CN109267575A - 软土区坑中坑基坑支护的施工方法 - Google Patents
软土区坑中坑基坑支护的施工方法 Download PDFInfo
- Publication number
- CN109267575A CN109267575A CN201811346325.XA CN201811346325A CN109267575A CN 109267575 A CN109267575 A CN 109267575A CN 201811346325 A CN201811346325 A CN 201811346325A CN 109267575 A CN109267575 A CN 109267575A
- Authority
- CN
- China
- Prior art keywords
- hole
- foundation pit
- pressure rotary
- construction
- round steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种软土区坑中坑基坑支护的施工方法,本方法在坑中坑基坑的结构边缘外侧500mm设置高压旋喷桩及圆钢管桩,圆钢管桩插入高压旋喷桩中心,高压旋喷桩及圆钢管桩长度经计算确定;在高压旋喷桩的上部设置一圈压顶梁,圆钢管桩锚入到压顶梁内;然后进行基坑开挖及结构施工,结构施工完成后基坑内土方回填,将圆钢管桩从高压旋喷桩内拔出再利用。本方法克服传统坑中坑基坑支护施工的缺陷,本方法工作原理简单,施工方便,止水性能好,基坑安全可靠,可简单、高效、安全的完成坑中坑开挖及结构施工。
Description
技术领域
本发明涉及一种软土区坑中坑基坑支护的施工方法。
背景技术
针对深厚软土地区,尤其是淤泥层深厚的地区,为了保证基坑安全,坑中坑的土方开挖往往需要进行基坑支护,在施工场地条件允许的情况下,往往采用钢板桩支护的方式进行支护,但在坑中坑上部存在支撑梁等障碍物的情况下,由于钢板桩机体型较大,往往无法实现钢板桩支护施工。
发明内容
本发明所要解决的技术问题是提供一种软土区坑中坑基坑支护的施工方法,本方法克服传统坑中坑基坑支护施工的缺陷,本方法工作原理简单,施工方便,止水性能好,基坑安全可靠,可简单、高效、安全的完成坑中坑开挖及结构施工。
为解决上述技术问题,本发明软土区坑中坑基坑支护的施工方法包括如下步骤:
步骤一、按坑中坑基坑支护设计图纸,沿坑中坑基坑边缘外侧500mm测量放线,确定高压旋喷桩的桩位;
步骤二、高压旋喷桩机就位,调整好水泥掺量、旋喷压力参数后,开始施打高压旋喷桩,每根高压旋喷桩施工完毕后,利用挖机将圆钢管桩插入高压旋喷桩中心;
步骤三、沿高压旋喷桩顶端绑扎压顶梁钢筋,并浇筑混凝土形成压顶梁,圆钢管桩顶端锚入到压顶梁内;
步骤四、开挖坑中坑基坑土方,至坑中坑基坑底部标高后进行垫层及防水层施工,然后进行基坑内结构施工;
步骤五、基坑内土方回填,将圆钢管桩从高压旋喷桩内拔出再利用。
进一步,所述坑中坑基坑的压顶梁设置水平支撑钢管进行支撑。
进一步,所述高压旋喷桩桩径为800mm、间距为600mm,所述圆钢管桩尺寸为Φ152×6mm。
进一步,所述压顶梁尺寸为300×800mm。
由于本发明软土区坑中坑基坑支护的施工方法采用了上述技术方案,即本方法在坑中坑基坑的结构边缘外侧500mm设置高压旋喷桩及圆钢管桩,圆钢管桩插入高压旋喷桩中心,高压旋喷桩及圆钢管桩长度经计算确定;在高压旋喷桩的上部设置一圈压顶梁,圆钢管桩锚入到压顶梁内;然后进行基坑开挖及结构施工,结构施工完成后基坑内土方回填,将圆钢管桩从高压旋喷桩内拔出再利用。本方法克服传统坑中坑基坑支护施工的缺陷,本方法工作原理简单,施工方便,止水性能好,基坑安全可靠,可简单、高效、安全的完成坑中坑开挖及结构施工。
附图说明
下面结合附图和实施方式对本发明作进一步的详细说明:
图1为本发明软土区坑中坑基坑支护的施工方法平面示意图;
图2为图1中A-A剖面示意图。
具体实施方式
实施例如图1和图2所示,本发明软土区坑中坑基坑支护的施工方法包括如下步骤:
步骤一、按坑中坑基坑支护设计图纸,沿坑中坑基坑1边缘外侧500mm测量放线,确定高压旋喷桩2的桩位;
步骤二、高压旋喷桩机就位,调整好水泥掺量、旋喷压力参数后,开始施打高压旋喷桩2,每根高压旋喷桩2施工完毕后,利用挖机将圆钢管桩3插入高压旋喷桩2中心;
步骤三、沿高压旋喷桩2顶端绑扎压顶梁4钢筋,并浇筑混凝土形成压顶梁4,圆钢管桩3顶端锚入到压顶梁4内;
步骤四、开挖坑中坑基坑1土方,至坑中坑基坑底部标高后进行垫层及防水层5施工,然后进行基坑1内结构施工;
步骤五、基坑1内土方回填,将圆钢管桩3从高压旋喷桩2内拔出再利用。
优选的,所述坑中坑基坑1的压顶梁4设置水平支撑钢管6进行支撑。
优选的,所述高压旋喷桩2桩径为800mm、间距为600mm,所述圆钢管桩3尺寸为Φ152×6mm。
优选的,所述压顶梁4尺寸为300×800mm。
本方法在坑中坑基坑周边施打高压旋喷桩,在高压旋喷桩中心插入圆钢管桩,并设置压顶梁形成基坑的支护,由于高压旋喷桩及机身较小,无论坑中坑上部是否存在障碍,均可实现施工,通过旋喷桩和圆钢管桩组合形成重力式挡土墙,然后进行坑内土方开挖,垫层、防水及坑内结构的施工,保证施工安全,同时圆钢管桩可回收利用,节约成本。
Claims (4)
1.一种软土区坑中坑基坑支护的施工方法,其特征在于本方法包括如下步骤:
步骤一、按坑中坑基坑支护设计图纸,沿坑中坑基坑边缘外侧500mm测量放线,确定高压旋喷桩的桩位;
步骤二、高压旋喷桩机就位,调整好水泥掺量、旋喷压力参数后,开始施打高压旋喷桩,每根高压旋喷桩施工完毕后,利用挖机将圆钢管桩插入高压旋喷桩中心;
步骤三、沿高压旋喷桩顶端绑扎压顶梁钢筋,并浇筑混凝土形成压顶梁,圆钢管桩顶端锚入到压顶梁内;
步骤四、开挖坑中坑基坑土方,至坑中坑基坑底部标高后进行垫层及防水层施工,然后进行基坑内结构施工;
步骤五、基坑内土方回填,将圆钢管桩从高压旋喷桩内拔出再利用。
2.根据权利要求1所述的软土区坑中坑基坑支护的施工方法,其特征在于:所述坑中坑基坑的压顶梁设置水平支撑钢管进行支撑。
3.根据权利要求1或2所述的软土区坑中坑基坑支护的施工方法,其特征在于:所述高压旋喷桩桩径为800mm、间距为600mm,所述圆钢管桩尺寸为Φ152×6mm。
4.根据权利要求1或2所述的软土区坑中坑基坑支护的施工方法,其特征在于:所述压顶梁尺寸为300×800mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811346325.XA CN109267575A (zh) | 2018-11-13 | 2018-11-13 | 软土区坑中坑基坑支护的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811346325.XA CN109267575A (zh) | 2018-11-13 | 2018-11-13 | 软土区坑中坑基坑支护的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109267575A true CN109267575A (zh) | 2019-01-25 |
Family
ID=65193558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811346325.XA Pending CN109267575A (zh) | 2018-11-13 | 2018-11-13 | 软土区坑中坑基坑支护的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109267575A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158649A (zh) * | 2019-06-05 | 2019-08-23 | 浙江交工集团股份有限公司 | 一种沉井下沉施工时邻近地下管线的施工方法 |
CN113174956A (zh) * | 2021-04-29 | 2021-07-27 | 中交路桥建设有限公司 | 风积沙高陡边坡施工平台加固方法及风积沙高陡边坡结构 |
CN115492126A (zh) * | 2022-10-26 | 2022-12-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
CN115492126B (zh) * | 2022-10-26 | 2024-07-05 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5980822A (ja) * | 1982-11-01 | 1984-05-10 | Taisei Corp | 山留壁の施工方法 |
CN201883438U (zh) * | 2010-12-23 | 2011-06-29 | 东南大学 | 一种坑中坑钢板桩基坑支护结构 |
CN105133620A (zh) * | 2015-08-19 | 2015-12-09 | 中国建筑第八工程局有限公司 | 局部流塑状淤泥质土体坑中坑支护结构及其施工方法 |
-
2018
- 2018-11-13 CN CN201811346325.XA patent/CN109267575A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5980822A (ja) * | 1982-11-01 | 1984-05-10 | Taisei Corp | 山留壁の施工方法 |
CN201883438U (zh) * | 2010-12-23 | 2011-06-29 | 东南大学 | 一种坑中坑钢板桩基坑支护结构 |
CN105133620A (zh) * | 2015-08-19 | 2015-12-09 | 中国建筑第八工程局有限公司 | 局部流塑状淤泥质土体坑中坑支护结构及其施工方法 |
Non-Patent Citations (1)
Title |
---|
龙正兴: "《综合性市政工程施工组织设计》", 31 August 2010, 同济大学出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158649A (zh) * | 2019-06-05 | 2019-08-23 | 浙江交工集团股份有限公司 | 一种沉井下沉施工时邻近地下管线的施工方法 |
CN113174956A (zh) * | 2021-04-29 | 2021-07-27 | 中交路桥建设有限公司 | 风积沙高陡边坡施工平台加固方法及风积沙高陡边坡结构 |
CN115492126A (zh) * | 2022-10-26 | 2022-12-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
CN115492126B (zh) * | 2022-10-26 | 2024-07-05 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102094425B (zh) | 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法 | |
CN103031839B (zh) | 人工挖孔桩施工方法 | |
JP5282541B2 (ja) | 覆工体の浮き上がり防止方法 | |
CN109440778A (zh) | 主动式双向倾斜排桩基坑支护方法 | |
CN107514006A (zh) | 一种用于浅海或浅河桥梁基础的筑岛作业施工方法 | |
CN111560962A (zh) | 一种回填区基坑支护结构及其施工方法 | |
CN211200426U (zh) | 一种微型钢管桩挡墙抗滑支挡结构 | |
CN109667273A (zh) | 一种深基坑支护结构的施工方法 | |
CN109267575A (zh) | 软土区坑中坑基坑支护的施工方法 | |
CN104131566B (zh) | 一种地下室无水平支撑基坑的施工方法 | |
CN109868826B (zh) | 一种结构牢固的基坑及其土方开挖方法 | |
CN107740419A (zh) | 基坑支护方法及倾斜桩 | |
CN104153355B (zh) | 混凝土桩的施工装置及其施工方法 | |
CN109440781A (zh) | 主动式倾斜双排桩基坑支护方法 | |
CN201598650U (zh) | 古建筑松散毛石基础托换加固装置 | |
CN108842788A (zh) | 劲芯水泥土搅拌桩施工方法 | |
CN101818495A (zh) | 一种基坑支护的施工方法及其支护结构 | |
CN107620309A (zh) | 基坑支护方法 | |
CN107574825A (zh) | 基坑支护方法及倾斜桩 | |
CN107366290A (zh) | 基坑支护方法及倾斜桩 | |
KR20180062669A (ko) | 내진 및 지반강화용 마이크로파일 성형방법 및 상기 방법에 의하여 시공된 내진 및 지반강화용 마이크로파일 | |
JP4911242B2 (ja) | 既設重力式岸壁の改修補強構造 | |
CN209620033U (zh) | 主动式双向倾斜排桩基坑支护结构 | |
JP2004218378A (ja) | 既設杭の撤去方法 | |
CN109440779A (zh) | 主动式x形双排桩基坑支护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190125 |
|
RJ01 | Rejection of invention patent application after publication |