CN202039394U - 一种桩基础高压喷水扰动纠偏施工设备 - Google Patents
一种桩基础高压喷水扰动纠偏施工设备 Download PDFInfo
- Publication number
- CN202039394U CN202039394U CN2011201128786U CN201120112878U CN202039394U CN 202039394 U CN202039394 U CN 202039394U CN 2011201128786 U CN2011201128786 U CN 2011201128786U CN 201120112878 U CN201120112878 U CN 201120112878U CN 202039394 U CN202039394 U CN 202039394U
- Authority
- CN
- China
- Prior art keywords
- pressure
- pore
- deviation
- pile foundation
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
一种桩基础高压喷水扰动纠偏施工设备,包括高压输送泵(1)、成孔导流器(2)与高压喷射嘴(3)三部分组成,其中的高压输送泵(1)为向高压喷射嘴(3)输送高压水的设备,高压输送泵(1)与水源(4)及成孔导流器(2)连接,成孔导流器(2)与高压喷射嘴(3)连接,成孔导流器(2)为将高压喷射嘴(3)送至预定位置并将高压水输送至高压喷射嘴(3)的设备,该施工设备可通过对桩(6)周围的土体(5)或桩(6)端部持力层土体(5)进行高压喷水扰动,降低土体(5)强度,使桩在荷载作用下下沉,从而达到纠偏施工目的,可顺利实现桩基础纠偏施工,施工质量可靠高效,且可确保纠偏施工过程中原有建筑物或构筑物的安全。
Description
技术领域
本发明涉及土木工程中桩基础建筑物或构筑物纠偏工程领域。
背景技术
随着地下空间开发与城市建设的迅速发展,已有建筑物或构筑物因软土地基、邻近基坑开挖、周边隧道的掘进、附近大面积堆载等种种原因,经常出现建筑物或构筑物出现沉降、不均匀沉降较大,导致建筑物或构筑物倾斜,影响建筑物或构筑物的正常使用与安全,当建筑物或构筑物差异沉降或倾斜过大时,则需要进行纠偏处理。对于桩基础,有时因设计不当或周边邻近工程的影响等原因,亦有倾斜情况出现,当建筑物或构筑物基础打桩后,其纠偏工作难度相当大,目前尚无经济有效的施工工艺与施工设备。
发明的内容
本发明的目的在于提供一种桩基础高压喷水扰动纠偏施工设备,该桩基础高压喷水扰动纠偏施工设备可以顺利实现桩基础建筑物或构筑物的纠偏施工。
该桩基础高压喷水扰动纠偏施工设备包括高压输送泵、成孔导流器与高压喷射嘴三部分组成,其中的高压输送泵为向高压喷射嘴输送高压水的设备,高压输送泵与水源及成孔导流器连接,成孔导流器与高压喷射嘴连接,成孔导流器为将高压喷射嘴送至预定位置并将高压水输送至高压喷射嘴的设备。
由于本发明的桩基础高压喷水扰动纠偏施工设备可顺利实现桩基础纠偏施工,施工质量可靠,且可确保纠偏施工过程中原有建筑物或构筑物的安全。
附图说明
图1为本发明的一个实施例剖面示意图;
具体实施方式
作为本发明的一个实施例,主要目的在于介绍本发明的一种桩基础高压喷水扰动纠偏施工方法及其所用的施工设备。首先结合图1介绍本发明的一种桩基础高压喷水扰动纠偏所用的施工设备的结构构造及其工作原理。如图1所示,本发明的桩基础高压喷水扰动纠偏施工设备包括高压输送泵(1)、成孔导流器(2)与高压喷射嘴(3)三部分组成,其中的高压输送泵(1)为向高压喷射嘴(3)输送高压水的设备,高压输送泵(1)与水源(4)及成孔导流器(2)连接,高压输送泵(1)从水源(4)中抽入水,通过加压后将高压水送入成孔导流器(2),成孔导流器(2)与高压喷射嘴(3)连接,成孔导流器(2)为将高压喷射嘴(3)送至预定位置并将高压水输送至高压喷射嘴(3)的设备,成孔导流器(2)可以是锚杆钻机等钻凿机械,高压水通过高压喷射嘴(3)射入其周边的土体(5),在土体中形成高压水枪,可对土体(5)进行切割、扰动与破坏,高压喷射嘴(3)可通过移动、转动或摆动扩大扰动范围,土体扰动后,靠土体支撑的桩(6)在桩顶荷载的作用下便会下沉,从而达到扰动纠偏目的。本实施例的以下部分结合图1介绍本发明的一种桩基础高压喷水扰动纠偏施工方法。在该扰动纠偏方法的第一步,可根据沉降观测资料或已建建筑物或构筑物(7)的垂直度测量确定建筑物或构筑物(7)的倾斜方向,然后进入第二步。在本步骤中,只需根据第一步骤中的观测资料,确定对沉降小一侧的桩(6)进行促沉以达到纠偏目的,需促沉的桩(6)的位置即为纠偏施工需要促沉处位置,从而完成第二步,进入第三步。在本步骤中,根据桩(6)周围及桩(6)底部土的性质,确定需进行高压喷水扰动的土体位置,需扰动土的位置可以是桩(6)底部的土,也可以是桩(6)周围的土,还可以对桩(6)底部的土及桩(6)周围的土均进行扰动。可以采取以下的方法确定需进行高压喷水扰动的土体位置,如桩(6)周围的土对桩(6)的下沉起决定性的作用,可仅对桩(6)周围的土进行喷水扰动,若桩(6)底部的土对桩(6)的下沉起决定性的作用,可选择对桩(6)底部的土进行喷水扰动,若桩(6)底部的土与周围的土均对桩(6)的下沉起重要作用,则对桩(6)周围的土及桩(6)底部的土均进行喷水扰动。从而完成第三步,进入第四步。在本步骤中,可利用本实施例前一部分介绍的桩基础高压喷水扰动纠偏所用的施工设备对第三步确定的土体(5)进行高压喷水扰动施工,利用高压喷射嘴(3)喷射的高压水对桩(6)周围的土、桩(6)底部的土进行扰动、切割,破坏土体的结构,降低土体的强度。从而完成第四步,进入第五步。在本步骤中,在第四步对土体扰动施工的过程中,对需纠偏的建筑物或构筑物(7)进行沉降观测,并根据观测结果控制高压喷水扰动施工作业的强度、幅度与持续时间,如桩(6)的沉降速度过快,可减少扰动范围、扰动次数、扰动强度与时间,如桩(6)的下沉速度太慢,则可增加扰动范围、扰动次数、扰动强度与时间。从而完成第五步,进入第六步。在本步骤中,根据纠偏量的大小确定是否需要重复第五步骤直至完成纠偏施工。从而完成本发明的一种桩基础高压喷水扰动纠偏施工方法。
本专利包括但不限于本领域内专业人士可替代使用的其他施工方法。
Claims (1)
1.一种桩基础高压喷水扰动纠偏施工设备,其特征是包括高压输送泵(1)、成孔导流器(2)与高压喷射嘴(3)三部分组成,其中的高压输送泵(1)为向高压喷射嘴(3)输送高压水的设备,高压输送泵(1)与水源(4)及成孔导流器(2)连接,成孔导流器(2)与高压喷射嘴(3)连接,成孔导流器(2)为将高压喷射嘴(3)送至预定位置并将高压水输送至高压喷射嘴(3)的设备。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201128786U CN202039394U (zh) | 2011-04-18 | 2011-04-18 | 一种桩基础高压喷水扰动纠偏施工设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201128786U CN202039394U (zh) | 2011-04-18 | 2011-04-18 | 一种桩基础高压喷水扰动纠偏施工设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202039394U true CN202039394U (zh) | 2011-11-16 |
Family
ID=44966844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201128786U Expired - Lifetime CN202039394U (zh) | 2011-04-18 | 2011-04-18 | 一种桩基础高压喷水扰动纠偏施工设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202039394U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251542A (zh) * | 2011-04-18 | 2011-11-23 | 张继红 | 一种桩基础高压喷水扰动纠偏施工方法及其所用的施工设备 |
CN104975622A (zh) * | 2015-07-18 | 2015-10-14 | 兰州理工大学 | 一种高层建筑预制桩桩基纠偏加固方法 |
-
2011
- 2011-04-18 CN CN2011201128786U patent/CN202039394U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251542A (zh) * | 2011-04-18 | 2011-11-23 | 张继红 | 一种桩基础高压喷水扰动纠偏施工方法及其所用的施工设备 |
CN104975622A (zh) * | 2015-07-18 | 2015-10-14 | 兰州理工大学 | 一种高层建筑预制桩桩基纠偏加固方法 |
CN104975622B (zh) * | 2015-07-18 | 2017-01-11 | 兰州理工大学 | 一种高层建筑预制桩桩基纠偏加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251542A (zh) | 一种桩基础高压喷水扰动纠偏施工方法及其所用的施工设备 | |
CN108080409A (zh) | 一种土壤修复三重旋喷设备及其方法 | |
CN103114599B (zh) | 深基坑封闭降水装置及其施工方法 | |
CN110359467A (zh) | 一种基坑工程高压旋喷桩加固的施工方法 | |
CN102733389B (zh) | 一种高压射流振动沉桩装置及沉桩工艺 | |
CN106087994A (zh) | 一种高压喷射灌浆成孔护壁结构及其施工方法 | |
CN107964974A (zh) | 一种止水帷幕施工装置及其施工方法 | |
JP4520913B2 (ja) | 地盤改良方法および既存構造物基礎の補強方法 | |
CN102953374A (zh) | 一种输电线路铁塔桩基施工用高压旋喷桩施工方法 | |
CN202039394U (zh) | 一种桩基础高压喷水扰动纠偏施工设备 | |
CN101798823B (zh) | 通道法远程纠偏工法 | |
CN103603357B (zh) | 一种多平台无内支撑自防水基坑围护结构及其施工方法 | |
CN101824825B (zh) | 一种深基坑明挖施工方法 | |
CN208033274U (zh) | 一种土壤修复三重旋喷设备 | |
CN105113530A (zh) | 高压喷射沉井助沉工艺 | |
CN107237332A (zh) | 一种采用复合型土钉墙的含流砂层基坑边坡支护方法 | |
CN109267575A (zh) | 软土区坑中坑基坑支护的施工方法 | |
CN104074183A (zh) | 一种钻孔及根部注入砼的组合桩植桩结构及施工方法 | |
CN207260138U (zh) | 高压旋喷搅拌承载桩的钻杆及具有其的装置 | |
JP2007170008A (ja) | 液状化対策工法 | |
CN208563316U (zh) | 一种大直径灌注桩桩底虚土沉渣处理装置 | |
CN108361037A (zh) | 一种竖井快速施工方法及设备 | |
CN105350544B (zh) | 用于含有块石区域的止水帷幕及其施工方法 | |
CN103074887A (zh) | 钻喷一体化地基处理方法及专用钻具组件 | |
CN106120811A (zh) | 一种基坑周边预防变形和纠偏施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170705 Address after: 200086 Shanghai city Hongkou District Helen Road 306 Lane 4, Room 502 Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd. Address before: 200086 Shanghai Helen Road, Lane 306 No. 4 Room 502 Patentee before: Zhang Jihong |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20111116 |
|
CX01 | Expiry of patent term |