure, the technical requirements height of structural steel design need need comparatively complicated trussed construction according to the design of landform specific aim during construction, and need to increase truss thickness so that improve the pressure that it bears, thereby increased construction cost.
Summary of the invention
In order to overcome the deficiency that prior art exists, the utility model provides a kind of cable wire dam.
Technical scheme: a kind of cable wire dam, comprise trussed construction dam body and steel work water retaining facing, the lower end of trussed construction dam body is fixed on the dam foundation concrete bearing platform, distributing on each support node of trussed construction dam body is fixed with cable wire, each cable wire along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or two sides concrete side slope on.
The one or both ends Y-shaped composition cable wire of cable wire, each minute cable wire be separately fixed on the adjoining support node, perhaps be fixed on the diverse location of side slope rock stratum.
The two ends of trussed construction dam body are fixed on the concrete side slope of two sides.
The vertical pillar lower end of trussed construction dam body is provided with joint angle, is embedded with set bolt in concrete bearing platform, and each joint angle is by being bolted on the concrete bearing platform, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed simultaneously.
The trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.
The beneficial effects of the utility model:
1. cable wire of the present utility model dam has simple in structure, construction and maintenance easily, the advantage of short construction period, because cable wire has been alleviated the pressure that the two sides side slope is born to a great extent, so it is less demanding when building the dam to the two sides side slope, be applicable to multiple landform, even can save processing, also alleviated the tractive force of dam body simultaneously to a great extent the bottom cushion cap to dam abutment two sides side slope cushion cap.
2. utilize cable wire as the main load carrier of dam body, because that steel work bears tension strength easily is big, reduced the complexity of trussed construction, Stability Analysis of Structures is reliable, and long service life significantly reduces costs.Being suitable for suitability for industrialized production and assembled on site implements.
Description of drawings
Fig. 1 is the plan structure schematic diagram on utility model cable wire dam;
Fig. 2 is an A portion structure for amplifying schematic diagram among Fig. 1;
Fig. 3 is the B-B cross-sectional view of Fig. 1;
Fig. 4 is respectively two kinds of different wire rope structure schematic diagrames with Fig. 5;
Fig. 6 is the dam body and the concrete bearing platform coupling part structural representation of the utility model trussed construction;
Fig. 7 is the step-like side slope syndeton of dam body and the two sides schematic diagram of the utility model trussed construction.
The specific embodiment
Embodiment one: referring to Fig. 1-Fig. 4, Fig. 6, number in the figure 1 is the steel work panel of dam body, and 2 is trussed construction, 3 is cable wire, and 4 is dam base concrete cushion cap, and 5 is pre-embedded bolt, 6 is the connecting rod side slope, 7 is the riverbed, and 8 is the substrate steel plate, and 9 and 91 are respectively stake, 21 is pillar, 31 node sides divide cable wire, and 32 for the rock stratum end divides cable wire, and 61 is step.
The cable wire dam comprises trussed construction dam body 2 and steel work water retaining facing 1.The lower end of trussed construction dam body 2 is fixed on the dam foundation concrete bearing platform 4.Particularly, vertical pillar 21 lower ends of trussed construction are provided with joint angle, are embedded with set bolt 5 in concrete bearing platform, and each joint angle 21 is fixed on the concrete bearing platform by bolt 5, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed 9 simultaneously.Distributing on each support node of trussed construction dam body 2 is fixed with cable wire 3, and each cable wire 3 is tilted to the upstream tractive and is fixed in the rock stratum along countercurrent direction.
Embodiment two: referring to Fig. 5, content and embodiment one are basic identical, and something in common does not repeat, and different is: the one or both ends Y-shaped composition cable wire of cable wire, each minute, cable wire was separately fixed on the adjoining support node, perhaps was fixed on the diverse location of side slope rock stratum.
Embodiment three: referring to Fig. 7, content and embodiment one are basic identical, something in common does not repeat, and different is: the two ends of trussed construction dam body are fixed on the concrete side slope of two sides, each cable wire 3 along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or the concrete side slope on.
Embodiment four: accompanying drawing is not drawn, and content and embodiment one are basic identical, and something in common does not repeat, and different is: the trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.

Claims (5)

1. cable wire dam, comprise trussed construction dam body and steel work water retaining facing, it is characterized in that: the lower end of trussed construction dam body is fixed on the dam foundation concrete bearing platform, distribute on each support node of trussed construction dam body and be fixed with cable wire, each cable wire along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or two sides concrete side slope on, auxiliary on trussed construction dam body, steel work panel and cable wire and the connecting bolt have one deck anticorrosive paint polyurea materials.
2. cable wire according to claim 1 dam is characterized in that: the one or both ends Y-shaped composition cable wire of cable wire, each minute cable wire be separately fixed on the adjoining support node, perhaps be fixed on the diverse location of side slope rock stratum.
3. cable wire according to claim 1 dam is characterized in that: the two ends of trussed construction dam body are fixed on the concrete side slope of two sides.
4. cable wire according to claim 1 dam, it is characterized in that: the vertical pillar lower end of trussed construction dam body is provided with joint angle, be embedded with set bolt in concrete bearing platform, each joint angle is by being bolted on the concrete bearing platform, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed simultaneously.
5. cable wire according to claim 1 dam is characterized in that: the trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.
CN2011201339289U 2011-04-29 2011-04-29 Steel cable dam Expired - Fee Related CN202047398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201339289U CN202047398U (en) 2011-04-29 2011-04-29 Steel cable dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201339289U CN202047398U (en) 2011-04-29 2011-04-29 Steel cable dam

Publications (1)

Publication Number Publication Date
CN202047398U true CN202047398U (en) 2011-11-23

Family

ID=44987711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201339289U Expired - Fee Related CN202047398U (en) 2011-04-29 2011-04-29 Steel cable dam

Country Status (1)

Country Link
CN (1) CN202047398U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140787A (en) * 2011-04-29 2011-08-03 华北水利水电学院 Steel cable dam
CN102518086A (en) * 2011-12-26 2012-06-27 华北水利水电学院 Soil-retaining dam and construction method thereof
CN105507210A (en) * 2015-11-27 2016-04-20 河南奥斯派克科技有限公司 Small-angle and long-slope-surface steel panel assembly type steel structured dam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140787A (en) * 2011-04-29 2011-08-03 华北水利水电学院 Steel cable dam
CN102518086A (en) * 2011-12-26 2012-06-27 华北水利水电学院 Soil-retaining dam and construction method thereof
CN105507210A (en) * 2015-11-27 2016-04-20 河南奥斯派克科技有限公司 Small-angle and long-slope-surface steel panel assembly type steel structured dam

Similar Documents

Publication Publication Date Title
CN201850498U (en) Steel trestle in water
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN201581656U (en) Steel trestle for large-scale complicated construction sites
CN201254730Y (en) Reinforcement tower foundation
CN201132960Y (en) Composite batardeau of steel light structure
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN202280075U (en) Combined type retaining wall of prefabricated part
CN202047398U (en) Steel cable dam
CN202227360U (en) Wide-span prestressed concrete pile beam plate structure used for grounds of buildings, workshops, etc.
CN102251524A (en) Foundation pit side wall prestressed anchor rod spreader beam row pile enclosing structure
CN202416967U (en) Principal material length adjusting device for tower leg of inclined power transmission tower in coal mine subsidence area
CN201610546U (en) Prestress anchoring frame plat
CN210031461U (en) Towerless suspension bridge structure system
CN102140787A (en) Steel cable dam
CN201330609Y (en) Inside-tunnel steel support mechanical lifting device of shallow-tunneling cavern
CN101260645B (en) Wide span canting pull type trestle
CN106533334A (en) Novel single-layer parallel suspension cable photovoltaic support system
CN204040058U (en) Combined tower crane foundation structure
CN202000261U (en) Prestressed balancing bracket
CN202346643U (en) Assembled tower crane base
CN212533734U (en) Cable buckle integrated tower
CN210151768U (en) Position structure of bridge pile foundation and subway tunnel
CN210369025U (en) Floor-free tower crane foundation construction structure with steel structure
CN208309616U (en) A kind of assembled prefabricated house prefabricated foundation that piece is staggered

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20130429