CN202030998U - Rail lifting sleeper-changing machine - Google Patents

Rail lifting sleeper-changing machine Download PDF

Info

Publication number
CN202030998U
CN202030998U CN 201120132587 CN201120132587U CN202030998U CN 202030998 U CN202030998 U CN 202030998U CN 201120132587 CN201120132587 CN 201120132587 CN 201120132587 U CN201120132587 U CN 201120132587U CN 202030998 U CN202030998 U CN 202030998U
Authority
CN
China
Prior art keywords
rail
cylinder
arm
sleeper
rail lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120132587
Other languages
Chinese (zh)
Inventor
于向军
王德武
孙中朝
南栋祥
胡季
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University
Original Assignee
Kunming University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University filed Critical Kunming University
Priority to CN 201120132587 priority Critical patent/CN202030998U/en
Application granted granted Critical
Publication of CN202030998U publication Critical patent/CN202030998U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a rail lifting sleeper-changing machine consisting of a rail car, an electric generator, an operation control box and a rail lifting sleeper-changing mechanism; the rail car can travel on a rail by means of human power; the electric generator, the operation control box and the rail lifting sleeper-changing mechanism are arranged on the rail car; the electric generator supplies power for an oil pump; the rail lifting sleeper-changing mechanism is formed by two rail lifting oil cylinders, a fixed arm, a movable arm, a cantilever, an inserted pin with a ring, and a boosting plate; the bottoms of cylinder bodies of the two rail lifting oil cylinders are symmetrically hinged at the left end and the right end above the fixed arm; the movable arm is arranged in the fixed arm; the bottom of the cylinder body of a driving oil cylinder arranged in the cavity of the fixed arm is hinged at the right end of the fixed arm; a piston rod of the driving oil cylinder is hinged at the movable arm; the outer end of the movable arm is hinged with the cantilever; the cantilever and the movable arm are integrally fixed by the inserted pin with the ring; the outer ends of piston rods of the two rail lifting oil cylinders are fixedly connected with supporting plates; and the upper parts of the cylinder bodies of the two rail lifting oil cylinders are hinged with the boosting plate. The rail lifting sleeper-changing machine can quickly change the sleeper, and is time-saving and labor-saving, reliable in performance and high in mechanical construction rate.

Description

Carry rail and change the pillow machine
Technical field
The utility model relates to a kind of railway machinery, and particularly a kind of rail of carrying changes the pillow machine.
Background technology
Railroad sleeper is in long use, reason owing to natural subsidence and vibration, the local sleeper of railway sinks, and needs to be serviced, and indivedual sleepers damage, need in time to change, in the process of carrying out sleeper replacement, all be manually with the hydraulic jack jack-up rail pillow that switches tracks in the past, waste time and energy, efficient is low, can not (be commonly called as: finish the work the skylight) in effective train passage gap.
The utility model content
The purpose of this utility model provides a kind of rail of carrying and changes the pillow machine, uses this to carry rail and changes the pillow machine and can change sleeper apace, and is time saving and energy saving, high efficiency.
The utility model is by railcar, generator, operation control box (in fuel tank is housed, oil pump and various control valve) and carry rail and change pillow mechanism composition, four pin of railcar are equipped with castor, railcar can be advanced in orbit by manpower, generator and control operation case are arranged on the railcar, generator provides power for oil pump, carrying rail changes pillow mechanism crosswise fixed and is arranged on the railcar, carry rail change the pillow mechanism carry cylinder of rail by two, decide arm, swing arm, cantilever, band latch and gusset constitute, the two cylinder base symmetries of carrying cylinder of rail are hinged on the left and right end portions of deciding above the arm, swing arm is located to be decided in the arm, place the driving oil cylinder cylinder base of swing arm inner chamber to be articulated in and decide the arm right part, driving oil cylinder piston rod outer end is articulated in the left part of swing arm, the outer end articulating boom of swing arm, the band latch is fixed as one cantilever and swing arm, the two piston rod outer ends of carrying cylinder of rail are fixed with fagging, and the two cylinder body upper articulations of carrying cylinder of rail have gusset.
The beneficial effects of the utility model are: carry rail and send pillow mechanism can change sleeper apace, the utility model is easy to operate, time saving and energy saving, dependable performance, mechanized rate height, and it is simple in structure, can fully, rationally utilize limited circuit to repair " skylight " activity duration, finish the replacing of sleeper.
Description of drawings
Fig. 1 is schematic perspective view and the working state schematic representation of the utility model embodiment.
Schematic side view when Fig. 2 is the utility model embodiment duty.
Master when Fig. 3 is the utility model embodiment duty looks schematic diagram.
The schematic perspective view of Fig. 4 during for the carrying rail and send pillow mechanism duty of the utility model embodiment.
The front view of Fig. 5 during for the carrying rail and send pillow mechanism duty of the utility model embodiment.
Fig. 6 send the not schematic perspective view during duty of pillow mechanism for the rail of carrying of the utility model embodiment.
Fig. 7 is the not schematic top plan view during duty of the utility model embodiment.
The specific embodiment
See also Fig. 1 to shown in Figure 7, be embodiment of the present utility model, this embodiment is by railcar 1, generator 2, operation control box 3 (in fuel tank is housed, oil pump and various control valve) and carry rail and change pillow mechanism 9 compositions, four pin of railcar 1 are equipped with castor 11, railcar 1 by castor 11 in orbit manpower promote to advance, generator 2 and control operation case 3 are arranged on the railcar 1, generator 2 provides power for oil pump, carrying rail changes pillow mechanism 9 crosswise fixed and is arranged on the railcar 1, carry rail change the pillow mechanism 9 carry cylinder of rail 91 by two, decide arm 92, swing arm 93, cantilever 94, band latch 95 and gusset 96 constitute, the two cylinder base symmetries of carrying cylinder of rail 91 are hinged on the left and right end portions of deciding above the arm 92, swing arm 93 is located to be decided in the arm 92, place the driving oil cylinder cylinder base of swing arm 93 inner chambers to be articulated in and decide arm 92 right parts, driving oil cylinder piston rod outer end is articulated in the left part of swing arm 93, the outer end articulating boom 94 of swing arm 93, band latch 95 is fixed as one cantilever 94 and swing arm 93, the two piston rod outer ends of carrying cylinder of rail 91 are fixed with fagging 98, two and carry the cylinder body upper articulation of cylinder of rail 91 gusset 96 is arranged.
Present embodiment the course of work and principle as follows:
Promoting railcar 1 by manpower moves in orbit and decides arm 92 and be positioned at sleeper to be replaced top; Generator 2 provides power supply for oil pump, oil pump provides hydraulic oil, as shown in Figure 6 and Figure 7, carrying rail, to change pillow mechanism 9 are duties not, as Fig. 1, Fig. 2, Fig. 3, Fig. 4 and shown in Figure 5, carry rail change the pillow mechanism 9 are duties, change pillow mechanism 9 and decide two on the arm 92 and carry cylinder of rail 91 and overturn 180 ° carrying rail, change 90 ° with being articulated in the gusset 96 of carrying cylinder of rail 91 cylinder bodies to rail 4 lower wing plates, gusset 96 upper surfaces are contacted with the soffit of rail 4 lower wing plates, carrying cylinder of rail 91 piston rods stretches out, fagging 98 is pressed in to make on the roadbed carries cylinder of rail 91 cylinder bodies and gusset 96 rises synchronously, rail is carried in realization, manually sleeper is rotated 90 °, and band latch 95 is extracted, carry rail and change cantilever 94 Rotate 180s ° on pillow mechanism 9 swing arms, 93 free ends being articulated in, band latch 95 is plugged, and swing arm 93 and sleeper 5 are connected, carry rail and change and rest the head on mechanism's 9 swing arms 93 and under the promotion of driving oil cylinder, stretch out bad sleeper 5 is pulled out with rope 97; Carry rail and change pillow mechanism 9 swing arms 93 and under the pulling of driving oil cylinder, bounce back, with its with wait to renew sleeper 5 usefulness ropes 97 and connect good and draw in the roadbed, manually sleeper 5 90 ° of rotations are switched tracks and finish.

Claims (1)

1. carry rail and change the pillow machine for one kind, it is characterized in that: be by railcar (1), generator (2), operation control box (3) and carry rail and change pillow mechanism (9) and form, four pin of railcar (1) are equipped with castor (11), railcar (1) can be advanced in orbit by manpower, generator (2) and control operation case (3) are arranged on the railcar (1), generator (2) provides power for oil pump, carry rail change the pillow mechanism (9) be horizontally installed on the railcar (1), carry rail change the pillow mechanism (9) be to carry cylinder of rail (91) by two, decide arm (92), swing arm (93), cantilever (94), band latch (95) and gusset (96) constitute, the two cylinder base symmetries of carrying cylinder of rail (91) are hinged on the left and right end portions of deciding above the arm (92), swing arm (93) is located to be decided in the arm (92), place the driving oil cylinder cylinder base of swing arm (93) inner chamber to be articulated in and decide arm (92) right part, driving oil cylinder piston rod outer end is articulated in the left part of swing arm (93), the outer end articulating boom (94) of swing arm (93), band latch (95) is fixed as one cantilever (94) and swing arm (93), the two piston rod outer ends of carrying cylinder of rail (91) are fixed with fagging (98), and the two cylinder body upper articulations of carrying cylinder of rail (91) have gusset (96).
CN 201120132587 2011-04-29 2011-04-29 Rail lifting sleeper-changing machine Expired - Fee Related CN202030998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120132587 CN202030998U (en) 2011-04-29 2011-04-29 Rail lifting sleeper-changing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120132587 CN202030998U (en) 2011-04-29 2011-04-29 Rail lifting sleeper-changing machine

Publications (1)

Publication Number Publication Date
CN202030998U true CN202030998U (en) 2011-11-09

Family

ID=44893301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120132587 Expired - Fee Related CN202030998U (en) 2011-04-29 2011-04-29 Rail lifting sleeper-changing machine

Country Status (1)

Country Link
CN (1) CN202030998U (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669133A (en) * 2013-12-11 2014-03-26 上海瑞纽机械装备制造有限公司 Hydraulic sleeper replacement machine and hydraulic sleeper replacement method
CN104099837A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing sleeper replacing method
CN104099836A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing device
CN104164808A (en) * 2014-09-04 2014-11-26 昆明学院 Sleeper replacing device
CN104164807A (en) * 2014-09-04 2014-11-26 昆明学院 Rail lifting sleeper changing machine
CN104179095A (en) * 2014-09-04 2014-12-03 昆明学院 Mechanization sleeper replacement device
CN104179094A (en) * 2014-09-04 2014-12-03 昆明学院 Fully-mechanized quick sleeper-changing machine
CN104195898A (en) * 2014-09-04 2014-12-10 昆明学院 Rail lifting and quick sleeper-replacing machine
CN104195896A (en) * 2014-09-04 2014-12-10 昆明学院 Vibrating and rotary excavating stone discharging device between sleepers
CN104195894A (en) * 2014-09-04 2014-12-10 昆明学院 Vibration rotary excavating type quick stone removing machine used between sleepers
CN104195904A (en) * 2014-09-04 2014-12-10 昆明学院 Mechanical sleeper replacing machine
CN104195903A (en) * 2014-09-04 2014-12-10 昆明学院 Sleeper hoisting device
CN106283993A (en) * 2016-10-11 2017-01-04 昆明学院 One has the replacing sleeper machinery of telescoping crossbeam device
CN106283976A (en) * 2016-08-31 2017-01-04 淮阴工学院 A kind of mechanical-electrical-hydraulic integration fast quick change pillow device
CN106283992A (en) * 2016-08-31 2017-01-04 淮阴工学院 One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device
CN106320109A (en) * 2016-11-05 2017-01-11 昆明学院 Mechanical-electronic-hydraulic integrated sleeper changing device
CN106337332A (en) * 2016-08-31 2017-01-18 昆明学院 Sleeper replacing machine with reciprocating movement device
CN106351091A (en) * 2016-10-11 2017-01-25 昆明学院 Sleeper changing machine provided with transversely-moving grab bucket stone-clearing device
CN107178015A (en) * 2017-07-06 2017-09-19 中铁上海工程局集团有限公司 A kind of long sleeper replacement constructing device of girder steel open bridge floors synthetic resin and method

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099837A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing sleeper replacing method
CN104099836A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing device
CN104099836B (en) * 2013-04-15 2016-05-11 昆明中铁大型养路机械集团有限公司 A kind of side turn over list pillow replacing device
CN104099837B (en) * 2013-04-15 2016-01-20 昆明中铁大型养路机械集团有限公司 A kind of side turn over list pillow is substituted and is changed pillow method
CN103669133A (en) * 2013-12-11 2014-03-26 上海瑞纽机械装备制造有限公司 Hydraulic sleeper replacement machine and hydraulic sleeper replacement method
CN103669133B (en) * 2013-12-11 2016-01-20 上海瑞纽机械股份有限公司 Hydraulic pressure sleeper relaying machine and replacing options thereof
CN104195898A (en) * 2014-09-04 2014-12-10 昆明学院 Rail lifting and quick sleeper-replacing machine
CN104195894B (en) * 2014-09-04 2016-02-10 昆明学院 Between a kind of sleeper, vibration is revolved and is dug quick lithagoue machine
CN104195896A (en) * 2014-09-04 2014-12-10 昆明学院 Vibrating and rotary excavating stone discharging device between sleepers
CN104195894A (en) * 2014-09-04 2014-12-10 昆明学院 Vibration rotary excavating type quick stone removing machine used between sleepers
CN104195904A (en) * 2014-09-04 2014-12-10 昆明学院 Mechanical sleeper replacing machine
CN104195903A (en) * 2014-09-04 2014-12-10 昆明学院 Sleeper hoisting device
CN104179094B (en) * 2014-09-04 2015-11-18 昆明学院 A kind of Fully-mechanized quick swivel block machine
CN104179095B (en) * 2014-09-04 2015-11-18 昆明学院 A kind of mechanization sleeper relaying machine
CN104179095A (en) * 2014-09-04 2014-12-03 昆明学院 Mechanization sleeper replacement device
CN104164807A (en) * 2014-09-04 2014-11-26 昆明学院 Rail lifting sleeper changing machine
CN104195904B (en) * 2014-09-04 2016-02-10 昆明学院 Pillow machine is changed in a kind of mechanization
CN104179094A (en) * 2014-09-04 2014-12-03 昆明学院 Fully-mechanized quick sleeper-changing machine
CN104195896B (en) * 2014-09-04 2016-04-06 昆明学院 Between a kind of sleeper, the row's of digging stone device is revolved in vibration
CN104164808A (en) * 2014-09-04 2014-11-26 昆明学院 Sleeper replacing device
CN104164808B (en) * 2014-09-04 2016-05-25 昆明学院 A kind of sleeper device of changing
CN104195903B (en) * 2014-09-04 2016-09-14 昆明学院 A kind of sleeper handling apparatus
CN104195898B (en) * 2014-09-04 2017-01-18 昆明学院 Rail lifting and quick sleeper-replacing machine
CN106283976A (en) * 2016-08-31 2017-01-04 淮阴工学院 A kind of mechanical-electrical-hydraulic integration fast quick change pillow device
CN106283992A (en) * 2016-08-31 2017-01-04 淮阴工学院 One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device
CN106337332A (en) * 2016-08-31 2017-01-18 昆明学院 Sleeper replacing machine with reciprocating movement device
CN106283993A (en) * 2016-10-11 2017-01-04 昆明学院 One has the replacing sleeper machinery of telescoping crossbeam device
CN106351091A (en) * 2016-10-11 2017-01-25 昆明学院 Sleeper changing machine provided with transversely-moving grab bucket stone-clearing device
CN106320109A (en) * 2016-11-05 2017-01-11 昆明学院 Mechanical-electronic-hydraulic integrated sleeper changing device
CN107178015A (en) * 2017-07-06 2017-09-19 中铁上海工程局集团有限公司 A kind of long sleeper replacement constructing device of girder steel open bridge floors synthetic resin and method

Similar Documents

Publication Publication Date Title
CN202030998U (en) Rail lifting sleeper-changing machine
CN202081354U (en) Quick sleeper replacer
CN202030996U (en) Grab bucket stone remover among rail bearings
CN202030995U (en) Swivel-driven stone removing machine between rail bearings
CN102261024B (en) Sleeper rapid replacing machine
CN102277800A (en) Inter-sleep grab bucket stone remover
CN102277801A (en) Rotary drilling stone-discharging machine between sleepers
CN202766937U (en) Railway sleeper replacement device
CN107190665A (en) A kind of municipal works notice board
CN208272486U (en) A kind of electric power overhaul robot vehicle
CN206997824U (en) A kind of railway maintenance rail steel rig
CN108086072A (en) A kind of railroad ties bolt curing means
CN102011350B (en) Hydraulic tamping machine
CN202643145U (en) Hydraulic turn-over portal crane
CN209941453U (en) Novel road concrete compaction strickle device
CN201351083Y (en) Generator stator lifting device
CN201354299Y (en) Movable electric double-box hanger
CN205474631U (en) Switch tamping tool
CN202519547U (en) Wheel-rail type high-speed railway plate-type ballastless track mortar layer removing machine
CN202685067U (en) Hydraulic integral T beam formwork for overloaded railway
CN210457327U (en) Electric vehicle maintenance platform
CN201857559U (en) Hydraulic tamping machine
CN201077940Y (en) Harrow ballast device and railway harrow ballast vehicle
CN204162960U (en) One carries rail swivel block machine
CN204875395U (en) Receive pillow device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20130429