CN203546600U - Steel strand guiding device - Google Patents

Steel strand guiding device Download PDF

Info

Publication number
CN203546600U
CN203546600U CN201320603066.0U CN201320603066U CN203546600U CN 203546600 U CN203546600 U CN 203546600U CN 201320603066 U CN201320603066 U CN 201320603066U CN 203546600 U CN203546600 U CN 203546600U
Authority
CN
China
Prior art keywords
steel strand
guiding device
guiding
steel
strand guiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320603066.0U
Other languages
Chinese (zh)
Inventor
杨梦纯
王跃年
宋伟俊
涂满明
侯爵
马永强
刘晓阳
刘铿
李军堂
许颖强
江湧
叶荣华
国洪光
张鹏
段立波
宋小三
周燕飞
唐明
周瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
1st Engineering Co Ltd of MBEC
Original Assignee
No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Engineering Co Ltd Zhongtie Bridge Bureau Group, China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
Priority to CN201320603066.0U priority Critical patent/CN203546600U/en
Application granted granted Critical
Publication of CN203546600U publication Critical patent/CN203546600U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel strand guiding device, and relates to the field of bridge construction. The steel strand guiding device comprises a guiding body, wherein the guiding body is cylindrical; the outer surface of the guiding body is provided with a guiding groove; the guiding groove is curved along the periphery of the guiding body. The steel strand guiding device is fixed to a horizontal continuous jack operation platform in a welding mode. The surface of the steel strand guiding device is welded with a corresponding steel strand collection guiding groove according to the steel strand collection direction, namely an angle, a winch is arranged on a steel truss bridge deck, and a steel strand is smoothly put on a steel truss bridge deck slab through the winch and the steel strand guiding device, so that the steel strand is conveniently bound and installed again, a great number of machines and a great amount of manpower for repeated transportation are avoided, and the steel truss is efficiently pushed in a long distance.

Description

Steel strand guiding device
Technical field
The utility model relates to field of bridge construction, particularly relates to a kind of steel strand guiding device.
Background technology
Along with developing rapidly of China's economy, need the project of construction increasing, the bridge of Steel truss structure is more and more, more and more higher to safety, quality, the schedule requirement of construction, must employ new technology, new technology, could realize the high-quality, high-quality of infrastructure requirement.At present, for greatly across, long connection steel truss girder incremental launching construction, generally at each bridge pier Dun Ding, a whole set of level, vertical jack are set, the horizontal-top that completes steel truss girder is passed moving and vertically rises and falls, need to drop into a large amount of levels, vertical jack and synchronous, correction control measure, local fault, by the incremental launching construction of the whole steel truss girder of impact, affects construction speed.For the multi-joint steel truss girder construction of multispan, generally first will often across every steel truss girder, with interim rod member, be connected, form a long connection and carry out free cantilever erection or incremental launching construction, need to increase interim connecting rod and the nose girder rod member between a large amount of connection and connection, adopt a large amount of machinery, manpower to have bad luck back and forth, expend a large amount of human and material resources, financial resources.
Utility model content
The purpose of this utility model is in order to overcome the deficiency of above-mentioned background technology, a kind of steel strand guiding device is provided, successfully steel strand are positioned on steel truss girder bridge panel, lashing again, installation with aspect steel strand, avoid adopting a large amount of machinery, manpower to have bad luck back and forth, be conducive to realize the long distance of steel truss girder, efficient pushing tow.
The utility model provides a kind of steel strand guiding device, comprises guide way, and described guide way is cylindrical, and the external surface of described guide way is provided with gathering sill, and gathering sill is arranged along the circumferential skewing of guide way.
On the basis of technique scheme, described steel strand guiding device is fixed on horizontal continuity jack operating platform by welding manner.
Compared with prior art, advantage of the present utility model is as follows:
It is that angle is welded corresponding steel strand receipts rope gathering sill that steel strand guide surface is received Suo Fangxiang according to steel strand, on steel truss girder bridge floor, hoist engine is set, by hoist engine and steel strand guiding device, successfully steel strand are positioned on steel truss girder bridge panel, lashing again, installation with aspect steel strand, avoid adopting a large amount of machinery, manpower to have bad luck back and forth, be conducive to realize the long distance of steel truss girder, efficient pushing tow.
Accompanying drawing explanation
Fig. 1 is the front view of horizontal continuity jack anchoring reaction frame and steel strand guiding device in the utility model embodiment.
Fig. 2 is the top view of Fig. 1.
The specific embodiment
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.
The utility model embodiment provides a kind of steel strand guiding device, shown in Fig. 1, Fig. 2, steel strand guiding device is fixed on horizontal continuity jack operating platform by welding manner, steel strand guiding device comprises guide way and gathering sill, guide way is cylindrical, the external surface of guide way is provided with gathering sill, and gathering sill is arranged along the circumferential skewing of guide way.It is that angle is welded corresponding steel strand receipts rope gathering sill that steel strand guide surface is received Suo Fangxiang according to steel strand, on steel truss girder bridge floor, hoist engine is set, by hoist engine and steel strand guiding device, successfully steel strand are positioned on steel truss girder bridge panel, lashing again, installation with aspect steel strand, avoid adopting a large amount of machinery, manpower to have bad luck back and forth, be conducive to realize the long distance of steel truss girder, efficient pushing tow.
Those skilled in the art can carry out various modifications and variations to the utility model embodiment; if these are revised and modification belongs within the scope of the utility model claim and equivalent technologies thereof, these modifications and modification are also within protection domain of the present utility model.
The prior art that the content of not describing in detail in manual is known to the skilled person.

Claims (2)

1. a steel strand guiding device, comprises guide way, and described guide way is cylindrical, it is characterized in that: the external surface of described guide way is provided with gathering sill, and gathering sill is arranged along the circumferential skewing of guide way.
2. steel strand guiding device as claimed in claim 1, is characterized in that: described steel strand guiding device is fixed on horizontal continuity jack operating platform by welding manner.
CN201320603066.0U 2013-09-27 2013-09-27 Steel strand guiding device Expired - Lifetime CN203546600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320603066.0U CN203546600U (en) 2013-09-27 2013-09-27 Steel strand guiding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320603066.0U CN203546600U (en) 2013-09-27 2013-09-27 Steel strand guiding device

Publications (1)

Publication Number Publication Date
CN203546600U true CN203546600U (en) 2014-04-16

Family

ID=50464737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320603066.0U Expired - Lifetime CN203546600U (en) 2013-09-27 2013-09-27 Steel strand guiding device

Country Status (1)

Country Link
CN (1) CN203546600U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835989A (en) * 2017-02-10 2017-06-13 中交路桥华南工程有限公司 The method that floorings installation is carried out using truss-like assistance platform
CN108868155A (en) * 2018-06-27 2018-11-23 中国核工业华兴建设有限公司 A kind of packaged type steel stranded wire penetrating adapter guiding device and its application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835989A (en) * 2017-02-10 2017-06-13 中交路桥华南工程有限公司 The method that floorings installation is carried out using truss-like assistance platform
CN108868155A (en) * 2018-06-27 2018-11-23 中国核工业华兴建设有限公司 A kind of packaged type steel stranded wire penetrating adapter guiding device and its application method
CN108868155B (en) * 2018-06-27 2020-10-20 中国核工业华兴建设有限公司 Movable steel strand pulling guide device and use method thereof

Similar Documents

Publication Publication Date Title
CN102767303B (en) Precast concrete tower and construction method thereof
CN202131566U (en) Bridge tower anchoring structure combined by corrugated steel plates and concrete
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN102733615B (en) Unsymmetrical integral lifting construction method
CN201512345U (en) Multifunctional integrated lifting frame
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN202658532U (en) Bridge wet joint construction template
CN202323703U (en) Beam bottom checking trolley
CN205205685U (en) Span wire pier is function portal device at most
CN203546600U (en) Steel strand guiding device
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN211141349U (en) Track panel well gantry crane foundation fixing structure
CN203334182U (en) Structure used for connecting railway concrete retaining wall with steel bridge panel
CN204185775U (en) A kind of two-wire reciprocal gantry type systemic circulation trailer system
CN202337945U (en) Outer side in-place beam body lifting device
CN205653066U (en) Take gantry crane of windrow dolly linkage
CN205653067U (en) Gantry crane is prevented rocking by special rope in harbour
CN205575406U (en) High -rise boat car track structure
CN205741926U (en) Stretch-draw prepressing device in Cast-in-situ Beam steel pipe beret truss platform
CN205501827U (en) A horizontal cable bogie for catwalk system of shaking
CN108625275A (en) A kind of stiffening girder of suspension bridge section installation method
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN201990948U (en) Guyed form traveler arc-shaped head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU

Free format text: FORMER OWNER: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU GROUP GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Effective date: 20150225

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150225

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150225

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Patentee after: 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd.

Patentee before: 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140416