CN202000261U - 预应力平衡法托架 - Google Patents
预应力平衡法托架 Download PDFInfo
- Publication number
- CN202000261U CN202000261U CN2011200163744U CN201120016374U CN202000261U CN 202000261 U CN202000261 U CN 202000261U CN 2011200163744 U CN2011200163744 U CN 2011200163744U CN 201120016374 U CN201120016374 U CN 201120016374U CN 202000261 U CN202000261 U CN 202000261U
- Authority
- CN
- China
- Prior art keywords
- steel
- embedded
- prestressing force
- channel
- pipe support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
预应力平衡法托架,它涉及特大桥边跨现浇段施工技术领域。它的墩身(1)下端后侧设置在牛腿支架(2)上,墩身(1)前部下端以及后侧下端均设置有钢管支架(4),牛腿支架(2)的设计位置设置有预埋钢件(6),预埋钢件(6)下端与牛腿支架(2)之间倾斜设置有斜撑预埋钢板(5),预埋钢件(6)与墩身(1)前部下端的钢管支架(4)之间设置有横向分配梁(3)。它以预应力为载体,利用预埋在承台中的钢绞线束,实现对托架的预压,有效缩短工期,并且降低成本。
Description
技术领域:
本实用新型涉及特大桥边跨现浇段施工技术领域,具体涉及一种预应力平衡法托架。
背景技术:
高速公路跨越山丘或峡谷时,经常选用高墩连续钢构桥型,按照设计要求,桥梁的施工多采用挂篮悬臂浇筑法,同时考虑设支架或托架浇筑主梁0号梁段,为后继挂篮的拼装及施工提供平台。桥墩较低时,可以采用搭设支架来进行0号梁段的施工,但当桥墩高度大于30m以上高度时,受支架材料的限制,支架承受荷载后的非弹性变形较大,因此常采用各类托架来进行0号梁段的施工。为检验托架在施工工况下的强度、刚度、稳定性,并消除托架的非弹性变形,实测出弹性变形,施工前应对托架进行预压试验。但在高墩大跨度的桥梁中,由于0号梁段重量较大,采用通常的“堆积材料加载法”工作量较大,需另觅他途。
近年来,随着施工工艺不断发展和完善,预应力混凝土的应用范围愈来愈广。除在传统工业与民用建筑的屋架、吊车梁、托架梁、空心楼板、大型屋面板、檩条、挂瓦板等单个构件上广泛应用外,还成功地把预应力技术运用到多层工业厂房、高层建筑、大型桥梁、核电站安全壳、电视塔、大跨度薄壳结构、筒仓、水池、大口径管道、基础岩土工程、海洋工程等技术难度较高的大型整体或特种结构上。当前,预应力混凝土的使用范围和数量,已成为一个国家建筑技术水平的重要标志之一。
实用新型内容:
本实用新型的目的是提供预应力平衡法托架,它以预应力为载体,利用预埋在承台中的钢绞线束,实现对托架的预压,有效缩短工期,并且降低成本。
为了解决背景技术所存在的问题,本实用新型是采用以下技术方案:它包含墩身1、牛腿支架2、横向分配梁3、钢管支架4、斜撑预埋钢板5和预埋钢件6,墩身1下端后侧设置在牛腿支架2上,墩身1前部下端以及后侧下端均设置有钢管支架4,牛腿支架2的设计位置设置有预埋钢件6,预埋钢件6下端与牛腿支架2之间倾斜设置有斜撑预埋钢板5,预埋钢件6与墩身1前部下端的钢管支架4之间设置有横向分配梁3。
所述的横向分配梁3由20槽钢横向布设而成,两根槽钢背靠背一组,间距30cm。
所述的钢管支架4由φ48钢管搭设而成。
所述的斜撑预埋钢板5采用不小于30cm×30cm的2cm厚钢板,并与相应的工字钢、槽钢保证在同一个铅垂面内。
所述的预埋钢件6为36工字钢或20槽钢。
在墩身施工至距墩顶2m时将预埋钢件6(36工字钢或20槽钢)和斜撑预埋钢板5预埋在牛腿支架2设计位置。在横向分配梁3上用φ48钢管搭设支架,底板下钢管支架4纵向间距30cm,横向60cm,腹板下方加密为30cm×30cm,横杆步距55cm;翼缘板及封锚段钢管支架间距采用60cm×60cm,横杆步距80cm。箱梁底板与盖梁之间间距为30cm~41cm,采用横向30cm间距的20槽钢、纵向30cm间距的方木、木楔进行支垫,20槽钢2根背靠背为一组。
本实用新型以预应力为载体,利用预埋在承台中的钢绞线束,实现对托架的预压,有效缩短工期,并且降低成本。
附图说明:
图1为本实用新型的结构示意图,
图2为图1的侧视图。
具体实施方式:
参照图1-2,本具体实施方式采用以下技术方案:它包含墩身1、牛腿支架2、横向分配梁3、钢管支架4、斜撑预埋钢板5和预埋钢件6,墩身1下端后侧设置在牛腿支架2上,墩身1前部下端以及后侧下端均设置有钢管支架4,牛腿支架2的设计位置设置有预埋钢件6,预埋钢件6下端与牛腿支架2之间倾斜设置有斜撑预埋钢板5,预埋钢件6与墩身1前部下端的钢管支架4之间设置有横向分配梁3。
所述的横向分配梁3由20槽钢横向布设而成,两根槽钢背靠背一组,间距30cm。
所述的钢管支架4由φ48钢管搭设而成。
所述的斜撑预埋钢板5采用不小于30cm×30cm的2cm厚钢板,并与相应的工字钢、槽钢保证在同一个铅垂面内。
所述的预埋钢件6为36工字钢或20槽钢。
在墩身施工至距墩顶2m时将预埋钢件6(36工字钢或20槽钢)和斜撑预埋钢板5预埋在牛腿支架2设计位置。在横向分配梁3上用φ48钢管搭设支架,底板下钢管支架4纵向间距30cm,横向60cm,腹板下方加密为30cm×30cm,横杆步距55cm;翼缘板及封锚段钢管支架间距采用60cm×60cm,横杆步距80cm。箱梁底板与盖梁之间间距为30cm~41cm,采用横向30cm间距的20槽钢、纵向30cm间距的方木、木楔进行支垫,20槽钢2根背靠背为一组。
本具体实施方式以预应力为载体,利用预埋在承台中的钢绞线束,实现对托架的预压,有效缩短工期,并且降低成本。
Claims (6)
1.预应力平衡法托架,其特征在于它包含墩身(1)、牛腿支架(2)、横向分配梁(3)、钢管支架(4)、斜撑预埋钢板(5)和预埋钢件(6),墩身(1)下端后侧设置在牛腿支架(2)上,墩身(1)前部下端以及后侧下端均设置有钢管支架(4),牛腿支架(2)的设计位置设置有预埋钢件(6),预埋钢件(6)下端与牛腿支架(2)之间倾斜设置有斜撑预埋钢板(5),预埋钢件(6)与墩身(1)前部下端的钢管支架(4)之间设置有横向分配梁(3)。
2.根据权利要求1所述的预应力平衡法托架,其特征在于所述的横向分配梁(3)由20槽钢横向布设而成,两根槽钢背靠背一组,间距30cm。
3.根据权利要求1所述的预应力平衡法托架,其特征在于所述的钢管支架(4)由φ48钢管搭设而成。
4.根据权利要求1所述的预应力平衡法托架,其特征在于所述的斜撑预埋钢板(5)采用不小于30cm×30cm的2cm厚钢板,并与相应的工字钢、槽钢保证在同一个铅垂面内。
5.根据权利要求1所述的预应力平衡法托架,其特征在于所述的预埋钢件(6)为36工字钢。
6.根据权利要求1所述的预应力平衡法托架,其特征在于所述的预埋钢件(6)为20槽钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200163744U CN202000261U (zh) | 2011-01-19 | 2011-01-19 | 预应力平衡法托架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200163744U CN202000261U (zh) | 2011-01-19 | 2011-01-19 | 预应力平衡法托架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202000261U true CN202000261U (zh) | 2011-10-05 |
Family
ID=44703006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200163744U Expired - Fee Related CN202000261U (zh) | 2011-01-19 | 2011-01-19 | 预应力平衡法托架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202000261U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493342A (zh) * | 2011-11-22 | 2012-06-13 | 中铁三局集团第六工程有限公司 | 连续梁静载预压托架施工方法 |
CN102518049A (zh) * | 2011-12-06 | 2012-06-27 | 中交第四公路工程局有限公司 | 悬浇梁0号块托架反支点预压施工方法 |
CN103088756A (zh) * | 2013-02-01 | 2013-05-08 | 葛洲坝集团第二工程有限公司 | 钢棒承重搭建盖梁施工平台的方法 |
-
2011
- 2011-01-19 CN CN2011200163744U patent/CN202000261U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493342A (zh) * | 2011-11-22 | 2012-06-13 | 中铁三局集团第六工程有限公司 | 连续梁静载预压托架施工方法 |
CN102518049A (zh) * | 2011-12-06 | 2012-06-27 | 中交第四公路工程局有限公司 | 悬浇梁0号块托架反支点预压施工方法 |
CN103088756A (zh) * | 2013-02-01 | 2013-05-08 | 葛洲坝集团第二工程有限公司 | 钢棒承重搭建盖梁施工平台的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201850498U (zh) | 水中钢栈桥 | |
CN204125899U (zh) | 一种高桩码头超大排架现浇墩台底模支撑系统 | |
CN102061742B (zh) | 防震钢筋混凝土仿古建筑结构体系 | |
CN201599040U (zh) | 一种用于盾构隧道的预制管片 | |
CN104532749A (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN203021923U (zh) | 大悬臂盖梁钢桁架施工平台 | |
CN105972313B (zh) | 一种横跨基坑工程管线悬吊方法及悬吊结构 | |
CN205806684U (zh) | 一种横跨基坑工程管线悬吊结构 | |
CN203429554U (zh) | 一种桥墩用分离式减隔震支撑体系 | |
CN202000261U (zh) | 预应力平衡法托架 | |
CN204112222U (zh) | 悬索桥主缆锚固预应力管道的支撑装置 | |
CN210828439U (zh) | 一种建筑物到期前混凝土架空层加固结构 | |
CN204385629U (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN110656723B (zh) | 用于柱面拱壳屋盖滑移施工的轨道支架 | |
CN207919315U (zh) | 四线高速铁路钢桁斜拉桥 | |
CN2809021Y (zh) | 大吨位基桩抗压静载试验中的预应力反力系统装置 | |
CN107476810B (zh) | 一种顶推装置的后背墙结构 | |
CN101260645B (zh) | 一种大跨度斜拉式栈桥 | |
CN206233656U (zh) | 钢框架厂房结构 | |
CN206091503U (zh) | 一种防震框架结构 | |
CN202644415U (zh) | 桥梁顶升用环形牛腿式抱柱梁 | |
CN102828616B (zh) | 一种屋盖高支模体系 | |
CN216141987U (zh) | 一种用于渠道遮盖的多跨配重式索桁架结构 | |
CN212533734U (zh) | 缆扣一体化塔架 | |
CN205171343U (zh) | 组合梁自锚式悬索桥 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111005 Termination date: 20170119 |
|