CN102140787A CN 201110110983 CN201110110983A CN102140787A CN 102140787 A CN102140787 A CN 102140787A CN 201110110983 CN201110110983 CN 201110110983 CN 201110110983 A CN201110110983 A CN 201110110983A CN 102140787 A CN102140787 A CN 102140787A
Authority
CN
China
Prior art keywords
dam
cable wire
dam body
fixed
trussed construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110110983
Other languages
Chinese (zh)
Inventor
魏群
张国新
刘尚蔚
魏鲁双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN 201110110983 priority Critical patent/CN102140787A/en
Publication of CN102140787A publication Critical patent/CN102140787A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a steel cable dam comprising a truss structure dam body and a steel structure water retaining panel, wherein the lower end of the truss structure dam body is fixed on a dam foundation concrete bearing platform; steel cables are distributed and fixed on support nodes of the truss structure dam body, obliquely upstream pulled along an upstream direction and fixed in a rock stratum or both-bank concrete side slopes; and the truss structure dam body, the steel structure water retaining panel, the steel cables and connecting bolts are accessorily coated with anticorrosive paint polyurea materials. The steel cable dam has the advantages of simple structure, easy construction and maintenance and short construction period, has low requirements on the both-bank concrete side slopes during dam construction because the steel cables relieve the pressure born by the both-bank concrete side slope to a great degree, is suitable for various terrains, can even save the processing of bearing platforms of the both-bank concrete side slopes positioned on dam abutments and also relieve the pulling force of the truss structure dam body on a bottom bearing platform to a great degree; and in addition, the invention has the advantages of simple, stable and reliable structure, long service life and more cost reduction, and is suitable for industrialized production and field assembly implementation.

Description

The cable wire dam
 
Technical field
The present invention relates to the dam structure in Hydraulic and Hydro-Power Engineering field, specifically relate to a kind of cable wire dam.
Background technology
At present, there is multiple dam body in the hydrotechnics field, earth dam for example, and loose rock dam, concrete dam, arch dam, types such as steel-structure dam, all there is its unique advantage on various dams.Earth and rockfill dam expends a large amount of sandstone material, long construction period, and special release floodwatering facility and seepage control system need be set.Ordinary steel structure dam body, its origin of force normally utilizes dam base concrete cushion cap and the special constructing concrete side slope in two sides, steel work panel and trussed construction water pressure pass at the bottom of the dam and the two sides side slope, what the steel work dam body mainly bore is pressure, the technical requirements height of structural steel design need need comparatively complicated trussed construction according to the design of landform specific aim during construction, and need to increase truss thickness so that improve the pressure that it bears, thereby increased construction cost.
Summary of the invention
In order to overcome the deficiency that prior art exists, the invention provides a kind of cable wire dam.
Technical scheme: a kind of cable wire dam, comprise trussed construction dam body and steel work water retaining facing, the lower end of trussed construction dam body is fixed on the dam foundation concrete bearing platform, distributing on each support node of trussed construction dam body is fixed with cable wire, each cable wire along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or two sides concrete side slope on.
The one or both ends Y-shaped composition cable wire of cable wire, each minute cable wire be separately fixed on the adjoining support node, perhaps be fixed on the diverse location of side slope rock stratum.
The two ends of trussed construction dam body are fixed on the concrete side slope of two sides.
The vertical pillar lower end of trussed construction dam body is provided with joint angle, is embedded with set bolt in concrete bearing platform, and each joint angle is by being bolted on the concrete bearing platform, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed simultaneously.
The trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.
Beneficial effect of the present invention:
1. cable wire of the present invention dam has simple in structure, construction and maintenance easily, the advantage of short construction period, because cable wire has been alleviated the pressure that the two sides side slope is born to a great extent, so it is less demanding when building the dam to the two sides side slope, be applicable to multiple landform, even can save processing, also alleviated the tractive force of dam body simultaneously to a great extent the bottom cushion cap to dam abutment two sides side slope cushion cap.
2. utilize cable wire as the main load carrier of dam body, because that steel work bears tension strength easily is big, reduced the complexity of trussed construction, Stability Analysis of Structures is reliable, and long service life significantly reduces costs.Being suitable for suitability for industrialized production and assembled on site implements.
Description of drawings
Fig. 1 is the plan structure schematic diagram on cable wire of the present invention dam;
Fig. 2 is an A portion structure for amplifying schematic diagram among Fig. 1;
Fig. 3 is the B-B cross-sectional view of Fig. 1;
Fig. 4 is respectively two kinds of different wire rope structure schematic diagrames with Fig. 5;
Fig. 6 is the dam body and the concrete bearing platform coupling part structural representation of trussed construction of the present invention;
Fig. 7 is the step-like side slope syndeton of dam body and the two sides schematic diagram of trussed construction of the present invention.
The specific embodiment
Embodiment one: referring to Fig. 1-Fig. 4, Fig. 6, number in the figure 1 is the steel work panel of dam body, and 2 is trussed construction, 3 is cable wire, and 4 is dam base concrete cushion cap, and 5 is pre-embedded bolt, 6 is the connecting rod side slope, 7 is the riverbed, and 8 is the substrate steel plate, and 9 and 91 are respectively stake, 21 is pillar, 31 node sides divide cable wire, and 32 for the rock stratum end divides cable wire, and 61 is step.
The cable wire dam comprises trussed construction dam body 2 and steel work water retaining facing 1.The lower end of trussed construction dam body 2 is fixed on the dam foundation concrete bearing platform 4.Particularly, vertical pillar 21 lower ends of trussed construction are provided with joint angle, are embedded with set bolt 5 in concrete bearing platform, and each joint angle 21 is fixed on the concrete bearing platform by bolt 5, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed 9 simultaneously.Distributing on each support node of trussed construction dam body 2 is fixed with cable wire 3, and each cable wire 3 is tilted to the upstream tractive and is fixed in the rock stratum along countercurrent direction.
Embodiment two: referring to Fig. 5, content and embodiment one are basic identical, and something in common does not repeat, and different is: the one or both ends Y-shaped composition cable wire of cable wire, each minute, cable wire was separately fixed on the adjoining support node, perhaps was fixed on the diverse location of side slope rock stratum.
Embodiment three: referring to Fig. 7, content and embodiment one are basic identical, something in common does not repeat, and different is: the two ends of trussed construction dam body are fixed on the concrete side slope of two sides, each cable wire 3 along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or the concrete side slope on.
Embodiment four: accompanying drawing is not drawn, and content and embodiment one are basic identical, and something in common does not repeat, and different is: the trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.

Claims (5)

1. cable wire dam, comprise trussed construction dam body and steel work water retaining facing, it is characterized in that: the lower end of trussed construction dam body is fixed on the dam foundation concrete bearing platform, distribute on each support node of trussed construction dam body and be fixed with cable wire, each cable wire along countercurrent direction be tilted to the upstream tractive and be fixed in the rock stratum or two sides concrete side slope on, auxiliary on trussed construction dam body, steel work panel and cable wire and the connecting bolt have one deck anticorrosive paint polyurea materials.
2. cable wire according to claim 1 dam is characterized in that: the one or both ends Y-shaped composition cable wire of cable wire, each minute cable wire be separately fixed on the adjoining support node, perhaps be fixed on the diverse location of side slope rock stratum.
3. cable wire according to claim 1 dam is characterized in that: the two ends of trussed construction dam body are fixed on the concrete side slope of two sides.
4. cable wire according to claim 1 dam, it is characterized in that: the vertical pillar lower end of trussed construction dam body is provided with joint angle, be embedded with set bolt in concrete bearing platform, each joint angle is by being bolted on the concrete bearing platform, and the lower end of concrete bearing platform is provided with the stake of going deep in the riverbed simultaneously.
5. cable wire according to claim 1 dam is characterized in that: the trussed construction dam body is that a kind of convex globoidal is the arch of upstream face.
CN 201110110983 2011-04-29 2011-04-29 Steel cable dam Pending CN102140787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110110983 CN102140787A (en) 2011-04-29 2011-04-29 Steel cable dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110110983 CN102140787A (en) 2011-04-29 2011-04-29 Steel cable dam

Publications (1)

Publication Number Publication Date
CN102140787A true CN102140787A (en) 2011-08-03

Family

ID=44408565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110110983 Pending CN102140787A (en) 2011-04-29 2011-04-29 Steel cable dam

Country Status (1)

Country Link
CN (1) CN102140787A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912769A (en) * 2012-10-29 2013-02-06 天津大学 Dragline buttress steel dam
CN105350497A (en) * 2015-11-26 2016-02-24 华北水利水电大学 Automatic deformation adjusting device for steel face plate dam
CN105507210A (en) * 2015-11-27 2016-04-20 河南奥斯派克科技有限公司 Small-angle and long-slope-surface steel panel assembly type steel structured dam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1328193A (en) * 2000-06-08 2001-12-26 浦晓亭 Steel cable reinforcing engineering for reservoir dam
CN101457364A (en) * 2008-12-31 2009-06-17 江苏中矿大正表面工程技术有限公司 Sealing corrosion proof protection method of rope-suspension bridge cable system
CN101864805A (en) * 2010-04-26 2010-10-20 河南奥斯派克科技有限公司 Steel dam space truss structure unit body and arch-style steel dam
CN202047398U (en) * 2011-04-29 2011-11-23 华北水利水电学院 Steel cable dam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1328193A (en) * 2000-06-08 2001-12-26 浦晓亭 Steel cable reinforcing engineering for reservoir dam
CN101457364A (en) * 2008-12-31 2009-06-17 江苏中矿大正表面工程技术有限公司 Sealing corrosion proof protection method of rope-suspension bridge cable system
CN101864805A (en) * 2010-04-26 2010-10-20 河南奥斯派克科技有限公司 Steel dam space truss structure unit body and arch-style steel dam
CN202047398U (en) * 2011-04-29 2011-11-23 华北水利水电学院 Steel cable dam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912769A (en) * 2012-10-29 2013-02-06 天津大学 Dragline buttress steel dam
CN105350497A (en) * 2015-11-26 2016-02-24 华北水利水电大学 Automatic deformation adjusting device for steel face plate dam
CN105350497B (en) * 2015-11-26 2017-04-05 华北水利水电大学 Steel facing dam adjust automatically deformation device
CN105507210A (en) * 2015-11-27 2016-04-20 河南奥斯派克科技有限公司 Small-angle and long-slope-surface steel panel assembly type steel structured dam

Similar Documents

Publication Publication Date Title
CN201850498U (en) Steel trestle in water
CN201132960Y (en) Composite batardeau of steel light structure
CN203684059U (en) Large-span deck Bailey beam steel trestle structure
CN202280075U (en) Combined type retaining wall of prefabricated part
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN101982624B (en) Buckling-resistant supporting element bound by four square pipes
CN107059880B (en) Reinforcing structure of concrete-fabricated section steel mixed support system of ultra-large deep foundation pit and construction method thereof
CN202787271U (en) Stacked inner supporting structure for foundation pit supporting
CN202187280U (en) Single-main-cable system suspension bridge
CN202047398U (en) Steel cable dam
CN201232194Y (en) Anti-deformation power transmission tower
CN201610546U (en) Prestress anchoring frame plat
CN102140787A (en) Steel cable dam
CN109972629A (en) A kind of assembled triangle girder truss steel structure support and combinations thereof key
CN202767102U (en) Combined type balance weight retaining wall
CN210288428U (en) Combined supporting structure
CN102888855A (en) Combined balance weight retaining wall
CN202187345U (en) Gravity type anchorage construction in Karst regions
CN214116253U (en) Reinforcing apparatus of mountain-climbing channel
CN214245751U (en) H-shaped steel anchor cable enclosing purlin
CN202346643U (en) Assembled tower crane base
CN204040058U (en) Combined tower crane foundation structure
CN202000261U (en) Prestressed balancing bracket
CN210031461U (en) Towerless suspension bridge structure system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110803