CN202031321U - 一种混凝土电缆沟压顶模板 - Google Patents

一种混凝土电缆沟压顶模板 Download PDF

Info

Publication number
CN202031321U
CN202031321U CN2011200785935U CN201120078593U CN202031321U CN 202031321 U CN202031321 U CN 202031321U CN 2011200785935 U CN2011200785935 U CN 2011200785935U CN 201120078593 U CN201120078593 U CN 201120078593U CN 202031321 U CN202031321 U CN 202031321U
Authority
CN
China
Prior art keywords
concrete
cable trench
formwork
mirror
formworks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200785935U
Other languages
English (en)
Inventor
魏翔
何恩家
曾光昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGHAI ELECTRIC POWER CO Ltd
Qinghai Transmission And Distribution Engineering Co Ltd
State Grid Corp of China SGCC
Original Assignee
Qinghai Transmission And Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Transmission And Distribution Engineering Co Ltd filed Critical Qinghai Transmission And Distribution Engineering Co Ltd
Priority to CN2011200785935U priority Critical patent/CN202031321U/zh
Application granted granted Critical
Publication of CN202031321U publication Critical patent/CN202031321U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

本实用新型属于一种混凝土电缆沟压顶模板,其特征是:该混凝土电缆沟压顶模板是由外层三道横向支撑板,依次在贴近混凝土面层是镜面模板、底部与混凝土接触面用双面胶带密封,纵向每隔50cm安装有一道纵向支撑背方,纵向支撑背方长度50cm,并用蝶形螺栓式扣件卡固定,在距离模板顶部1cm处固定有起倒角及顶标高限位作用的定型弧形PVC型材所构成。本实用新型的有益效果:采用本实用新型的混凝土电缆沟压顶模板施工,成型的电缆沟压顶内实外光,色泽一致,线条顺治,圆角圆滑,美观整齐,表面平整无裂纹等观感效果好,也减少了维护处理的费用。可广泛适用于混凝土施工工程。

Description

一种混凝土电缆沟压顶模板
技术领域
本实用新型属于变电站混凝土电缆沟压顶模板。
背景技术
随着电力建设土建施工技术的不断发展,施工工艺水平的不断提升,对混凝土电缆沟压顶施工的感观质量有了更严格的要求。一、常规方法:以往变电站电缆沟露出地面部分的混凝土压顶与电缆沟沟壁均为一次性浇筑,由于混凝土在浇筑振捣时混凝土沟壁顶部为最薄弱环节,且外观工艺不美观。二、存在问题:在变电站投运后,由于运行检修需要需对电缆沟盖板掀动,对电缆沟压顶棱角磕碰严重,即而对损坏的电缆沟压顶进行修补,这样即对人工也对材料造成极大的浪费,而且对造成破坏的电缆沟压顶进行修补后混凝土易产生色差,很大程度影响整个电缆沟的感观效果。
实用新型内容   
本实用新型目的在于为了解决上述变电站内混凝土电缆沟压顶外观质量效果差,解决对电缆沟压顶破坏后修补的损失问题;将其原有混凝土电缆沟压顶做圆弧倒角工艺,为此设计了一种混凝土电缆沟压顶模板,从而达到使混凝土电缆沟压顶美观整齐。
本实用新型为实现上述目的而采用以下的技术方案: 
本实用新型的一种混凝土电缆沟压顶模板,其特征是:该混凝土电缆沟压顶模板是由外层三道横向支撑板,依次在贴近混凝土面层是镜面模板、底部与混凝土接触面用双面胶带密封,纵向每隔50cm安装有一道纵向支撑背方,纵向支撑背方长度50cm,并用蝶形螺栓式扣件卡固定,在距离模板顶部1cm处固定有起倒角及顶标高限位作用的定型弧形PVC型材所构成。
本实用新型的有益效果:采用本实用新型的混凝土电缆沟压顶模板施工,成型的电缆沟压顶内实外光,色泽一致,线条顺治,圆角圆滑,美观整齐,表面平整无裂纹等观感效果好,也减少了维护处理的费用。
附图说明
以下结合附图和具体实施方式对本实用新型作进一步详细说明。
图1是混凝土电缆沟压顶模板主视结构示意图;
图2是混凝土电缆沟压顶模板安装在电缆沟的剖视结构示意图;
图3是混凝土电缆沟压顶模板的俯视结构示意图。
具体实施方式
参照附图1-3所示,其中:1是横向支撑板、2是镜面模板、3是双面胶带、4是纵向支撑背方、5是蝶形螺栓式扣件卡、6是定型弧形PVC型材、7是第一次浇筑混凝土沟壁。
本实用新型的一种混凝土电缆沟压顶模板,该混凝土电缆沟压顶模板是由外层三道横向支撑板1,依次在贴近混凝土面层是镜面模板2、底部与混凝土接触面用双面胶带3密封,纵向每隔50cm安装有一道纵向支撑背方4,纵向支撑背方4长度50cm,并用蝶形螺栓式扣件卡5固定,模板顶部用定型弧形PVC型材6距离模板顶部1cm处固定,起倒角及顶标高限位作用。
实施例1参照附图1、图2所示,
具体实施例操作
    采用本实用新型的混凝土电缆沟压顶模板实施流程:
一、电缆沟本体-0.18m以下部分第一次浇筑完毕后,用磨子将其表面平整压光,进行养护,待混凝土强度达到100%时进行电缆沟压顶的施工。
二、将其第一次浇注混凝土表面打磨平整。
三、第一次浇筑时电缆沟长方向-0.23m处每隔50cm留置2cm的PVC管,电缆沟压顶模板安装时采用蝶形螺栓式扣件卡5牢固连接,镜面模板2与第一次浇注混凝土沟壁7外侧贴一道3mm厚的双面胶带3,应拼缝严密,禁止漏浆。
四、混凝土表面与模板放置一道弧度为4cm的PVC线条,每隔20m设置一道伸缩缝,伸缩缝处的侧面与顶面分别放置背靠背PVC线条,紧贴于伸缩板上。
五、按试验配合比拌制好C20混凝土,采用小振动棒将其新浇筑混凝土振捣密实,表面用磨子提原浆压光抹面,至少三遍成活,然后进行养护14天后方可拆除模板。
有益效果:
  青海省日月山750kV变电站工程所有电缆沟压顶全部采用本实用新型的混凝土电缆沟压顶模板施工,成型的电缆沟压顶内实外光,色泽一致,线条顺治,圆角圆滑,美观整齐,表面平整无裂纹等观感效果好,并且在投运后运行检修人员在对电缆沟内电缆检修时,对盖板进行了多次掀动,由于本实用新型对压顶进行圆角倒角,所以对电缆沟压顶没有造成破坏,即而也没有发生对其修补的费用。

Claims (1)

1.一种混凝土电缆沟压顶模板,其特征是:该混凝土电缆沟压顶模板是由外层三道横向支撑板(1),依次在贴近混凝土面层是镜面模板(2)、底部与混凝土接触面用双面胶带(3)密封,纵向每隔50cm安装有一道纵向支撑背方(4),纵向支撑背方(4)长度50cm,并用蝶形螺栓式扣件卡(5)固定,在距离模板顶部1cm处固定有起倒角及顶标高限位作用的定型弧形PVC型材(6)所构成。
CN2011200785935U 2011-03-23 2011-03-23 一种混凝土电缆沟压顶模板 Expired - Lifetime CN202031321U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200785935U CN202031321U (zh) 2011-03-23 2011-03-23 一种混凝土电缆沟压顶模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200785935U CN202031321U (zh) 2011-03-23 2011-03-23 一种混凝土电缆沟压顶模板

Publications (1)

Publication Number Publication Date
CN202031321U true CN202031321U (zh) 2011-11-09

Family

ID=44893623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200785935U Expired - Lifetime CN202031321U (zh) 2011-03-23 2011-03-23 一种混凝土电缆沟压顶模板

Country Status (1)

Country Link
CN (1) CN202031321U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852006A (zh) * 2020-07-30 2020-10-30 北京楚海力建筑装饰工程有限公司 一种快速施工窗台压顶结构及施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852006A (zh) * 2020-07-30 2020-10-30 北京楚海力建筑装饰工程有限公司 一种快速施工窗台压顶结构及施工方法

Similar Documents

Publication Publication Date Title
CN205804083U (zh) 一种装配式钢板临时路面结构
CN203546762U (zh) 三道防水的后浇带超前止水结构
CN205604290U (zh) 一种外翻框架消能式地下综合管廊结构
CN204982970U (zh) 一种底板钢边橡胶止水带固定模具
CN206053328U (zh) 一种中埋式止水带固定装置
CN202031321U (zh) 一种混凝土电缆沟压顶模板
CN110644538A (zh) 地下室侧墙超前后浇带外围保护结构
CN202689047U (zh) 用于沉管预制管段内施工缝处的防水结构
CN201330400Y (zh) 搭接式组合钢板围堰
CN108894490B (zh) 封边装置及其用于装配式结构叠合层混凝土施工的方法
CN204645616U (zh) 侧墙钢边橡胶止水带固定模具
CN205604289U (zh) 一种能够抵抗大变形的单仓地下管廊
CN207475147U (zh) 一种公路隧道半装配式电缆沟
CN207904688U (zh) 一种预制式光伏道路组块
CN206070804U (zh) 一种短肢剪力墙结构
CN205775637U (zh) 一种预制地铁拼装轨道板
CN203866851U (zh) 多功能沉箱起浮模板
CN210975900U (zh) 地下室侧墙超前后浇带外围保护结构
CN206859660U (zh) 一种预留洞口的梁柱模板体系
CN103924694B (zh) 一种防水性混凝土伸缩缝的补漏处理方法
CN207392235U (zh) 城市地下综合管廊中圆管涵的施工模板
CN205206054U (zh) 地下室底板后浇带加厚防渗止水结构
CN207295749U (zh) 可周转可伸缩集水坑安全防护盖
CN201943050U (zh) 钢结构夹层钢板坝的趾板连接结构
CN205713449U (zh) 一种快速堆垛可拆卸式围墙

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QINGHAI ELECTRIC POWER CORPORATION QINGHAI POWER T

Effective date: 20130801

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: QINGHAI POWER TRANSMISSION + TRANSFORMATION ENGINEERING COMPANY

Effective date: 20130801

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 810001 XINING, QINGHAI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130801

Address after: 100031 Xicheng District, Beijing, West Chang'an Avenue, No., No. 86

Patentee after: State Grid Corporation of China

Patentee after: Qinghai Electric Power Co., Ltd.

Patentee after: Qinghai Transmission and Distribution Engineering Co., Ltd.

Address before: 810001 No. 25 Xiguan Street, Xining, Qinghai

Patentee before: Qinghai Transmission and Distribution Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111109