CN201943336U - Scaffold - Google Patents
Scaffold Download PDFInfo
- Publication number
- CN201943336U CN201943336U CN2011200188879U CN201120018887U CN201943336U CN 201943336 U CN201943336 U CN 201943336U CN 2011200188879 U CN2011200188879 U CN 2011200188879U CN 201120018887 U CN201120018887 U CN 201120018887U CN 201943336 U CN201943336 U CN 201943336U
- Authority
- CN
- China
- Prior art keywords
- flange
- longitudinal rod
- transverse bar
- scaffold
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model relates to a scaffold which comprises a lengthways rod and crosswise rods which are horizontally connected with the lengthways rod. The scaffold is characterized in that the peripheral part of the lengthways rod is fixedly connected with a raised plate, the raised plate is provided with inserting ports, the connection end parts of the crosswise rods are provided with a bolt which is vertical to the crosswise rods and can be inserted into the inserting ports of the raised plate; the structure can be provided with rods at any direction in the same plane and solves the architectural problem of an irregular architectural body.
Description
Technical field
The utility model relates to a kind of scaffold, is applicable to building field.
Background technology
Scaffold refers to that the job site is operated and solve vertical for the workman and level is transported the various supports of setting up.The generic term on building circle refers to be used on the building site the higher place that can't directly construct of exterior wall, interior decoration or floor height.Mainly working up and down for the constructor or maintenance of peripheral safety net and high-altitude installation component etc., is exactly to build a framework frankly speaking, and the scaffold manufacturing materials has usually: bamboo and wood, steel pipe or synthetic materials etc.Some engineering is also used when template with scaffold, and departments such as this external advertising, municipal administration, traffic road and bridge, mine also extensively are used.
The total trend of scaffold is towards high-strength light structure, standardization, assemblingization and multifunctional direction development, rather than with regard to us common level and vertical both direction direction.
Summary of the invention
The purpose of this utility model is to provide a kind of scaffold, and this structure can all be provided with rod member on conplane any direction, solved the difficult problem of the building of irregular building body.
Of the present utility model being characterised in that: a kind of scaffold, comprise the transverse bar that longitudinal rod and along continuous straight runs are connected with longitudinal rod, it is characterized in that: described longitudinal rod peripheral part is fixedly connected with flange, offer socket on the described flange, be connected with perpendicular and can be bumped on the latch of flange socket on the connection end of described transverse bar with transverse bar.
In the utility model one preferred embodiment, the cross section of described latch is convex, and described latch and flange socket are skewed at the fitting face of longitudinal rod axial direction.
In the utility model one preferred embodiment, described longitudinal rod upper shed diameter is greater than the under shed diameter.
In the utility model one preferred embodiment, the connection end opposite side peripheral part of described transverse bar is fixedly connected with flange.
Advantage of the present utility model: structure design novelty, solved the connected mode that common scaffold has only level and vertical both direction direction, can realize the connection on multi-direction, not only can reduce the complexity that adds man-hour, also reduced the use of unnecessary material, save cost, had good practicability.
Description of drawings
Fig. 1 is the organigram of the utility model embodiment.
Fig. 2 is the upward view of Fig. 1.
Fig. 3 is the organigram of the described flange of the utility model embodiment.
Fig. 4 is the A-A sectional view of Fig. 3.
Fig. 5 is the structure front view of the described transverse bar of the utility model embodiment.
Fig. 6 is the structure vertical view of the described transverse bar of the utility model embodiment.
Fig. 7 is the organigram of another embodiment of the utility model.
Among the figure: 1 is longitudinal rod; 2 is transverse bar; 3 is flange; 2-1 is the connection end of transverse bar; 2-2 is a latch; 3-1 is the flange socket.
The specific embodiment
For above-mentioned feature and advantage of the present utility model can be become apparent, embodiment cited below particularly, and cooperate appended graphic being described in detail below.
With reference to legend, a kind of scaffold, comprise the transverse bar 2 that longitudinal rod 1 and along continuous straight runs are connected with longitudinal rod 1, it is characterized in that: described longitudinal rod 1 peripheral part is fixedly connected with flange 3, offer socket 3-1 on the described flange 3, be connected with perpendicular and can be bumped into flange 3 and insert on the latch 2-2 of 3-1 mouths on the connection end 2-1 of described transverse bar 2 with transverse bar 2.
In the utility model one preferred embodiment, the cross section of described latch 2-2 is convex, and described latch 2-2 and flange 3 socket 3-1 are skewed at the fitting face of longitudinal rod 1 axial direction.
In the utility model one preferred embodiment, in order to make the better practicality and stable that is connected between the longitudinal rod, described longitudinal rod 1 upper shed diameter is greater than the under shed diameter.
In the utility model one preferred embodiment, in order to allow same plane different directions all be connected with rod member, the connection end 2-1 opposite side peripheral part of described transverse bar 2 is fixedly connected with flange 3.
The utility model can be arranged on the transverse bar upper protruding block in transverse bar direction in the radial direction by adjustment, the rod member that is connected with latch is inserted in the socket of projection, can realize all being provided with rod member on the different directions of same plane.
The above only is preferred embodiment of the present utility model, and all equalizations of being done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.
Claims (4)
1. scaffold, comprise the transverse bar that longitudinal rod and along continuous straight runs are connected with longitudinal rod, it is characterized in that: described longitudinal rod peripheral part is fixedly connected with flange, offer socket on the described flange, be connected with perpendicular and can be bumped on the latch of flange socket on the connection end of described transverse bar with transverse bar.
2. scaffold according to claim 1 is characterized in that: the cross section of described latch is convex, and described latch and flange socket are skewed at the fitting face of longitudinal rod axial direction.
3. scaffold according to claim 1 is characterized in that: described longitudinal rod upper shed diameter is greater than the under shed diameter.
4. scaffold according to claim 1 is characterized in that: the connection end opposite side peripheral part of described transverse bar is fixedly connected with flange.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200188879U CN201943336U (en) | 2011-01-21 | 2011-01-21 | Scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200188879U CN201943336U (en) | 2011-01-21 | 2011-01-21 | Scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201943336U true CN201943336U (en) | 2011-08-24 |
Family
ID=44470685
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200188879U Expired - Fee Related CN201943336U (en) | 2011-01-21 | 2011-01-21 | Scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201943336U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102134905A (en) * | 2011-01-21 | 2011-07-27 | 黄明光 | Scaffold |
-
2011
- 2011-01-21 CN CN2011200188879U patent/CN201943336U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102134905A (en) * | 2011-01-21 | 2011-07-27 | 黄明光 | Scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204126230U (en) | Assembly scaffold unit | |
CN105113659A (en) | Prefabrication wall of prefabricated house | |
CN204676697U (en) | A kind of steel structure frame of house | |
CN204475593U (en) | Support structure installed by a kind of curtain wall | |
CN203097248U (en) | Integral type flexible scaffold | |
CN201943336U (en) | Scaffold | |
CN102134905A (en) | Scaffold | |
CN204940608U (en) | The prefabrication and lifting body of wall of fabricated structure | |
CN204940585U (en) | The precast wall body of assembled-type house | |
CN104763142A (en) | Aluminum template back arris system | |
CN205875655U (en) | Scaffold | |
CN201125568Y (en) | Assembled type sectional material guard rail | |
CN203603457U (en) | Deformation joint steel formwork and deformation joint formwork assembly | |
CN206667589U (en) | A kind of band hole assembling type outer wall construction | |
CN105113701A (en) | Prefabricated wall of assembled building | |
CN205012641U (en) | Connecting elements convenient to scaffold dismouting | |
CN201474283U (en) | Composite outer hanger bracket for construction | |
CN201972389U (en) | Wall-mounted cantilever scaffold | |
CN105178447B (en) | The concealed energy consumption connector of rectangular-ambulatory-plane timber structure | |
CN202144417U (en) | Novel elevator cab wall structure | |
CN202248842U (en) | Fastener for steel pipe scaffold | |
CN204940679U (en) | The precast wall body of fabricated structure | |
CN204728541U (en) | Frame type lifting curtain wall | |
CN103615106B (en) | Scaffold | |
CN204326518U (en) | Anti-slipping scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110824 Termination date: 20130121 |