Guyed form traveler arc-shaped head Download PDFInfo
- Publication number
- CN201990948U CN201990948U CN2011200485413U CN201120048541U CN201990948U CN 201990948 U CN201990948 U CN 201990948U CN 2011200485413 U CN2011200485413 U CN 2011200485413U CN 201120048541 U CN201120048541 U CN 201120048541U CN 201990948 U CN201990948 U CN 201990948U
- Authority
- CN
- China
- Prior art keywords
- arc
- guyed
- cable
- baffle plate
- shaped head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a guyed form traveler arc-shaped head adopted in cable stayed bridge construction, which comprises longitudinal beams (3), wherein the two longitudinal beams (3) are overlapped in the vertical direction, i.e. the double-longitudinal-beam structure is adopted, a steel box (5) with a stiffening plate (4) is arranged between the two longitudinal beams (3) arranged at both sides in the horizontal direction, the outer side of the longitudinal beams is provided with a baffle plate (9), and a pad beam (10) is arranged between the baffle plate (9) and an anchor beam (8). The guyed form traveler arc-shaped head successfully solves the technical problem that when a cable stayed bridge with the cable surface in a space curved surface adopts the guyed form traveler for construction, the guyed form traveler arc-shaped head structure needs to adapt to angle changes of stay cables in each beam section in the longitudinal bridge direction and the transverse bridge direction and needs to be capable of balancing the transverse component force. The guyed form traveler arc-shaped head is suitable for construction of the cable stayed bridge with the cable surface in the space curved surface.
Description
Technical field
The utility model relates to a kind of dragging suspension basket arc head that adopts in CONSTRUCTION OF CABLE-STAYED BRIDGE.
Background technology
In the past, adopted the cable stayed bridge of dragging suspension basket construction, be generally single rope face or double plane cable stayed bridge, promptly its suspension cable in one or two regular plane, the simple structure of Hanging Basket arc head.Current, bridge construction is constantly weeded out the old and bring forth the new, and is the cable stayed bridge of arch for Sarasota, and promptly its suspension cable arranges it no longer is the plane of rule, but space curved surface.When the cable stayed bridge of Spatial Cable face adopted the dragging suspension basket construction, the first structure of existing Hanging Basket arc was no longer suitable.
The utility model content
The technical problems to be solved in the utility model is: a kind of dragging suspension basket arc head is provided, and is arch or other polymorphic structure to adapt to Sarasota, and the rope face is the CONSTRUCTION OF CABLE-STAYED BRIDGE needs of space curved surface, overcomes the deficiencies in the prior art.
The utility model is by the following technical solutions: in 3 stacks of two longerons of vertical direction, promptly adopt two longitudinal beam structures; The steel case 5 of band stiffener 4 is set between two side girders 3 in the horizontal direction; At the arranged outside baffle plate 9 of longeron 3,8 of baffle plate 9 and anchor beams are provided with bearing beam 10.
Adopt between the steel case (5) of band stiffener (4) and horizontal direction two side girders (3) and be welded to connect; Adopt between baffle plate (9) and the longeron (3) and be welded to connect; Between baffle plate (9) and the bearing beam (10), adopt bolt to be connected between bearing beam (10) and the anchor beam (8).
Anchor beam (8) upper surface is close to steel case (5) arc face, the axis normal of soffit and beam section suspension cable (1).
During the first design of Hanging Basket arc, adopt two longerons as main force structure, the arc length of longeron and horizontal spacing satisfy respectively suspension cable in each beam section construction vertical bridge to the angle amplitude of variation of direction across bridge.The steel case of band stiffener is set between two longerons, pulling force is delivered to two side girders.The geometric position of suspension cable is provided with cable guide pipe respectively during by each beam section construction, is convenient to hard tension rod and passes.In the first lower end of Hanging Basket arc, by the anchoring temporarily position of each beam section suspension cable anchor beam is set respectively, the first arranged outside baffle plate of arc is provided with bearing beam between baffle plate and anchor beam, and the transverse component of avoiding stretch-draw to produce causes that anchor beam produces laterally and slides.
For Sarasota is arch or other polymorphic structure, the rope face is the cable stayed bridge of space curved surface, when adopting the dragging suspension basket construction, the first structure of arc is wanted to adapt to each beam section suspension cable and is changed to the angle with the direction across bridge both direction at vertical bridge, thereby when realizing each beam section construction, the Hanging Basket front fulcrum all can utilize the corresponding suspension cable of this beam section, and can balanced transversal component.
The utility model is applicable to the Spatial Cable face, it has successfully solved for the rope face is the cable stayed bridge of space curved surface when adopting the dragging suspension basket construction, and the first structure of Hanging Basket arc is wanted to adapt to each beam section suspension cable and changed and requirement that can balanced transversal component to the angle with the direction across bridge both direction at vertical bridge.The first structure stress of this Hanging Basket arc is reasonable, and constructing operation is easy, and can guarantee construction safety.
Description of drawings
Fig. 1 is an elevation of the present utility model;
Fig. 2 is the I-I sectional view of Fig. 1;
Fig. 3 is the II-II sectional view of Fig. 1;
Fig. 4 is the interim stretch-draw anchor schematic diagram of suspension cable;
The specific embodiment
Dragging suspension basket arc head, it comprises two longerons 3, stiffener 4, steel case 5, cable guide pipe 6, anchor beam 8, baffle plate 9, bearing beam 10.According to the axis geometric position of each beam section suspension cable 1 in the bridge design, count suspension cable in the construction of each beam section vertical bridge to the angle amplitude of variation of direction across bridge.During first 2 designs of Hanging Basket arc, adopt two longerons 3 as main force structure, the arc length of longeron and horizontal spacing satisfy respectively suspension cable in each beam section construction vertical bridge to the angle amplitude of variation of direction across bridge.The steel case 5 of band stiffener 4 is set between two longerons, pulling force is delivered to two side girders.The geometric position of suspension cable is provided with cable guide pipe 6 respectively during by each beam section construction, is convenient to hard tension rod 7 and passes, and when stiffener conflicts with the cable guide pipe position, suitably adjusts cable guide pipe 6.In the first lower end of Hanging Basket arc, by the anchoring temporarily position of each beam section suspension cable anchor beam 8 is set respectively, the first arranged outside baffle plate 9 of arc, 8 of baffle plate 9 and anchor beams are provided with bearing beam 10, and the transverse component of avoiding stretch-draw to produce causes that anchor beam 8 produces laterally slip.
Claims (3)
1. dragging suspension basket arc head, it comprises longeron (3), it is characterized in that: in two longerons of vertical direction (3) stack, promptly adopt two longitudinal beam structures; The steel case (5) of band stiffener (4) is set between two side girders (3) in the horizontal direction; At the arranged outside baffle plate (9) of longeron (3), between baffle plate (9) and anchor beam (8) bearing beam (10) is set.
2. dragging suspension basket arc head according to claim 1 is characterized in that: adopt between the steel case (5) of band stiffener (4) and horizontal direction two side girders (3) to be welded to connect; Adopt between baffle plate (9) and the longeron (3) and be welded to connect; Between baffle plate (9) and the bearing beam (10), adopt bolt to be connected between bearing beam (10) and the anchor beam (8).
3. dragging suspension basket arc head according to claim 1 is characterized in that: anchor beam (8) upper surface is close to steel case (5) arc face, the axis normal of soffit and beam section suspension cable (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200485413U CN201990948U (en) | 2011-02-28 | 2011-02-28 | Guyed form traveler arc-shaped head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200485413U CN201990948U (en) | 2011-02-28 | 2011-02-28 | Guyed form traveler arc-shaped head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201990948U true CN201990948U (en) | 2011-09-28 |
Family
ID=44667437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200485413U Expired - Lifetime CN201990948U (en) | 2011-02-28 | 2011-02-28 | Guyed form traveler arc-shaped head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201990948U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230312A (en) * | 2011-02-28 | 2011-11-02 | 中铁五局(集团)有限公司 | Cable-stayed cradle cambered head |
CN104120659A (en) * | 2014-08-15 | 2014-10-29 | 山东省路桥集团有限公司 | Descending type suspended scaffold |
-
2011
- 2011-02-28 CN CN2011200485413U patent/CN201990948U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230312A (en) * | 2011-02-28 | 2011-11-02 | 中铁五局(集团)有限公司 | Cable-stayed cradle cambered head |
CN102230312B (en) * | 2011-02-28 | 2012-08-15 | 中铁五局(集团)有限公司 | Cable-stayed cradle cambered head |
CN104120659A (en) * | 2014-08-15 | 2014-10-29 | 山东省路桥集团有限公司 | Descending type suspended scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201553986U (en) | Stay cable steel anchoring beam structure | |
CN202012047U (en) | Steel strand inclined pulling and buckling system of tower | |
CN102230312B (en) | Cable-stayed cradle cambered head | |
CN104131630A (en) | Multi-pipe lattice type buckling-restrained brace | |
CN203593944U (en) | Connecting structure for steel bar hanging rod and concrete | |
CN201990948U (en) | Guyed form traveler arc-shaped head | |
CN204644869U (en) | Drag-line bridge tower anchoring structure | |
CN202658867U (en) | Overhanging construction platform | |
CN203583378U (en) | Floor plate truss trolley for mounting bridge deck slab of composite structure bridge | |
CN205171367U (en) | Eliminate tensile suspension cable anchor of concrete girder cable -stay bridge span centre structure | |
CN204455850U (en) | The interim suspension connection device of Large Steel box beam erection | |
CN204454355U (en) | The trapezoidal arm of flat-top tower crane | |
CN203546600U (en) | Steel strand guiding device | |
CN203559334U (en) | Reinforcing structure for suspended carrying part of aluminum alloy overhead bridge escalator | |
CN203188109U (en) | Multi-span ground anchor type suspension bridge | |
CN202064282U (en) | Cable suspended wagon structure | |
CN202023155U (en) | Bridge erecting machine capable of feeding beam at side | |
CN202704912U (en) | Rope guide device applied to well drilling winch | |
CN204167796U (en) | A kind of pulley-type tower head jig | |
CN204266127U (en) | Large sections hoisting mechanism | |
CN202359826U (en) | Structure for fixing stiff steel columns temporarily | |
CN104120889B (en) | Tube truss structure integral lifting apparatus | |
CN203080422U (en) | Bridge guiding girder device | |
CN203639031U (en) | Tubular unwinding device | |
CN204455859U (en) | A kind of hanger bindiny mechanism of large sections steel box-girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |