CN201991534U - Synchronous entrance and exit step for double-layer cage personnel in mine - Google Patents
Synchronous entrance and exit step for double-layer cage personnel in mine Download PDFInfo
- Publication number
- CN201991534U CN201991534U CN2011200296074U CN201120029607U CN201991534U CN 201991534 U CN201991534 U CN 201991534U CN 2011200296074 U CN2011200296074 U CN 2011200296074U CN 201120029607 U CN201120029607 U CN 201120029607U CN 201991534 U CN201991534 U CN 201991534U
- Authority
- CN
- China
- Prior art keywords
- cage
- platform
- personnel
- deck
- mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a synchronous entrance and exit step for double-layer cage personnel in a mine. The synchronous entrance and exit step comprises a platform (3), wherein four equal-height upright posts (4) are arranged at the bottom of the platform (3); a pedal (1) is arranged on one side of the platform (3); and guardrail (2) are arranged on both sides of the platform (3) and the step (1) respectively. During parking on the ground of an underground middle section of a lower layer of a double-layer cage, personnel on an upper layer and the lower layer can exit and enter the cage synchronously and conveniently without waiting for layer switching of the double-layer cage, so that the personnel lifting time is saved, the lifting efficiency is improved, and lifting power can be effectively saved.
Description
Technical field
The utility model relates to the pedal ladder of a kind of mining with two-deck(er) cage.
Background technology
Two-deck(er) cage is a kind of down-hole lifting appliance in the mining.Owing to the increase of mining amount, the lifting time is relatively nervous at present.The mode of existing discrepancy two-deck(er) cage generally is, wherein one deck cage is stopped at the personnel's turnover of back, place, ground, stage casing, down-hole, and another layer cage moves on to this place, drive ground and stop then, and the personnel in this another layer cage begin turnover again.Because two-deck(er) cage needs constantly to change layer up and down so that personnel come in and go out, and therefore loses time consumed power.
The utility model content
Technical problem to be solved in the utility model is, provides a kind of mine to come in and go out synchronously with the two-deck(er) cage personnel and pedals ladder, is convenient to personnel and efficiently passes in and out, and avoids two-deck(er) cage to change layer and stops, and saves time, and raises the efficiency.
It is as follows that the utility model solves the problems of the technologies described above the technical scheme that is adopted:
Come in and go out synchronously with the two-deck(er) cage personnel and pedal ladder in a kind of mine, it is characterized in that: comprise platform, the bottom of described platform is equipped with four contour columns; Be equipped with in a side of platform and pedal ladder; Be separately installed with guardrail in platform and the both sides of pedaling ladder.
The height of platform equals the bottom cage of terraced pairing two-deck(er) cage is pedaled in the mine with two-deck(er) cage personnel discrepancy synchronously height.
Good effect of the present utility model is:
Increase originally pedal ladder after, when two-deck(er) cage lower floor is stopped at place, ground, stage casing, down-hole, the bilevel personnel cage of can coming in and going out easily simultaneously, need not wait for that two-deck(er) cage changes layer, thereby save lifting personnel's time, increased lifting efficient, and can effectively save the lifting electric energy.
Description of drawings
Fig. 1 is a structural representation of the present utility model.Because two-deck(er) cage is a conventional design, only show among the figure and pedal terraced part, omitted two-deck(er) cage.
The specific embodiment
Further specify the utility model below in conjunction with drawings and Examples.
As shown in Figure 1, the utility model comprises platform 3, and the bottom of described platform 3 is equipped with four contour columns 4.Be equipped with in a side of platform 3 and pedal ladder 1.Be separately installed with the guardrail 2 of security protection effect in platform 3 and the both sides of pedaling ladder 1.
The height of platform 3 equals the bottom cage of terraced pairing two-deck(er) cage is pedaled in the mine with two-deck(er) cage personnel discrepancy synchronously height.
During use, column 4 bottoms are fixedly mounted on the ground, stage casing, down-hole by the bolt or the mode of inlaying, platform 3 is docked with two-deck(er) cage, the upper surface of platform 3 is positioned at cage bottom surface, upper strata.Two-deck(er) cage lower floor is when the parking of place, ground, stage casing, down-hole, and a part of personnel are directly by drive ground discrepancy lower floor cage, and another part personnel are by platform and pedal ladder discrepancy upper strata cage.
Claims (2)
1. come in and go out synchronously with the two-deck(er) cage personnel and pedal ladder in a mine, and it is characterized in that: comprise platform (3), the bottom of described platform (3) is equipped with four contour columns (4); Be equipped with in a side of platform (3) and pedal ladder (1); Be separately installed with guardrail (2) at platform (3) and the both sides of pedaling ladder (1).
2. coming in and going out synchronously with the two-deck(er) cage personnel and pedal ladder in mine as claimed in claim 1, it is characterized in that: the height of platform (3) equals the bottom cage of terraced pairing two-deck(er) cage is pedaled in the mine with two-deck(er) cage personnel discrepancy synchronously height.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200296074U CN201991534U (en) | 2011-01-28 | 2011-01-28 | Synchronous entrance and exit step for double-layer cage personnel in mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200296074U CN201991534U (en) | 2011-01-28 | 2011-01-28 | Synchronous entrance and exit step for double-layer cage personnel in mine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201991534U true CN201991534U (en) | 2011-09-28 |
Family
ID=44668024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200296074U Expired - Fee Related CN201991534U (en) | 2011-01-28 | 2011-01-28 | Synchronous entrance and exit step for double-layer cage personnel in mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201991534U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115395A (en) * | 2016-08-31 | 2016-11-16 | 玉溪大红山矿业有限公司 | A kind of multideck cage hydraulic pressure is automatically to tank People's Bank of China device |
-
2011
- 2011-01-28 CN CN2011200296074U patent/CN201991534U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115395A (en) * | 2016-08-31 | 2016-11-16 | 玉溪大红山矿业有限公司 | A kind of multideck cage hydraulic pressure is automatically to tank People's Bank of China device |
CN106115395B (en) * | 2016-08-31 | 2018-06-19 | 玉溪大红山矿业有限公司 | A kind of multideck cage hydraulic pressure automatically puts tank people's luggage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206667857U (en) | A kind of hydraulic-driven is double-deck mobile without avoidance jiffy stand | |
CN103362339B (en) | Large-capacity city special tower garage parking | |
CN2851425Y (en) | Semi-mechanical stereo parking place | |
CN103603523B (en) | A kind of modularization packaged type intelligence convenient stereo garage | |
CN201991534U (en) | Synchronous entrance and exit step for double-layer cage personnel in mine | |
CN202990504U (en) | Novel practical garage capable of ascending, descending and moving transversely | |
CN201037321Y (en) | Hydraulic caisson type lifting garage | |
CN101429825B (en) | Simple chain lifting type multi-storied garage | |
CN102889015A (en) | Three-dimensional garage elevator with opening and closing rotary disc at top part | |
CN204960432U (en) | Underground vertical lifting stereo garage | |
CN201943401U (en) | Comb-like planar movement parking equipment | |
CN201121427Y (en) | Simple lifting type parking equipment | |
CN203175099U (en) | Rail type simple chain-transmission lift parking device | |
CN202882493U (en) | Four-vertical-post lift | |
CN202108283U (en) | Ground multilayer simple lifting park device | |
CN203514891U (en) | Modular mobile intelligent convenient stereo garage | |
CN102145846A (en) | Rotary frame of attractive force energy-saving escalator | |
CN202379612U (en) | Boom guardrail for marine crane | |
CN2929070Y (en) | Large transporting device | |
CN202745444U (en) | Novel multifunctional garage perpendicularly lifting on roadside | |
CN201614219U (en) | Gyration-type frame for gravitation energy-saving escalator | |
CN201626757U (en) | Restoring frame of gravitation energy-saving escalator | |
CN203998561U (en) | Escalator system | |
CN201722960U (en) | Fully automatic bicycle parking garage | |
CN202850554U (en) | Three-dimensional garage lifter with open and close rotating disc which is arranged on the top of the three-dimensional garage lifter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110928 Termination date: 20180128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |