CN204455850U - The interim suspension connection device of Large Steel box beam erection - Google Patents

The interim suspension connection device of Large Steel box beam erection Download PDF

Info

Publication number
CN204455850U
CN204455850U CN201520095043.2U CN201520095043U CN204455850U CN 204455850 U CN204455850 U CN 204455850U CN 201520095043 U CN201520095043 U CN 201520095043U CN 204455850 U CN204455850 U CN 204455850U
Authority
CN
China
Prior art keywords
steel box
box girder
steel
temporary suspension
connection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520095043.2U
Other languages
Chinese (zh)
Inventor
张连江
孙建波
徐波
王文山
沈家海
史虎彬
朱武华
郑伟涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
Priority to CN201520095043.2U priority Critical patent/CN204455850U/en
Application granted granted Critical
Publication of CN204455850U publication Critical patent/CN204455850U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种大型钢箱梁架设的临时悬挂连接装置,其特征在于所述临时悬挂连接装置包括至少一梁端牛腿,该梁端牛腿具有一钢支撑主体,该钢支撑主体的两端下部分别设置两个连接部,该两个连接部分别与两个对接的钢箱梁端部连接。该大型钢箱梁架设的临时悬挂连接装置结构设计合理、操作简单方便,其能够满足大型钢箱梁在吊装架设时的临时悬挂预定位,为大型钢箱梁的位置调整提供了稳定且不受限的条件。该临时悬挂连接装置借助前端固定的大型钢箱梁的端部,安全有效地实现了吊装架设的大型钢箱梁的临时悬挂连接。

A temporary suspension connection device for erecting a large steel box girder, characterized in that the temporary suspension connection device includes at least one beam end corbel, the beam end corbel has a steel support body, and the lower parts of the two ends of the steel support body are respectively Two connecting parts are provided, and the two connecting parts are respectively connected to the ends of the two butted steel box girders. The temporary suspension connection device for the erection of the large steel box girder has a reasonable structural design and simple and convenient operation. limited conditions. The temporary suspension connection device safely and effectively realizes the temporary suspension connection of the hoisted and erected large steel box girder by means of the end of the large steel box girder fixed at the front end.

Description

大型钢箱梁架设的临时悬挂连接装置Temporary Suspension Connection Device for Erection of Large Steel Box Girder

技术领域technical field

本实用新型属于高架路桥的大型钢箱梁的安装施工技术,具体的涉及一种大型钢箱梁于桥墩顶部吊装后其端部的临时悬挂连接号装置。The utility model belongs to the installation and construction technology of a large steel box girder of an elevated road bridge, in particular to a temporary suspension connection number device at the end of a large steel box girder after hoisting on the top of a bridge pier.

背景技术Background technique

随着建筑工业和技术的日益发展,我国已经在沿海进行了多个海上高架桥梁的施工。为了实现高效率和高性能的高架梁施工,现有已经出现采用具有较大跨度的大节段钢箱梁,其长度已经达到80至130多米,重量高达2000多吨。由于大跨度钢箱梁多适用于海上高架桥梁,因此如何进行平稳和安全的吊装成为桥梁施工技术的关键。在一段钢箱梁进行吊装安装后,相邻的钢箱梁再进行吊装后需要进行两者的对接调整,此时由于钢箱梁在纵向和横向上均需要进行位置调整。由于设计施工要求,该单个钢箱梁的重心并不完全位于下部桥墩上,因此对钢箱梁进行临时定位以便于进行位置调整和定位成为需要解决的技术问题。但钢箱梁的吊装环境无法满足添加其他辅助高架工具进行临时悬挂定位的要求。With the development of construction industry and technology, our country has carried out the construction of many sea viaducts along the coast. In order to achieve high-efficiency and high-performance viaduct construction, there have been large-span steel box girders with large spans, the length of which has reached 80 to 130 meters, and the weight has reached more than 2,000 tons. Since long-span steel box girders are mostly suitable for offshore viaducts, how to carry out smooth and safe hoisting becomes the key to bridge construction technology. After a section of steel box girder is hoisted and installed, the adjacent steel box girder needs to be adjusted for docking after hoisting. At this time, the position of the steel box girder needs to be adjusted both longitudinally and horizontally. Due to design and construction requirements, the center of gravity of the single steel box girder is not completely located on the lower pier, so temporarily positioning the steel box girder for easy position adjustment and positioning has become a technical problem that needs to be solved. However, the hoisting environment of the steel box girder cannot meet the requirements of adding other auxiliary elevated tools for temporary suspension positioning.

实用新型内容Utility model content

本实用新型提供了一种结构设计合理、操作简单方便的大型钢箱梁架设的临时悬挂连接装置,其能够满足大型钢箱梁在吊装架设时的临时悬挂预定位,为大型钢箱梁的位置调整提供了稳定且不受限的条件。该临时悬挂连接装置借助前端固定的大型钢箱梁的端部,安全有效地实现了吊装架设的大型钢箱梁的临时悬挂连接。The utility model provides a temporary suspension connection device for the erection of a large steel box girder with reasonable structure design and simple and convenient operation, which can meet the temporary suspension pre-positioning of the large steel box girder during hoisting and erection, and is the location of the large steel box girder Tuning provides stable and unrestricted conditions. The temporary suspension connection device safely and effectively realizes the temporary suspension connection of the hoisted and erected large steel box girder by means of the end of the large steel box girder fixed at the front end.

本实用新型所采用的技术方案如下:The technical scheme adopted in the utility model is as follows:

一种大型钢箱梁架设的临时悬挂连接装置,其特征在于所述临时悬挂连接装置包括至少一梁端牛腿,该梁端牛腿具有一钢支撑主体,该钢支撑主体的两端下部分别设置两个连接部,该两个连接部分别与两个对接的钢箱梁端部连接。A temporary suspension connection device for erecting a large steel box girder, characterized in that the temporary suspension connection device includes at least one beam end corbel, the beam end corbel has a steel support body, and the lower parts of the two ends of the steel support body are respectively Two connecting parts are provided, and the two connecting parts are respectively connected to the ends of the two butted steel box girders.

一实施方式中,所述临时悬挂连接装置为沿两个对接的钢箱梁端部分布设置的三个梁端牛腿。In one embodiment, the temporary suspension connection device is three beam end corbels distributed along the ends of two butt steel box girders.

一实施方式中,所述钢支撑主体的两端下部焊接固定两个连接部,其一端的连接部为固定连接部,该钢支撑主体通过该固定连接部与一钢箱梁的端部固定连接。In one embodiment, the lower parts of both ends of the steel supporting body are welded and fixed to two connecting parts, and the connecting part at one end is a fixed connecting part, and the steel supporting body is fixedly connected to the end of a steel box girder through the fixed connecting part .

另一实施方式中,所述钢支撑主体另一端的连接部为钢支撑支点,该钢支撑主体通过该钢支撑支点与一钢箱梁的端部悬挂支撑连接。In another embodiment, the connecting part at the other end of the steel support body is a steel support fulcrum, and the steel support body is connected to the end of a steel box girder by suspension support through the steel support fulcrum.

该大型钢箱梁架设的临时悬挂连接装置可在钢箱梁吊装前进行预先安装,梁端牛腿通过一段的连接部即固定连接部与待吊装安装的钢箱梁的端部固定连接,例如可以为销接或锚固连接。前述钢箱梁的端部共分布设置有三个梁端牛腿,梁端牛腿另一端的钢支撑支点与已经安装固定的钢箱梁的相邻端之间进行对接时,待吊装安装的钢箱梁的端部在重力作用下,通过钢支撑点临时悬挂支撑在该已安装固定的钢箱梁的相邻端部。梁端牛腿的钢支撑主体作为两个钢箱梁之间的力传递工具,同时还可以作为待安装钢箱梁进行精确调位时的反力架。The temporary suspension connection device erected by the large steel box girder can be pre-installed before the steel box girder is hoisted, and the beam end corbel is fixedly connected to the end of the steel box girder to be hoisted and installed through a section of the connection part, that is, the fixed connection part, for example Can be pinned or anchored. The ends of the aforementioned steel box girders are distributed with three beam end corbels. When the steel supporting fulcrum at the other end of the beam end corbels is docked with the adjacent end of the installed and fixed steel box girder, the steel box girder to be hoisted and installed Under the action of gravity, the end of the box girder is temporarily suspended and supported on the adjacent end of the installed and fixed steel box girder through the steel support point. The steel supporting body of the corbel at the beam end is used as a force transmission tool between the two steel box girders, and can also be used as a counter force frame when the steel box girder to be installed is precisely adjusted.

本实用新型的有益效果在于,该大型钢箱梁架设的临时悬挂连接装置结构设计合理、操作简单方便,其能够满足大型钢箱梁在吊装架设时的临时悬挂预定位,为大型钢箱梁的位置调整提供了稳定且不受限的条件。该临时悬挂连接装置借助前端固定的大型钢箱梁的端部,安全有效地实现了吊装架设的大型钢箱梁的临时悬挂连接。The beneficial effect of the utility model is that the temporary suspension connection device for the erection of the large steel box girder has a reasonable structural design and simple and convenient operation, which can meet the temporary suspension pre-positioning of the large steel box girder during hoisting and erection. Position adjustments provide stable and unrestricted conditions. The temporary suspension connection device safely and effectively realizes the temporary suspension connection of the hoisted and erected large steel box girder by means of the end of the large steel box girder fixed at the front end.

下面结合附图和具体实施方式对本实用新型做进一步的阐述。Below in conjunction with accompanying drawing and specific embodiment, the utility model is further elaborated.

附图说明Description of drawings

图1是本实用新型具体实施方式的应用结构示意图;Fig. 1 is the application structure schematic diagram of the specific embodiment of the present utility model;

图2是本实用新型具体实施方式的另一方位应用结构示意图。Fig. 2 is a structural schematic diagram of another orientation application of the specific embodiment of the utility model.

具体实施方式Detailed ways

如图1和图2所示,该大型钢箱梁架设的临时悬挂连接装置包括三个梁端牛腿30、40和50,沿两个对接的钢箱梁10和20端部分布设置。梁端牛腿50具有一钢支撑主体52,该钢支撑主体的两端下部分别设置两个连接部,该两个连接部分别与两个对接的钢箱梁端部连接。钢支撑主体52的两端下部焊接固定两个连接部,其一端的连接部为固定连接部51,该钢支撑主体52通过该固定连接部51与一钢箱梁10的端部固定连接。钢支撑主体52另一端的连接部为钢支撑支点53,该钢支撑主体通过该钢支撑支点53与一钢箱梁20的端部悬挂支撑连接。As shown in FIGS. 1 and 2 , the temporary suspension connection device erected by the large steel box girder includes three beam end corbels 30 , 40 and 50 , which are distributed along the ends of the two butted steel box girders 10 and 20 . The beam end corbel 50 has a steel support main body 52, two connecting parts are respectively arranged at the lower parts of the two ends of the steel supporting main body, and the two connecting parts are respectively connected with the ends of two butted steel box girders. The lower parts of both ends of the steel support body 52 are welded and fixed with two connection parts, and the connection part at one end is a fixed connection part 51 , and the steel support body 52 is fixedly connected with the end of a steel box girder 10 through the fixed connection part 51 . The connecting part of the other end of the steel support body 52 is a steel support fulcrum 53 , and the steel support body is connected to the end of a steel box girder 20 by hanging support through the steel support fulcrum 53 .

Claims (4)

1.一种大型钢箱梁架设的临时悬挂连接装置,其特征在于所述临时悬挂连接装置包括至少一梁端牛腿,该梁端牛腿具有一钢支撑主体,该钢支撑主体的两端下部分别设置两个连接部,该两个连接部分别与两个对接的钢箱梁端部连接。1. A temporary suspension connection device erected by a large steel box girder is characterized in that the temporary suspension connection device comprises at least one beam end corbel, and the beam end corbel has a steel support main body, and the two ends of the steel support main body The lower part is respectively provided with two connection parts, and the two connection parts are respectively connected with the ends of two butt-connected steel box girders. 2.根据权利要求1所述的大型钢箱梁架设的临时悬挂连接装置,其特征在于所述临时悬挂连接装置为沿两个对接的钢箱梁端部分布设置的三个梁端牛腿。2. The temporary suspension connection device for erecting a large steel box girder according to claim 1, characterized in that the temporary suspension connection device is three beam end corbels distributed along the ends of two butted steel box girders. 3.根据权利要求1所述的大型钢箱梁架设的临时悬挂连接装置,其特征在于所述钢支撑主体的两端下部焊接固定两个连接部,其一端的连接部为固定连接部,该钢支撑主体通过该固定连接部与一钢箱梁的端部固定连接。3. The temporary suspension connecting device erected by a large steel box girder according to claim 1, characterized in that the two ends of the steel supporting body are welded and fixed to two connecting parts, and the connecting part at one end is a fixed connecting part. The steel supporting body is fixedly connected with the end of a steel box girder through the fixed connection part. 4.根据权利要求3所述的大型钢箱梁架设的临时悬挂连接装置,其特征在于所述钢支撑主体另一端的连接部为钢支撑支点,该钢支撑主体通过该钢支撑支点与一钢箱梁的端部悬挂支撑连接。4. The temporary suspension connecting device erected by large steel box girder according to claim 3, characterized in that the connecting part at the other end of the steel supporting body is a steel supporting fulcrum, and the steel supporting body is connected with a steel supporting fulcrum through the steel supporting fulcrum. The ends of the box girder are connected by suspension supports.
CN201520095043.2U 2015-02-10 2015-02-10 The interim suspension connection device of Large Steel box beam erection Expired - Lifetime CN204455850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520095043.2U CN204455850U (en) 2015-02-10 2015-02-10 The interim suspension connection device of Large Steel box beam erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520095043.2U CN204455850U (en) 2015-02-10 2015-02-10 The interim suspension connection device of Large Steel box beam erection

Publications (1)

Publication Number Publication Date
CN204455850U true CN204455850U (en) 2015-07-08

Family

ID=53662759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520095043.2U Expired - Lifetime CN204455850U (en) 2015-02-10 2015-02-10 The interim suspension connection device of Large Steel box beam erection

Country Status (1)

Country Link
CN (1) CN204455850U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447674A (en) * 2017-09-19 2017-12-08 中铁上海工程局集团有限公司 A kind of steel box arch rib lifting positioner and its construction method
CN110373993A (en) * 2019-08-13 2019-10-25 中铁二院工程集团有限责任公司 A kind of control railroad bridge end deformation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447674A (en) * 2017-09-19 2017-12-08 中铁上海工程局集团有限公司 A kind of steel box arch rib lifting positioner and its construction method
CN110373993A (en) * 2019-08-13 2019-10-25 中铁二院工程集团有限责任公司 A kind of control railroad bridge end deformation device

Similar Documents

Publication Publication Date Title
CN101672011B (en) Steel tube arch rib vertical lifting method
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
CN101078198B (en) Steel box beam erection method for self-anchored suspension bridge
CN103911956B (en) A kind of large span stayed-cable bridge steel truss girder mounting method
CN103243658B (en) The spelling method of cable stayed bridge dragging suspension basket
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN204455850U (en) The interim suspension connection device of Large Steel box beam erection
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN204455847U (en) The marine positioning guiding device of the prefabricated pier of large-tonnage
CN202380403U (en) Integral hoisting system of arch rib of arch bridge
CN103422436B (en) Construction method for utilizing corrugated steel webs to bear construction load
CN104963410B (en) Beam column of steel structure is slidably connected node
CN204455862U (en) A kind of steel box-girder seam angle rackwork
CN202347884U (en) Overhaul platform for water turbine
CN204325940U (en) A kind of large span arch bridge non-support cable crane system construction pylon
CN207581213U (en) A kind of ceiling mounted tracks composite beam
CN203846402U (en) Steel-concrete superposed beam top plate support-free construction device
CN205804181U (en) Cable stayed Bridge Main Tower district steel box-girder installs auxiliary girder erection crane base
CN206359894U (en) Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
CN104961058A (en) Double-Z-type supporting steel girder, crane supporting component with same and use method
CN108625275A (en) A kind of stiffening girder of suspension bridge section installation method
CN204455848U (en) The installation positioning system of large-scale steel box-girder
CN204455869U (en) A kind of sections pier shaft docking operation workbench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150708