CN201935686U - Relative-settlement observation device for large building foundation - Google Patents

Relative-settlement observation device for large building foundation Download PDF

Info

Publication number
CN201935686U
CN201935686U CN2011200278644U CN201120027864U CN201935686U CN 201935686 U CN201935686 U CN 201935686U CN 2011200278644 U CN2011200278644 U CN 2011200278644U CN 201120027864 U CN201120027864 U CN 201120027864U CN 201935686 U CN201935686 U CN 201935686U
Authority
CN
China
Prior art keywords
rotating shaft
connecting rod
bull stick
settlement observation
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200278644U
Other languages
Chinese (zh)
Inventor
王红卫
李芝巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200278644U priority Critical patent/CN201935686U/en
Application granted granted Critical
Publication of CN201935686U publication Critical patent/CN201935686U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model relates to a settlement observation method and a settlement observation device for large-construction engineering. The relative-settlement observation device for large building foundation comprises an embedded part, a transmission mechanism and a signal indication mechanism, wherein the transmission mechanism comprises a telescopic rotating rod, a rotating shaft, a vertically arranged protection pipe and a rigid connecting rod arranged inside the protection pipe; one end of the rigid connecting rod is fixedly connected to the embedded part embedded into the foundation, while the other end of the rigid connecting rod is hinged with one end of the telescopic rotating rod; the telescopic rotating rod is vertical to the rotating shaft and the other end of the telescopic rotating rod is fixed on the rotating shaft; the signal indication mechanism comprises a laser indicator and a corresponding projection screen arranged at the radial position of the rotating shaft; a shaft seat of the transmission mechanism and the signal indication mechanism are correspondingly installed on the load pile foundation bearing platform structure; deformation quantity generated by the embedded part as the pile foundation sinks is transmitted to the signal indication mechanism through the transmission mechanism; and then the signal indication mechanism displays the settlement quantity or the settlement quantity is calculated or deducted by the signal displayed by the signal indication mechanism. In the utility model, the display is visualized, the operation and the maintenance are simple and reliable, and people can detect the settlement quantity of building timely and accurately.

Description

Heavy construction basis relative settlement observation device
Technical field
The utility model relates to building engineering field, is specifically related to a kind of heavy construction basis relative settlement observation procedure and building foundation relative settlement observation device.
Background technology
Along with the development of industry with the covil construction industry, various complexity and large-scale engineering works is increasing, the construction of engineering works has changed the original state in ground, and the ground for buildings has applied certain pressure, and this just will inevitably cause ground and the distortion on stratum on every side.For the normal serviceable life that guarantees buildings or structures and the security of buildings or structures, and for later observation maintenance and repairing construction provide reliable data and corresponding sedimentation parameter, the necessity of buildings or structures settlement observation and importance are obvious further.Current specifications stipulates that also high-rise, towering structure, important heritage buildings and continuous production equipment basis, power-equipment basis, landslide monitoring etc. all will carry out settlement observation.Especially in the high-story architecture construction process, use the monitoring of settlement observation intensifies process, instruct rational working procedure, non-uniform settling appears in prevention in work progress, timely feedback information, department provides detailed first-hand data for the prospective design construction, avoids causing enormous economic loss because of the sedimentation reason causes the destruction of constructure body structure or the crack of the structure functions of use that exerts an influence.
In the past by setting up settlement observation point to observe, often destroyed because of variation, the observation station of reference point, do not have reasons such as the special messenger is responsible for, can not in time find the generation of sedimentation, after bringing huge life and property loss for production or life, just draw attention, pay through the nose to handle funeral affairs, and deal with very thorny.
Summary of the invention
The technical problems to be solved in the utility model provide a kind of performance accurately and reliably, working service is simple and display mode is simple and clear settlement observer, the method that this device carries out building settlement observation of using also is provided.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, described conduction mechanism comprises telescopic bull stick, driving gear set and the pillar that vertically is provided with, the rigidity connecting rod, described driving gear set comprises intermeshing pinion wheel, gear wheel and corresponding rotating shaft and axle bed thereof, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, perpendicular and its other end of this telescopic bull stick and the corresponding rotating shaft of described pinion wheel is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described gear wheel correspondence.
The radius of described gear wheel is the integral multiple of pinion wheel radius.
Another kind of heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, described conduction mechanism comprises telescopic bull stick, transmission gear and corresponding rotating shaft and axle bed and the vertical pillar that is provided with, the rigidity connecting rod, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, perpendicular and its other end of this telescopic bull stick and the corresponding rotating shaft of described transmission gear is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described transmission gear correspondence.
Another heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, described conduction mechanism comprises telescopic bull stick, rotating shaft and axle bed and the pillar that vertically is provided with, the rigidity connecting rod, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, this telescopic bull stick and rotating shaft is perpendicular and its other end is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described rotating shaft.
Above-mentioned heavy construction basis relative settlement observation device also can be provided with electric signal processes and displays mechanism, it comprises potentiometer, AD conversion unit, arithmetic element, D/A conversion unit, the data transmission/display unit that connects successively, described potentiometer is installed described rotating shaft one end, is used to gather the settling amount data.
Described projection screen subscript is shown with scale.
It is as follows to utilize above-mentioned settlement observer to carry out the method for heavy construction basis relative settlement observation:
(1) at the settlement observation point of laying nearby every 2~3 pile base positions;
(2) later stage of foundation construction, beat cushion cap before, the pre-buried underloading that is fixed in the construction work of the built-in fitting in the above-mentioned settlement observer is rammed in the base;
(3) bury the pillar on vertical connection ground underground directly over built-in fitting, described rigidity connecting rod is installed in the pillar, the axle bed of described conduction mechanism and signal indicating mechanism are accordingly nearby " be installed on the heavy load pile foundation support table framework;
(4) described built-in fitting rams the base sinking with underloading, and the sedimentation variable that is produced with respect near heavily loaded pile foundation support table framework passes to signal indicating mechanism through conduction mechanism, shows settling amount by it, perhaps calculates or extrapolate corresponding settling amount by its shows signal.
The utlity model has actively useful effect:
1. can make people detect the settling amount of buildings in time, accurately, its dependable performance, working service is simple;
2. the settling amount display mode is simple and clear, and the observation method of operating is simple;
3. by different distortion, can realize the measurement that heavy construction sedimentation, the sedimentation of embankment lateral bending, massif slide respectively, after adding electric signal processes and displays mechanism, can regularly finish packing, storage, the transmission of file, can make the professional for a long time the settling amount of these tested civil engineering works be carried out promptly and accurately detection.
Description of drawings
Fig. 1 is a kind of structural representation of large-scale construction engineering settlement observer;
Fig. 2 is a kind of vertical view of large-scale construction engineering settlement observer;
Fig. 3 is the vertical view of another kind of large-scale construction engineering settlement observer;
Fig. 4 is a kind of electric signal handling principle block scheme of large-scale construction engineering settlement observer.
1 is built-in fitting among the figure, and 2 is the rigidity connecting rod, and 3 is pillar, and 4 is telescopic bull stick, and 5 is pinion wheel, and 6 is gear wheel, and 7 is laser pen, and 8 is projection screen, and 9,13,14,15 are rotating shaft, and 10 is potentiometer, and 11,12 is axle bed.
Embodiment
1 one kinds of heavy construction bases of embodiment relative settlement observation device, referring to Fig. 1, Fig. 2, Fig. 4, comprise built-in fitting 1, conduction mechanism, signal indicating mechanism, electric signal processes and displays mechanism, described conduction mechanism comprises telescopic bull stick 4, driving gear set and the pillar (Φ 200mm steel pipe) 3 that vertically is provided with, rigidity connecting rod (Φ 50mm rigidity round bar) 2, driving gear set comprises intermeshing pinion wheel 5, gear wheel 6 and corresponding rotating shaft 14 thereof, 9 with axle bed 12,11, rigidity connecting rod 2 freely is slidingly mounted in the pillar 3, the one end is fixedlyed connected with built-in fitting 1, the other end then is movably hinged with an end of telescopic bull stick 4, perpendicular and its other end of the corresponding rotating shaft of telescopic bull stick 4 and pinion wheel 5 14 is fixed in this rotating shaft 14, signal indicating mechanism comprises laser pen 7 and projection screen corresponding with it 8, and this laser pen 7 is installed in the radial position of gear wheel 6 correspondences.The power control switch of laser pen 7 on the housing face-plate of this device, when the supervisory personnel behind the locality, Push switch just can be seen hot spot on projection screen 8, hot spot downwards or left, what all reflect to the right is the direction of settlement of foundation; Electric signal processes and displays mechanism comprises potentiometer 10, AD conversion unit, arithmetic element, D/A conversion unit, the data transmission/display unit that connects successively, and potentiometer 10 is installed described rotating shaft one end, is used to gather the settling amount data.Can become 0~5V or 4~20mA point signal to the sedimentation signal through analog to digital conversion by above-said current signal processes and displays mechanism, be transformed into digital signal, calculate, through digital to analog conversion, show on computers or store by cable or optical fiber through computing machine; Also can become digital signal on the mobile phone that mobile phone signal sends to appointment.
Utilize above-mentioned settlement observer to carry out the method for heavy construction basis relative settlement observation:
(1) laying settlement observation point nearby every 2~3 pile base positions;
(2) later stage of foundation construction, beat cushion cap before, near the pre-buried underloading that is fixed on the selected observation station present position of step of the built-in fitting 1 of above-mentioned settlement observer is rammed in the earth foundation;
(3) directly over built-in fitting, bury the pillar on vertical connection ground underground, rigidity connecting rod 2 is installed, in the middle of the construction in the pillar, should set upright, can not tilt, otherwise can influence the measurement of true sedimentation, near the axle bed of conduction mechanism and signal indicating mechanism are installed on accordingly on the heavily loaded pile foundation support table framework;
(4) built-in fitting 1 rams the base sinking with ramming base with underloading, and the deformation quantity that is produced with respect near heavily loaded pile foundation support table framework passes to signal indicating mechanism through conduction mechanism, shows settling amount by it, is perhaps calculated or calculated settling amount by its shows signal.
Indicate some concentric circles scales on the projection screen 8, the radius of these circles is proportional, installs to the length of the telescopic bull stick in the device by debugging, can demarcate the unit of the radius of these circles, just can know concrete settling amount.Concrete calibrated and calculated method is as follows:
(1) do not take place under the situation of sedimentation, the connecting rod n of conduction device and the light source m of laser image forming apparatus on same axis, hot spot on the mid point of screen, the distance h=0mm of the hot spot heart placed in the middle;
(2) when sedimentation reaches L (not being 0), settling amount L, connecting rod raw footage n and connecting rod physical length n ,Just constitute a big right-angle triangle, angle α=arctan (L/n) between connecting rod original position and the physical location, the girth of pinion wheel is half of gear wheel, and the angle that gear wheel rotates is α/2, hot spot apart from screen center apart from former apart from the gear wheel center of l and screen apart from M, actual range m ,Just constitute a little right-angle triangle; Geometric relationship: l=M * tan (α/2) is arranged in the little triangle.
L in the formula: hot spot is apart from the distance of screen mid point; N: length of connecting rod; M: the distance of gear wheel centre distance screen; n ,: after sedimentation takes place, the length after connecting rod is elongated by reality.
(3) actual computation: the long 600mm of connecting rod n, hot spot is 10mm apart from orifice plate apart from M, when then foundation settlement L is 200mm, can draw on the screen hot spot apart from the distance of mid point.
With data substitution formula: α=arctan (L/n)=arctan (200/600)=18.4 °;
Get l=M * tan (α/2)=10 * tan (18.4/2)=1.62mm.
In debug phase or fabrication phase, as far as possible each distance is adjusted to the relation of ratio of integers conveniently to measure and to read.The calculating of side direction sedimentation deformation, the same with the vertical sedimentation displacement.
Because it is limited being subjected to the length of variable connecting rod, this has limited the measurement range of settlement measurement, can choose different variable length of connecting rods according to the difference of each project, the maximum length of variable connecting rod has very big relation with the ratio of minimum length and the measurement range of settlement measurement.Ratio is big more, and the scope of measurement is big more, and ratio is more little, and the scope of measurement is more little.
2 one kinds of heavy construction bases of embodiment relative settlement observation device, referring to Fig. 3, Fig. 4, comprise built-in fitting 1, conduction mechanism, signal indicating mechanism, electric signal processes and displays mechanism, conduction mechanism comprises telescopic bull stick 4, rotating shaft 13 and axle bed 15 and the pillar 3 that vertically is provided with, rigidity connecting rod 2, rigidity connecting rod 2 freely is slidingly mounted in the pillar 3, the one end is fixedlyed connected with built-in fitting 1, the other end then is movably hinged with an end of telescopic bull stick 4, perpendicular and its other end of this telescopic bull stick 4 and rotating shaft 13 is fixed in this rotating shaft 13, described signal indicating mechanism comprises laser pen 7 and projection screen corresponding with it 8, and this laser pen 7 is installed in the radial position of rotating shaft 13.Electric signal processes and displays mechanism comprises potentiometer 10, AD conversion unit, arithmetic element, AD conversion unit, the data transmission/display unit that connects successively, and potentiometer 10 is installed described rotating shaft one end, is used to gather the settling amount data.
3 one kinds of heavy construction bases of embodiment relative settlement observation device, substantially the same manner as Example 2, difference is: conduction mechanism comprises and also comprises a transmission gear that is installed in the described rotating shaft 15, and laser pen 7 is installed in the radial position of transmission gear.

Claims (6)

1. heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, it is characterized in that, described conduction mechanism comprises telescopic bull stick, driving gear set and the pillar that vertically is provided with, the rigidity connecting rod, described driving gear set comprises intermeshing pinion wheel, gear wheel and corresponding rotating shaft and axle bed thereof, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, perpendicular and its other end of this telescopic bull stick and the corresponding rotating shaft of described pinion wheel is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described gear wheel correspondence.
2. according to the described heavy construction of claim 1 basis relative settlement observation device, it is characterized in that the radius of described gear wheel is the integral multiple of pinion wheel radius.
3. heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, it is characterized in that, described conduction mechanism comprises telescopic bull stick, transmission gear and corresponding rotating shaft and axle bed and the vertical pillar that is provided with, the rigidity connecting rod, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, perpendicular and its other end of this telescopic bull stick and the corresponding rotating shaft of described transmission gear is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described transmission gear correspondence.
4. heavy construction basis relative settlement observation device, comprise built-in fitting, conduction mechanism, signal indicating mechanism, it is characterized in that, described conduction mechanism comprises telescopic bull stick, rotating shaft, axle bed and the pillar that vertically is provided with, the rigidity connecting rod, described rigidity connecting rod freely is slidingly mounted in this pillar, the one end is fixedlyed connected with described built-in fitting, the other end then is movably hinged with an end of described telescopic bull stick, this telescopic bull stick and rotating shaft is perpendicular and its other end is fixed in this rotating shaft, described signal indicating mechanism comprises laser designator and projection screen corresponding with it, and this laser designator is installed in the radial position of described rotating shaft.
5. according to claim 1,3 or 4 described heavy construction basis relative settlement observation devices, it is characterized in that, described settlement observer also is provided with electric signal processes and displays mechanism, it comprises potentiometer, AD conversion unit, arithmetic element, D/A conversion unit, the data transmission/display unit that connects successively, described potentiometer is installed described rotating shaft one end, is used to gather the settling amount data.
6. according to claim 1,3 or 4 described heavy construction basis relative settlement observation devices, it is characterized in that described projection screen subscript is shown with scale.
CN2011200278644U 2011-01-27 2011-01-27 Relative-settlement observation device for large building foundation Expired - Lifetime CN201935686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200278644U CN201935686U (en) 2011-01-27 2011-01-27 Relative-settlement observation device for large building foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200278644U CN201935686U (en) 2011-01-27 2011-01-27 Relative-settlement observation device for large building foundation

Publications (1)

Publication Number Publication Date
CN201935686U true CN201935686U (en) 2011-08-17

Family

ID=44447204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200278644U Expired - Lifetime CN201935686U (en) 2011-01-27 2011-01-27 Relative-settlement observation device for large building foundation

Country Status (1)

Country Link
CN (1) CN201935686U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051891A (en) * 2011-01-27 2011-05-11 王红卫 Device and method for observing relative settlement of huge building foundation
CN102798377A (en) * 2012-08-07 2012-11-28 张东光 Planar error measurement analysis system and method
CN105180895A (en) * 2015-09-17 2015-12-23 中国电建集团昆明勘测设计研究院有限公司 Device and method used for monitoring maximum settlement of concrete faced rockfill dam
CN107794956A (en) * 2017-10-31 2018-03-13 中国地质大学(武汉) A kind of dismountable scene soil fills in highly dynamic measurement apparatus and method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051891A (en) * 2011-01-27 2011-05-11 王红卫 Device and method for observing relative settlement of huge building foundation
CN102051891B (en) * 2011-01-27 2012-06-27 王红卫 Device and method for observing relative settlement of huge building foundation
CN102798377A (en) * 2012-08-07 2012-11-28 张东光 Planar error measurement analysis system and method
CN102798377B (en) * 2012-08-07 2014-07-09 张东光 Planar error measurement analysis system and method
CN105180895A (en) * 2015-09-17 2015-12-23 中国电建集团昆明勘测设计研究院有限公司 Device and method used for monitoring maximum settlement of concrete faced rockfill dam
CN107794956A (en) * 2017-10-31 2018-03-13 中国地质大学(武汉) A kind of dismountable scene soil fills in highly dynamic measurement apparatus and method
CN107794956B (en) * 2017-10-31 2023-02-28 中国地质大学(武汉) Detachable field soil plug height dynamic measurement device and method

Similar Documents

Publication Publication Date Title
CN102051891B (en) Device and method for observing relative settlement of huge building foundation
CN201935686U (en) Relative-settlement observation device for large building foundation
CN206768889U (en) A kind of subway foundation pit automates DEFORMATION MONITORING SYSTEM
CN210154614U (en) Foundation pit and settlement monitoring device of peripheral stratum thereof based on BIM
CN109839315A (en) Simulate the two-way sliding physical model case and Cross-fault leveling tunnel mechanics performance testing method in Cross-fault leveling tunnel
CN103175505B (en) Tunnel vault subsidence monitoring device and method
CN204286365U (en) Foundation pit side-wall displacement monitor
CN109187170B (en) Device and method for testing limit drawing of anchor plate under plane strain condition
CN103147466B (en) Automatic inclination measurement device for precast pile with rectangular or hollow rectangular cross section
CN111429575A (en) Three-dimensional visual monitoring method, system, equipment and storage medium
CN105446276B (en) A kind of foundation ditch axle power monitors compensation method
CN113802565B (en) Intelligent integrated monitoring system and method for foundation pit and structure in steelmaking workshop
CN203364814U (en) Differential settlement observation device for wind turbine foundation
CN109613212A (en) The experimental rig that simulation buried pipeline is influenced by tunnel excavation
CN113914386A (en) Intelligent monitoring method for deep foundation pit support safety based on BIM +3S technology
CN201206463Y (en) Depth measurement apparatus for rotary drill rig
CN2677881Y (en) Automatic measuring recording analysing device for strong rammer work parameter
CN206479166U (en) A kind of soil body deep settlement and pore water pressure measurement device
CN203190967U (en) Settlement monitoring device for tunnel vault
CN103195107B (en) Portable folding-type inclination survey device for precast pile with round or ring-shaped cross section
CN112685826B (en) Foundation structure construction method, device, equipment and readable storage medium
CN209962568U (en) Shield vertical shaft vertical jacking model test device
CN207923106U (en) A kind of foundation pit deformation measuring device
Jiao et al. Experimental research on a novel soil displacement monitoring system based on measurement unit cells (MUCs)
CN103195106B (en) Automatic synchronous inclination measuring device for precast pile with circular or circular ring shaped cross section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110817

Effective date of abandoning: 20120627