CN201474283U - Composite outer hanger bracket for construction - Google Patents

Composite outer hanger bracket for construction Download PDF

Info

Publication number
CN201474283U
CN201474283U CN200920171704XU CN200920171704U CN201474283U CN 201474283 U CN201474283 U CN 201474283U CN 200920171704X U CN200920171704X U CN 200920171704XU CN 200920171704 U CN200920171704 U CN 200920171704U CN 201474283 U CN201474283 U CN 201474283U
Authority
CN
China
Prior art keywords
bolt
wall
frame
operating platform
hanger bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920171704XU
Other languages
Chinese (zh)
Inventor
龙绍章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huashi Group Cooperation Limited
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN200920171704XU priority Critical patent/CN201474283U/en
Application granted granted Critical
Publication of CN201474283U publication Critical patent/CN201474283U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a composite outer hanger bracket for a construction, which belongs to the technical field of construction components, and mainly comprises an operating platform frame, a bearing frame, a frame body connecting bolt, a normal connecting bolt and a wall-threading bolt. The composite outer hanger bracket is characterized in that the operating platform frame and the bearing frame are connected with the bolt through the frame body and are pivoted with the normal connecting bolt in a crossing way, thereby forming an integral body, and the composite outer hanger bracket is fixed with a wall body together through the wall-threading bolt, and a constructed externally-hung operation platform is supplied through paving a scaffold board. Compared with the prior art, the composite outer hanger bracket has simple structure, convenient use, safety, reliability, high automatic degree and excellent revolving, can be matched with a normal outer frame, saves labor and material, and is economic and practical.

Description

Compound pylon for building
[technical field]
The utility model relates to the plug-in operating platform frame of a kind of building operations, belongs to the technical field of building operations member.
[background technology]
At present, in China's building operations, narrow balcony, air-conditioning plate, flare window place be because of can't installing common pylon, required operating platform frame during high-building construction, general steel pipe frame or the oblique mode such as builder's jack set up that adopt.Tradition is set up mode and is diffusing tearing open of loosing, and installation is comparatively complicated, and intensity and stability are also relatively poor, not only influence construction speed, and the wasting manpower and material resources also easily forms potential safety hazard, and the above defective value must improve.
[utility model content]
For accelerating the engineering construction progress, standardization level in the raising work progress is to eliminate the potential safety hazard in traditional form of construction work, the utility model provides a kind of compound pylon for building, not only quick construction is convenient, and the standardization level height is safe and reliable, and can wholely promote, simple to operate, time saving and energy saving, practical.
The technical solution of the utility model is as described below: it mainly is made up of operating platform and bracing frame, support body connecting bolt, common connecting bolt, through-wall bolt five parts, it is characterized in that, operating platform frame and support are set a roof beam in place and are partly passed through the intersection bolt of support body connecting bolt, common connecting bolt, form an integral body, on bracing frame, be provided with the through-wall bolt hole, by through-wall bolt compound pylon and body of wall are fixed together, operating platform frame upper berth scaffold floor is as construction operation platform.
The utility model according to said structure, bracing frame is arranged two-layer at the building structure body of wall, consecutive number Pin operating platform frame is connected with fastener by steel pipe, can wholely promote, be affiliated on the bracing frame that has fixed by the gib head on the operating platform frame, fixing reliable by support body connecting bolt and common connecting bolt again.
The utility model compared with prior art, the beneficial effects of the utility model are that it is simple in structure, and are easy to use, safe and reliable, and can be used with common outrigger, the standardization level height, turnover property is good, use manpower and material resources sparingly, economical and practical, accelerating construction progress greatly is ideal that narrow balcony in the building operations, air-conditioning plate, exterior window etc. the are located plug-in operating platform of constructing.
[description of drawings]
The utility model is described in further detail below in conjunction with the accompanying drawing example.
Fig. 1 is compound pylon overall structure schematic diagram;
Fig. 2 is compound pylon split structural representation;
Fig. 3 is a compound pylon embodiment schematic diagram 1 (when using the position as body of wall);
Fig. 4 is a compound pylon embodiment schematic diagram 2 (when using the position as the hole).
Among Fig. 1, the utility model mainly is made up of operating platform frame (1) and bracing frame (2), support body connecting bolt (3), generic connectivity bolt (4), through-wall bolt (5) five parts. It is characterized in that operating platform frame (1) and bracing frame (2) are by the intersection bolt of support body connecting bolt (3), generic connectivity bolt (4), form an integral body, be provided with the through-wall bolt hole at bracing frame (2), through-wall bolt (5) passes the through-wall bolt hole composite outer hanger bracket and body of wall is fixed together, behind the scaffold board of operating platform frame (1) upper berth as plug-in construction operation platform.
Among Fig. 3, use the position to be body of wall, through-wall bolt (5) utilizes the upper track of body of wall and interim orbit through-wall bolt hole that composite outer hanger bracket and body of wall are fixed, behind the scaffold board of operating platform frame (1) upper berth as plug-in construction operation platform.
Among Fig. 4, use the position to be door-window opening, the centre does not have body of wall, the scene needs do built-in fitting when lower floor's floor is built, composite outer hanger bracket upper end utilizes the upper track through-wall bolt hole of body of wall to fix by through-wall bolt (5), the lower end utilizes built-in fitting to fix, behind the scaffold board of operating platform frame (1) upper berth as plug-in construction operation platform.
[specific embodiment]
Below in conjunction with accompanying drawing the utility model is further described:
Please referring to relevant accompanying drawing, compound pylon for building of the present utility model is mainly by operating platform frame (1) and bracing frame (2), support body connecting bolt (3), common connecting bolt (4), through-wall bolt (5) five parts are formed, it is characterized in that, operating platform frame (1) and bracing frame (2) beam are partly by support body connecting bolt (3), the intersection bolt of common connecting bolt (4), form an integral body, on bracing frame (2), be provided with the through-wall bolt hole, by through-wall bolt (5) compound pylon and body of wall are fixed together, operating platform frame (1) upper berth scaffold floor is as construction operation platform.
Bracing frame (2) is arranged two-layer at the building structure body of wall, consecutive number Pin operating platform frame (1) is connected with fastener by steel pipe, can wholely promote, be affiliated on the bracing frame that has fixed (2) by the gib head on the operating platform frame (1), fixing reliable by support body connecting bolt (3) and common connecting bolt (4) again.
Hole bracing frame (6) is the structural shape that bracing frame (2) uses at the door and window hole position, the same bracing frame of mode of occupation (2).

Claims (1)

1. compound pylon for building, it mainly is made up of operating platform and bracing frame, support body connecting bolt, common connecting bolt, through-wall bolt five parts, it is characterized in that, operating platform frame and support are set a roof beam in place and are partly passed through the intersection bolt of support body connecting bolt, common connecting bolt, form an integral body, be provided with the through-wall bolt hole on bracing frame, by through-wall bolt compound pylon and body of wall be fixed together, operating platform frame upper berth scaffold floor is as construction operation platform.
CN200920171704XU 2009-04-23 2009-04-23 Composite outer hanger bracket for construction Expired - Lifetime CN201474283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920171704XU CN201474283U (en) 2009-04-23 2009-04-23 Composite outer hanger bracket for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920171704XU CN201474283U (en) 2009-04-23 2009-04-23 Composite outer hanger bracket for construction

Publications (1)

Publication Number Publication Date
CN201474283U true CN201474283U (en) 2010-05-19

Family

ID=42410529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920171704XU Expired - Lifetime CN201474283U (en) 2009-04-23 2009-04-23 Composite outer hanger bracket for construction

Country Status (1)

Country Link
CN (1) CN201474283U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103836317A (en) * 2013-12-19 2014-06-04 柳州市京阳节能科技研发有限公司 Simple safety box wall-hanging rack
CN104975707A (en) * 2014-04-04 2015-10-14 吴庆豪 Shed frame and triangular support frame body of shed frame
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103836317A (en) * 2013-12-19 2014-06-04 柳州市京阳节能科技研发有限公司 Simple safety box wall-hanging rack
CN104975707A (en) * 2014-04-04 2015-10-14 吴庆豪 Shed frame and triangular support frame body of shed frame
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof

Similar Documents

Publication Publication Date Title
CN209924120U (en) Assembled light steel frame structure building system
CN201474283U (en) Composite outer hanger bracket for construction
CN201762038U (en) Tower crane climbing support hinge bearing
CN201221194Y (en) Postposition pre-embedded type wall connecting components
CN206128287U (en) Assembled wing -room
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN205276504U (en) Beam -column connecting joint of activity board house
CN208294053U (en) Attachment type raise scaffold protecting screen structure
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN206667589U (en) A kind of band hole assembling type outer wall construction
CN2641209Y (en) Composite type externally hung frame
CN215332980U (en) Evacuation platform support in circular tunnel interval
CN203889956U (en) Rod-attached-to-wall connecting piece device for tower crane mounting
CN214462400U (en) A bracket structure for fixing double-deck protection frame
CN210563347U (en) Template supporting structure without window under outer eaves overhanging plate
CN210032102U (en) Support for mounting external hanging piece of building
CN200999454Y (en) Integral cross brace connected building construction gate type scaffold
CN207363065U (en) Curtain skeleton connects system
CN201474192U (en) Water flanged board joint structure
CN201588414U (en) Supporting structure for framework scaffolds
CN212027070U (en) Telescopic construction elevator that can have enough to meet need attaches wall fixed bolster
CN207228708U (en) A kind of folding communication computer room
CN221298564U (en) Scaffold external corner part suspension member
CN203175015U (en) Indoor/outdoor universal door-type scaffold
CN206504285U (en) Lamp-mounting structure and Novel inserting connection type building body suitable for novel building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SICHUAN HUASHI GROUP CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20101216

Address after: Futian District Hongli west of Shenzhen City, Guangdong province 518000 No. 7024 Luban building 14, 15 storey office

Co-patentee after: Sichuan Huashi Group Cooperation Limited

Patentee after: China Huashi Enterprises Company Limited

Address before: Futian District Hongli west of Shenzhen City, Guangdong province 518000 No. 7024 Luban building 14, 15 storey office

Patentee before: China Huashi Enterprises Company Limited

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100519