CN202000316U - 导流洞下闸封堵的临时结构 - Google Patents
导流洞下闸封堵的临时结构 Download PDFInfo
- Publication number
- CN202000316U CN202000316U CN2011200788793U CN201120078879U CN202000316U CN 202000316 U CN202000316 U CN 202000316U CN 2011200788793 U CN2011200788793 U CN 2011200788793U CN 201120078879 U CN201120078879 U CN 201120078879U CN 202000316 U CN202000316 U CN 202000316U
- Authority
- CN
- China
- Prior art keywords
- diversion tunnel
- horizontal
- temporary structure
- gate
- lock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
一种导流洞下闸封堵的临时结构,闸门通过临时锁定装置安装在导流洞上方的格构柱内。所述的格构柱中,多根立柱与预埋件连接,各立柱之间通过剪刀撑和水平撑连接,剪刀撑上设有连接板,立柱顶部设有纵横交错的多层水平分配梁,手动胡芦安装在最顶层的水平分配梁上。本实用新型提供的一种导流洞下闸封堵的临时结构,通过采用上述的结构,大大降低了施工难度;减小了一次性临时工作量;避免了上下相关作业的干扰。从而降低了施工成本。
Description
技术领域
本实用新型涉及水工导流建筑物的施工领域,特别是一种导流洞下闸封堵的临时结构。
背景技术
现行的水工导流洞下闸封堵的方式通常是:已浇筑好的导流洞口正上方浇筑20米以上混凝土的框格结构,在其上浇筑起闭机平台,安装2台起闭机,同时在高于下闸封堵时的导流水位以上修建临时下闸道路与起闭机平台相连,来完成导流洞下闸封堵作业。传统方法有难以克服的缺点。一次性临时道路、一次性混凝土的框格柱、一次性起闭机平台工程量大、施工难度大,既费工、费时,性价比低、施工时间长,不能满足现代工程的要求。
发明内容
本实用新型所要解决的技术问题是提供一种导流洞下闸封堵的临时结构,可以降低施工难度和施工成本。
为解决上述技术问题,本实用新型所采用的技术方案是:一种导流洞下闸封堵的临时结构,闸门通过锁定装置安装在导流洞上方的格构柱内。
所述的格构柱中,多根立柱与预埋件连接,各立柱之间通过剪刀撑和水平撑连接,剪刀撑上设有连接板,立柱顶部设有纵横交错的多层水平分配梁。
手动胡芦安装在最顶层的水平分配梁上。
所述的立柱顶部的水平分配梁为4层。
所述锁定装置为水平锁定装置和垂直锁定装置。
本实用新型提供的一种导流洞下闸封堵的临时结构,通过采用上述的结构,大大降低了施工难度;减小了一次性临时工作量;避免了上下相关作业的干扰,从而降低了施工成本。
附图说明
下面结合附图和实施例对本实用新型作进一步说明。
图1是本实用新型的主视图。
图2是本实用新型的侧视图。
具体实施方式
如图1、图2中,一种导流洞下闸封堵的临时结构,闸门9通过锁定装置8安装在导流洞10上方的格构柱内。
所述的格构柱中,多根立柱2与预埋件1连接,各立柱2之间通过剪刀撑3和水平撑11连接,剪刀撑3上设有连接板4,立柱2顶部设有纵横交错的多层水平分配梁6,优化的方案是所述的立柱2顶部的水平分配梁6为4层。手动胡芦7安装在最顶层的水平分配梁6上。
所述锁定装置8为水平锁定装置和垂直锁定装置。
具体的施工步骤如下:首先在浇筑导流洞10洞口的混凝土时,埋设预埋件1(由钢板和一定埋深的钢筋组成)。
导流洞口混凝土达到满足要求强度后,将立柱2(用钢管和其他型材制成)运至现场。根据图纸的要求进行格构柱的施工放样,首先立柱2与预埋件1焊接;再安装剪刀撑3和水平撑11,剪刀撑3与立柱1通过连接板4与立柱2焊接,立柱2顶部焊接立柱顶部钢板5。
在立柱2上设不少于二根第一层横向的水平分配梁6;在横向的水平分配梁6上安装不少4根的第二层纵向的水平分配梁6;在混凝土平台上闸口两侧,均安装水平锁定装置(即顺水流向的纵向水平锁定梁)。此时利用吊车将分块闸门9的第一块吊入,在第一块闸门靠上部位置锁定在纵向水平锁定梁上。在吊入第二块闸门与第一块闸门组装,将组装好的第一、第二块闸门吊起。解出锁定,下放到合适位置,在第二块闸门靠上部位置在次锁定在纵向水平锁定梁上。吊入第三块闸门组装,重复上述步骤。直到组装完成后闸门9。
然后在纵向的水平分配梁6上设不少二根第三层横向的水平分配梁6;在横向的水平分配梁6上设第四层二根纵向的水平分配梁6,完成水平分配梁6的现场安装。
在最上一层纵向分配梁上安装不少于二个手动胡芦7,通过钢丝绳连接水平分配梁6与闸门9。手动胡芦7同步工作受力,解除锁定,将整个闸门吊起。在闸门底部与导流洞顶部平齐时,在将整个闸门锁定在纵向水平锁定梁上,同时安装垂直锁定装置(由钢丝绳、钢丝绳卡扣组成),松开手动胡芦7,闸门9处于临时锁定工况。
具备下闸封堵条件后,在最上一层水平分配梁6上重新安装手动胡芦7,通过钢丝绳连接水平分配梁6与闸门9。不少于二个手动胡芦7同时工作受力,解除所有的锁定装置8,闸门处于下闸工况。可以进行导流洞下闸封堵的作业。
封堵闸门下闸到位后,在充分保证人员、设备的安全条件下,立即组织人员拆除手动胡芦7,从上至下拆除格构柱(也可不拆除)。
本实用新型经测试,解决了现有导流洞下闸封堵的技术难题,具有结构简单合理,操作方便,成本低的优点。
Claims (5)
1.一种导流洞下闸封堵的临时结构,其特征在于:闸门(9)通过锁定装置(8)安装在导流洞(10)上方的格构柱内。
2.根据权利要求1所述的一种导流洞下闸封堵的临时结构,其特征在于:所述的格构柱中,多根立柱(2)与预埋件(1)连接,各立柱(2)之间通过剪刀撑(3)和水平撑(11)连接,剪刀撑(3)上设有连接板(4),立柱(2)顶部设有纵横交错的多层水平分配梁(6)。
3.根据权利要求2所述的一种导流洞下闸封堵的临时结构,其特征在于:在最顶层的水平分配梁(6)上安装有手动胡芦(7)。
4.根据权利要求2所述的一种导流洞下闸封堵的临时结构,其特征在于:所述的立柱(2)顶部的水平分配梁(6)为4层。
5.根据权利要求1所述的一种导流洞下闸封堵的临时结构,其特征在于:所述锁定装置(8)为水平锁定装置和垂直锁定装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200788793U CN202000316U (zh) | 2011-03-23 | 2011-03-23 | 导流洞下闸封堵的临时结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200788793U CN202000316U (zh) | 2011-03-23 | 2011-03-23 | 导流洞下闸封堵的临时结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202000316U true CN202000316U (zh) | 2011-10-05 |
Family
ID=44703061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200788793U Expired - Fee Related CN202000316U (zh) | 2011-03-23 | 2011-03-23 | 导流洞下闸封堵的临时结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202000316U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110407078A (zh) * | 2019-07-05 | 2019-11-05 | 河南省水利第二工程局 | 一种多吊点的闸门节段转体吊装施工方法 |
CN111663451A (zh) * | 2020-06-18 | 2020-09-15 | 中铁四局集团有限公司 | 高山峡谷大跨度上承式连续钢桁梁桥的超高塔架施工方法 |
-
2011
- 2011-03-23 CN CN2011200788793U patent/CN202000316U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110407078A (zh) * | 2019-07-05 | 2019-11-05 | 河南省水利第二工程局 | 一种多吊点的闸门节段转体吊装施工方法 |
CN111663451A (zh) * | 2020-06-18 | 2020-09-15 | 中铁四局集团有限公司 | 高山峡谷大跨度上承式连续钢桁梁桥的超高塔架施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652671B (zh) | 预制装配式混凝土外挂墙板固定装置及安装方法 | |
CN203924696U (zh) | 顶模挂架快装体系 | |
CN204343301U (zh) | 一种地铁车站基坑开挖支护结构 | |
CN104790675B (zh) | 一种配筋砌块砌体结构装配化施工方法 | |
CN204385634U (zh) | 铁路不停运跨线箱涵整体顶进装置 | |
CN207944590U (zh) | 一种装配式钢框架-预制型钢混凝土剪力墙结构体系 | |
CN107476561A (zh) | 一种附着式升降脚手架及其施工工法 | |
CN102912991A (zh) | 大型幕墙单元板块轨道吊装装置及方法 | |
CN202000316U (zh) | 导流洞下闸封堵的临时结构 | |
CN103643681B (zh) | 一种地铁车站基坑逆作支护结构及其施工方法 | |
CN106150057B (zh) | 一种分片式液压提升爬架 | |
CN105040810B (zh) | 适用于框支剪力墙结构逆作法施工的连接节点 | |
CN109025259A (zh) | 一种可周转式液压爬模附墙装置 | |
CN206956979U (zh) | 一种带顶柱的一字型剪力墙 | |
CN203160540U (zh) | 一种新型预制柱 | |
CN105347142A (zh) | 一种施工升降机安装在地下室顶板上的穿板安装方法 | |
CN203475310U (zh) | 钢混结合箱梁混凝土翼板模板 | |
CN204311457U (zh) | 一种地铁车站基坑开挖施工用组合式支护体系 | |
CN208563658U (zh) | 一种预制格构组合剪力墙装配单体 | |
CN107268853A (zh) | 一种全螺栓装配式钢骨架轻型板及其制作方法 | |
CN208934394U (zh) | 一种可周转式液压爬模附墙装置 | |
CN203640257U (zh) | 一种悬挑式脚手架的支座 | |
CN204000885U (zh) | 地铁深基坑混凝土支撑吊模模具 | |
CN203499259U (zh) | 工具式悬挑卸料平台 | |
CN214573768U (zh) | 一种门槽二期混凝土浇筑自爬升滑模浇筑系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111005 Termination date: 20160323 |
|
CF01 | Termination of patent right due to non-payment of annual fee |