CN102230312B - Cable-stayed cradle cambered head - Google Patents
Cable-stayed cradle cambered head Download PDFInfo
- Publication number
- CN102230312B CN102230312B CN 201110046347 CN201110046347A CN102230312B CN 102230312 B CN102230312 B CN 102230312B CN 201110046347 CN201110046347 CN 201110046347 CN 201110046347 A CN201110046347 A CN 201110046347A CN 102230312 B CN102230312 B CN 102230312B
- Authority
- CN
- China
- Prior art keywords
- cable
- bridge
- stayed
- cradle
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention discloses a cable-stayed cradle cambered head used in a construction process of a cable-stayed bridge, which comprises longitudinal beams (3), wherein the two longitudinal beams (3) are superposed in the vertical direction, i.e. a double-longitudinal-beam structure is adopted; a steel box (5) with stiffening plates (4) is arranged between two sides of the longitudinal beams (3) in the horizontal direction; a baffle plate (9) is arranged on the outer side of the longitudinal beams; and a template beam (10) is arranged between the baffle plate (9) and an anchor beam (8). The invention successfully solves the technical problem that the cradle cambered head structure must adapt to the angular change of stay cables in every beam section both in the longitudinal bridge direction and the transverse bridge direction and can balance the transverse component when a cable-stayed bridge of which the cable surface is a spacial cambered surface is constructed in a cable-stayed cradle way. The invention is applicable to construction of a cable-stayed bridge of which the cable surface is a spacial cambered surface.
Description
Technical field
It is first to the present invention relates to a kind of dragging suspension basket arc that in CONSTRUCTION OF CABLE-STAYED BRIDGE, adopts.
Background technology
In the past, adopted the cable stayed bridge of dragging suspension basket construction, be generally single rope face or double plane cable stayed bridge, promptly its suspension cable in one or two regular plane, the simple structure that the Hanging Basket arc is first.Current, bridge construction is constantly weeded out the old and bring forth the new, and is the cable stayed bridge of arch for Sarasota, and promptly its suspension cable arranges it no longer is the plane of rule, but space curved surface.When the cable stayed bridge of Spatial Cable face adopted the dragging suspension basket construction, the first structure of existing Hanging Basket arc was no longer suitable.
Summary of the invention
The technical problem that the present invention will solve is: providing a kind of dragging suspension basket arc first, is arch or other polymorphic structure to adapt to Sarasota, and the rope face is the CONSTRUCTION OF CABLE-STAYED BRIDGE needs of space curved surface, overcomes the deficiency of prior art.
The present invention adopts following technical scheme: in 3 stacks of two longerons of vertical direction, promptly adopt two longitudinal beam structures; The steel case 5 of band stiffener 4 is set between two side girders 3 in the horizontal direction; At the arranged outside plate washer 9 of longeron 3,8 of baffle plate 9 and anchor beams are provided with bearing beam 10.
Adopt between the steel case (5) of band stiffener (4) and horizontal direction two side girders (3) and be welded to connect; Adopt between plate washer (9) and the longeron (3) and be welded to connect; Between baffle plate (9) and the bearing beam (10), adopt bolt to be connected between bearing beam (10) and the anchor beam (8).
Anchor beam (8) upper surface is close to steel case (5) arc face, the axis normal of soffit and beam section suspension cable (1).
During the first design of Hanging Basket arc, adopt two longerons as main force structure, the arc length of longeron and horizontal spacing satisfy respectively suspension cable in each beam section construction vertical bridge to the angle amplitude of variation of direction across bridge.The steel case of band stiffener is set between two longerons, pulling force is delivered to two side girders.The geometric position of suspension cable is provided with cable guide pipe respectively during by each beam section construction, is convenient to hard tension rod and passes.In the first lower end of Hanging Basket arc, by the anchoring temporarily position of each beam section suspension cable anchor beam is set respectively, the first arranged outside plate washer of arc is provided with bearing beam between baffle plate and anchor beam, and the transverse component of avoiding stretch-draw to produce causes that anchor beam produces laterally and slides.
For Sarasota is arch or other polymorphic structure; The rope face is the cable stayed bridge of space curved surface; When adopting the dragging suspension basket construction, the first structure of arc is wanted to adapt to each beam section suspension cable and is changed to the angle with the direction across bridge both direction at vertical bridge, thereby when realizing each beam section construction; The Hanging Basket front fulcrum all can utilize the corresponding suspension cable of this beam section, and can balanced transversal component.
The present invention is applicable to the Spatial Cable face; It has successfully solved for the rope face is the cable stayed bridge of space curved surface when adopting the dragging suspension basket construction, and the first structure of Hanging Basket arc is wanted to adapt to each beam section suspension cable and changed and requirement that can balanced transversal component to the angle with the direction across bridge both direction at vertical bridge.The first structure stress of this Hanging Basket arc is reasonable, and constructing operation is easy, and can guarantee construction safety.
Description of drawings
Fig. 1 is an elevation of the present invention;
Fig. 2 is I-I sectional view of Fig. 1;
Fig. 3 is II-II sectional view of Fig. 1;
Fig. 4 is the interim stretch-draw anchor sketch map of suspension cable.
The specific embodiment
The dragging suspension basket arc is first, and it comprises two longerons 3, stiffener 4, steel case 5, cable guide pipe 6, anchor beam 8, plate washer 9, bearing beam 10.According to the axis geometric position of each beam section suspension cable 1 in the bridge design, count suspension cable in the construction of each beam section vertical bridge to the angle amplitude of variation of direction across bridge.During first 2 designs of Hanging Basket arc, adopt two longerons 3 as main force structure, the arc length of longeron and horizontal spacing satisfy respectively suspension cable in each beam section construction vertical bridge to the angle amplitude of variation of direction across bridge.The steel case 5 of band stiffener 4 is set between two longerons, pulling force is delivered to two side girders.The geometric position of suspension cable is provided with cable guide pipe 6 respectively during by each beam section construction, is convenient to hard tension rod 7 and passes, and when stiffener conflicts with the cable guide pipe position, suitably adjusts cable guide pipe 6.In the first lower end of Hanging Basket arc, by the anchoring temporarily position of each beam section suspension cable anchor beam 8 is set respectively, the first arranged outside plate washer 9 of arc, 8 of baffle plate 9 and anchor beams are provided with bearing beam 10, and the transverse component of avoiding stretch-draw to produce causes that anchor beam 8 produces laterally slip.
Claims (3)
1. a dragging suspension basket arc is first, and it comprises longeron (3), it is characterized in that: in two longerons of vertical direction (3) stack, promptly adopt two longitudinal beam structures; The steel case (5) of band stiffener (4) is set between two side girders (3) in the horizontal direction; At the arranged outside plate washer (9) of longeron (3), between baffle plate (9) and anchor beam (8) bearing beam (10) is set.
2. dragging suspension basket arc according to claim 1 is first, it is characterized in that: adopt between the steel case (5) of band stiffener (4) and horizontal direction two side girders (3) to be welded to connect; Adopt between plate washer (9) and the longeron (3) and be welded to connect; Between baffle plate (9) and the bearing beam (10), adopt bolt to be connected between bearing beam (10) and the anchor beam (8).
3. dragging suspension basket arc according to claim 1 is first, and it is characterized in that: anchor beam (8) upper surface is close to steel case (5) arc face, the axis normal of soffit and beam section suspension cable (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110046347 CN102230312B (en) | 2011-02-28 | 2011-02-28 | Cable-stayed cradle cambered head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110046347 CN102230312B (en) | 2011-02-28 | 2011-02-28 | Cable-stayed cradle cambered head |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102230312A CN102230312A (en) | 2011-11-02 |
CN102230312B true CN102230312B (en) | 2012-08-15 |
Family
ID=44842911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110046347 Active CN102230312B (en) | 2011-02-28 | 2011-02-28 | Cable-stayed cradle cambered head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102230312B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103105256B (en) * | 2013-01-29 | 2015-08-19 | 葛洲坝集团第五工程有限公司 | A kind of Cable-stayed Bridge Model test cable force test macro and method |
CN108004925B (en) * | 2017-11-29 | 2019-05-24 | 浙江省大成建设集团有限公司 | Prestress reinforced concrete circular arch tower construction method |
CN112064519B (en) * | 2020-08-28 | 2021-09-14 | 中铁大桥局集团有限公司 | Long platform guy cable hanging basket and main beam segment construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU687162A1 (en) * | 1977-03-18 | 1979-09-25 | Московский Ордена Ленина И Ордена Трудового Красного Знамени Институт Инженеров Железнодорожного Транспорта | Assembly of adjusting stay to box-type sectional of blocks reinforced concrete beam of rigidity of stay bridge |
CN2263134Y (en) * | 1995-08-09 | 1997-09-24 | 铁道部大桥工程局 | Short platform compound hauling-rope type hanging basket |
CN2597531Y (en) * | 2002-11-21 | 2004-01-07 | 广东省长大公路工程有限公司第一分公司 | Single rope face tracting rope hanging cage |
CN101173503A (en) * | 2007-11-20 | 2008-05-07 | 中铁大桥局集团第二工程有限公司 | Three-point walking single cable face cable-dragging suspension basket |
CN201990948U (en) * | 2011-02-28 | 2011-09-28 | 中铁五局(集团)有限公司 | Guyed form traveler arc-shaped head |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100823859B1 (en) * | 2006-12-07 | 2008-04-21 | 정재룡 | Inspection & repair method and the device for an elevated road |
-
2011
- 2011-02-28 CN CN 201110046347 patent/CN102230312B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU687162A1 (en) * | 1977-03-18 | 1979-09-25 | Московский Ордена Ленина И Ордена Трудового Красного Знамени Институт Инженеров Железнодорожного Транспорта | Assembly of adjusting stay to box-type sectional of blocks reinforced concrete beam of rigidity of stay bridge |
CN2263134Y (en) * | 1995-08-09 | 1997-09-24 | 铁道部大桥工程局 | Short platform compound hauling-rope type hanging basket |
CN2597531Y (en) * | 2002-11-21 | 2004-01-07 | 广东省长大公路工程有限公司第一分公司 | Single rope face tracting rope hanging cage |
CN101173503A (en) * | 2007-11-20 | 2008-05-07 | 中铁大桥局集团第二工程有限公司 | Three-point walking single cable face cable-dragging suspension basket |
CN201990948U (en) * | 2011-02-28 | 2011-09-28 | 中铁五局(集团)有限公司 | Guyed form traveler arc-shaped head |
Non-Patent Citations (2)
Title |
---|
崔林钊.六安市淠望路大桥牵索挂篮设计.《工程与建设》.2009,第23卷(第5期),全文. * |
熊守富,陈钧,李本宏.双塔连体四索面分幅斜拉桥牵索挂篮设计.《世界桥梁》.2009,(第4期),全文. * |
Also Published As
Publication number | Publication date |
---|---|
CN102230312A (en) | 2011-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102975818B (en) | A kind of aluminum alloy superstructure block hanging method | |
KR101339609B1 (en) | Truss girder of steel box | |
CN102230312B (en) | Cable-stayed cradle cambered head | |
CN201077954Y (en) | Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge | |
CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
CN205036070U (en) | Device is set up in complete pre -buried installation of cantilever frame roof beam side | |
CN201990948U (en) | Guyed form traveler arc-shaped head | |
CN102677582B (en) | Half-through bowstring arch bridge adopting partial rigid connection mode among arched girders | |
CN204644869U (en) | Drag-line bridge tower anchoring structure | |
CN104695317A (en) | Multi-span rigid frame bowstring arch bridge | |
CN104989166A (en) | Support structure for chimney internal steel cylinders | |
CN202990100U (en) | Car frame stabilizing device of stereo garage | |
CN202337945U (en) | Outer side in-place beam body lifting device | |
CN202105884U (en) | Driving track corrector | |
CN203188109U (en) | Multi-span ground anchor type suspension bridge | |
CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
CN204778289U (en) | Cable support tower construction reinforcing bar festival section hoist | |
CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
KR101352956B1 (en) | Cable-stayed bridge construction method | |
CN203319500U (en) | Reinforcing cage abutting-joint adjusting device | |
CN203639016U (en) | Balance beam for hoisting reinforcing steel bars by tower crane | |
CN202185973U (en) | Device for assisting dismounting and installing T beam formwork | |
CN204266127U (en) | Large sections hoisting mechanism | |
CN201952736U (en) | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder | |
KR101194932B1 (en) | Manufacturing method of steel beam with essentric prestressing plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |