CN204286365U - Foundation pit side wall displacement monitoring device - Google Patents

Foundation pit side wall displacement monitoring device Download PDF

Info

Publication number
CN204286365U
CN204286365U CN201420857711.6U CN201420857711U CN204286365U CN 204286365 U CN204286365 U CN 204286365U CN 201420857711 U CN201420857711 U CN 201420857711U CN 204286365 U CN204286365 U CN 204286365U
Authority
CN
China
Prior art keywords
foundation pit
rotating shaft
frame
vertical frame
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420857711.6U
Other languages
Chinese (zh)
Inventor
姜泓任
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Sea Hanson Civil Engineering Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420857711.6U priority Critical patent/CN204286365U/en
Application granted granted Critical
Publication of CN204286365U publication Critical patent/CN204286365U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

本实用新型公开了一种基坑侧壁位移监测装置,包括:支撑框架、置于所述支撑框架上的基座、通过第一转轴安装在基座上的竖向架、通过第二转轴安装在所述竖向架上的横向架、以及固定在所述横向架上的激光测距仪;所述竖向架能够绕第一转轴转动,所述横向架能够绕第二转轴转动;所述第一转轴的轴线与所述第二转轴的轴线垂直;本实用新型能够快速地同时对基坑多部位的变形作出判断,有助于分析基坑受力特点和变形趋势,进而有利于较好的进行基坑安全评估。

The utility model discloses a foundation pit side wall displacement monitoring device, comprising: a support frame, a base placed on the support frame, a vertical frame installed on the base through a first rotating shaft, a horizontal frame installed on the vertical frame through a second rotating shaft, and a laser rangefinder fixed on the horizontal frame; the vertical frame can rotate around the first rotating shaft, and the horizontal frame can rotate around the second rotating shaft; the axis of the first rotating shaft is perpendicular to the axis of the second rotating shaft; the utility model can quickly and simultaneously judge the deformation of multiple parts of the foundation pit, which is helpful to analyze the stress characteristics and deformation trend of the foundation pit, and further conducive to better safety assessment of the foundation pit.

Description

基坑侧壁位移监测装置Foundation pit side wall displacement monitoring device

技术领域technical field

本实用新型涉及一种基坑侧壁位移监测装置。The utility model relates to a displacement monitoring device for the side wall of a foundation pit.

背景技术Background technique

基坑是指为进行建筑物基础与地下室的施工所开挖的地面以下的基础空间,是一种典型的岩土工程结构,在土木建筑和交通工程中相当普遍;基坑施工是对岩土体开挖和加固的复杂过程。通常情况下,基坑的失稳和塌方主要表现为侧壁变形不断增大而导致破坏,因此在施工中对基坑侧壁位移的监测对于确保安全具有至关重要的作用。现有技术中的基坑侧壁位移的监测手段主要采用测斜仪,这种手段一方面成本较高,另一方面需要通过在土层中钻孔或者在围护桩中预埋的方式来安装测斜管,时常由于土质体不能成孔或者测斜管堵塞而导致测斜过程无法进行;现有技术中还有采用全站仪作为基坑侧壁位移的监测手段,设备昂贵、监测时不方便;如何提供一种适用范围广、低成本、使用方便的基坑侧壁位移监测装置,目前现有技术中尚未存在有效的解决方案。Foundation pit refers to the foundation space below the ground excavated for the construction of building foundation and basement. It is a typical geotechnical engineering structure, which is quite common in civil construction and traffic engineering; complex process of body excavation and reinforcement. Under normal circumstances, the instability and collapse of foundation pits are mainly manifested as the continuous increase of side wall deformation and damage. Therefore, monitoring the displacement of foundation pit side walls during construction plays a vital role in ensuring safety. In the prior art, the monitoring method for the displacement of the side wall of the foundation pit mainly uses an inclinometer. When installing the inclinometer pipe, the inclinometer process cannot be carried out because the soil body cannot form a hole or the inclinometer pipe is blocked; in the prior art, a total station is used as a monitoring method for the displacement of the side wall of the foundation pit, and the equipment is expensive and time-consuming to monitor. Inconvenient; How to provide a foundation pit side wall displacement monitoring device with wide application range, low cost and easy to use, there is no effective solution in the prior art.

发明内容Contents of the invention

本实用新型针对以上问题的提出,而研制一种移动灵活、成本低的基坑侧壁位移监测装置。Aiming at the above problems, the utility model develops a flexible and low-cost foundation pit side wall displacement monitoring device.

本实用新型的技术方案是:The technical scheme of the utility model is:

一种基坑侧壁位移监测装置,包括:支撑框架、置于所述支撑框架上的基座、通过第一转轴安装在基座上的竖向架、通过第二转轴安装在所述竖向架上的横向架、以及固定在所述横向架上的激光测距仪;所述竖向架能够绕第一转轴转动,所述横向架能够绕第二转轴转动;所述第一转轴的轴线与所述第二转轴的轴线垂直;A device for monitoring the displacement of the side wall of a foundation pit, comprising: a support frame, a base placed on the support frame, a vertical frame mounted on the base through a first rotating shaft, and a vertical frame mounted on the vertical frame through a second rotating shaft. The horizontal frame on the frame and the laser rangefinder fixed on the horizontal frame; the vertical frame can rotate around the first rotating shaft, and the horizontal frame can rotate around the second rotating shaft; the axis of the first rotating shaft perpendicular to the axis of the second rotating shaft;

进一步地,所述基座上布设有以竖向架轴线为中心的圆形刻度盘;Further, a circular dial centered on the axis of the vertical frame is arranged on the base;

进一步地,在水平放置的横向架上下两侧对称设置有扇形刻度盘;Further, fan-shaped dials are symmetrically arranged on the upper and lower sides of the horizontal horizontal frame;

进一步地,所述支撑框架包括一长方形底框和4个与底框平面垂直连接的立柱;所述立柱上端部连接所述基座。Further, the support frame includes a rectangular bottom frame and four uprights vertically connected to the plane of the bottom frame; the upper ends of the uprights are connected to the base.

由于采用了上述技术方案,本实用新型提供的基坑侧壁位移监测装置,本实用新型移动灵活,成本低廉,操作简单,携带方便,完成基坑侧壁位移监测工作不需要通过在土层中钻孔或者在围护桩中预埋的方式来安装测斜管等复杂操作;通过横向架在竖直方向的转动,以及竖向架在水平面上的周向转动,可以实现激光测距仪大范围的测点监测,尤其适合基坑短边部位的变形和侧壁深部的水平变形;本实用新型适用范围广,能够快速地同时对基坑多部位的变形作出判断,有助于分析基坑受力特点和变形趋势,进而有利于较好的进行基坑安全评估。Due to the adoption of the above technical scheme, the utility model provides a monitoring device for the displacement of the side wall of the foundation pit. The utility model is flexible in movement, low in cost, simple in operation, and easy to carry. Complicated operations such as drilling or pre-embedding in the retaining pile to install the inclinometer tube; through the rotation of the horizontal frame in the vertical direction and the circumferential rotation of the vertical frame on the horizontal plane, the large The range of measuring point monitoring is especially suitable for the deformation of the short side of the foundation pit and the horizontal deformation of the deep part of the side wall; the utility model has a wide application range and can quickly and simultaneously make judgments on the deformation of multiple parts of the foundation pit, which is helpful for the analysis of the foundation pit The stress characteristics and deformation trend are conducive to better foundation pit safety assessment.

附图说明Description of drawings

图1是本实用新型所述位移监测装置的结构示意图;Fig. 1 is the structural representation of displacement monitoring device described in the utility model;

图2是用于定位本实用新型所述位移监测装置的测站平台示意图;Fig. 2 is a schematic diagram of a station platform for positioning the displacement monitoring device described in the present invention;

图3是本实用新型所述位移监测装置的使用示意图。Fig. 3 is a schematic diagram of the use of the displacement monitoring device of the present invention.

图中:1、支撑框架,2、基座,3、第一转轴,4、竖向架,5、第二转轴,6、横向架,7、激光测距仪,8、圆形刻度盘,9、扇形刻度盘,10、锁紧螺栓,11、底框,12、立柱,13、定位界线,14、测站平台,15、定位点,16、反光片,17、混凝土墙,18、围护桩。In the figure: 1. Support frame, 2. Base, 3. First shaft, 4. Vertical frame, 5. Second shaft, 6. Horizontal frame, 7. Laser range finder, 8. Circular dial, 9. Fan-shaped dial, 10. Locking bolt, 11. Bottom frame, 12. Column, 13. Positioning boundary line, 14. Station platform, 15. Positioning point, 16. Reflector, 17. Concrete wall, 18. Surrounding bollard.

具体实施方式Detailed ways

如图1所示的一种基坑侧壁位移监测装置,包括:支撑框架1、置于所述支撑框架1上的基座2、通过第一转轴3安装在基座2上的竖向架4、通过第二转轴5安装在所述竖向架4上的横向架6、以及固定在所述横向架6上的激光测距仪7;所述竖向架4能够绕第一转轴3转动,所述横向架6能够绕第二转轴5转动;所述第一转轴3的轴线与所述第二转轴5的轴线垂直;进一步地,所述基座2上布设有以竖向架4轴线为中心的圆形刻度盘8;进一步地,在水平放置的横向架6上下两侧对称设置有扇形刻度盘9;进一步地,所述支撑框架1包括一长方形底框11和4个与底框11平面垂直连接的立柱12;所述立柱12上端部连接所述基座2;所述圆形刻度盘8用于确定绕第一转轴3转动后的竖向架4的位置;所述扇形刻度盘9用于确定绕第二转轴5转动后的横向架6的位置;所述横向架6和竖向架4可以根据测点位置进行转动,待位置确定后,固定横向架6和竖向架4,然后进行测距。A foundation pit side wall displacement monitoring device as shown in Figure 1, comprising: a support frame 1, a base 2 placed on the support frame 1, a vertical frame mounted on the base 2 through a first rotating shaft 3 4. The horizontal frame 6 installed on the vertical frame 4 through the second rotating shaft 5, and the laser rangefinder 7 fixed on the horizontal frame 6; the vertical frame 4 can rotate around the first rotating shaft 3 , the horizontal frame 6 can rotate around the second shaft 5; the axis of the first shaft 3 is perpendicular to the axis of the second shaft 5; further, the base 2 is arranged with a vertical frame 4 axis a circular dial 8 at the center; further, fan-shaped dials 9 are symmetrically arranged on the upper and lower sides of the horizontally placed horizontal frame 6; further, the support frame 1 includes a rectangular bottom frame 11 and 4 bottom frames 11 vertically connected columns 12; the upper end of the column 12 is connected to the base 2; the circular dial 8 is used to determine the position of the vertical frame 4 after rotating around the first rotating shaft 3; the fan-shaped scale The disc 9 is used to determine the position of the horizontal frame 6 after rotating around the second rotating shaft 5; the horizontal frame 6 and the vertical frame 4 can be rotated according to the position of the measuring point, and after the position is determined, the horizontal frame 6 and the vertical frame are fixed 4, and then measure the distance.

在利用本实用新型所述位移监测装置进行基站侧壁位移监测时,首先设置基坑的测站位置,图2示出了用于定位本实用新型所述位移监测装置的测站平台14示意图,该测站平台14采用混凝土做成标准尺寸,置于基坑的围护桩18上,并标记好定位界线13,将支撑框架1边沿与所述定位界线13重合,采用重锤定位确定定位点15,进而保证每次监测时支撑框架1位置不变。When utilizing the displacement monitoring device described in the present invention to monitor the displacement of the side wall of the base station, the station position of the foundation pit is first set, and Fig. 2 shows a schematic diagram of the station platform 14 for positioning the displacement monitoring device described in the present invention, The station platform 14 is made of concrete to a standard size, placed on the retaining pile 18 of the foundation pit, and the positioning boundary line 13 is marked, the edge of the supporting frame 1 is coincident with the positioning boundary line 13, and the positioning point is determined by positioning with a weight 15, thereby ensuring that the position of the support frame 1 remains unchanged during each monitoring.

如图3所示,具体地,本实用新型所述位移监测装置使用时按照如下工作步骤进行:As shown in Figure 3, specifically, the displacement monitoring device described in the utility model is used according to the following working steps:

1、首先在基坑一侧的混凝土墙17上,每隔一定间距修建图2示出的测站平台14,并标记好定位界线13;1. First, on the concrete wall 17 on one side of the foundation pit, build the measuring station platform 14 shown in FIG. 2 at regular intervals, and mark the positioning boundary line 13;

2、每次监测时,将所述位移监测装置的支撑框架1边沿与定位界线13重合,采用重锤定位,保证每次监测基座2位置不变;2. During each monitoring, the edge of the support frame 1 of the displacement monitoring device coincides with the positioning boundary line 13, and the weight is used for positioning to ensure that the position of the base 2 remains unchanged each time;

3、根据测点位置转动横向架6实现竖直方向的上下调整,通过扇形刻度盘9上布设的刻度实现定位(当横向架6向下转动时,下侧的扇形刻度盘用于定位,当横向架6向上转动时,上侧的扇形刻度盘用于定位),然后固定横向架6的位置,具体可以通过锁紧螺栓10将横向架6固定到竖向架4上;3. Turn the horizontal frame 6 according to the position of the measuring point to realize vertical adjustment up and down, and realize positioning through the scale arranged on the fan-shaped dial 9 (when the horizontal frame 6 rotates downward, the fan-shaped dial on the lower side is used for positioning, when When the horizontal frame 6 rotates upwards, the fan-shaped dial on the upper side is used for positioning), and then the position of the horizontal frame 6 is fixed, specifically the horizontal frame 6 can be fixed to the vertical frame 4 by locking bolts 10;

4、转动竖向架4实现其在水平面上的周向调整,通过圆形刻度盘8上布设的刻度实现角度定位,然后固定竖向架4的位置,具体可以通过锁紧螺栓10将竖向架4固定到基座2上;4. Rotate the vertical frame 4 to realize its circumferential adjustment on the horizontal plane, realize angular positioning through the scale arranged on the circular dial 8, and then fix the position of the vertical frame 4. Specifically, the vertical frame can be locked by locking the bolt 10. The frame 4 is fixed on the base 2;

5、测点位置确定后,激光测距仪7对准测点的反光片16,进行测距;5. After the position of the measuring point is determined, the laser rangefinder 7 is aligned with the reflective sheet 16 of the measuring point to measure the distance;

6、寻找另一个测点,重复3至5,直到所有范围内测点均测量完毕;6. Find another measuring point, repeat 3 to 5, until all the measuring points in the range are measured;

7、寻找下一个设站地点,重复2至6,直到所有设站地点都监测完毕,则本周期的基坑侧壁位移监测结束。7. Find the next station location, repeat steps 2 to 6 until all station locations are monitored, then the monitoring of foundation pit side wall displacement in this cycle ends.

本实用新型移动灵活,成本低廉,操作简单,携带方便,完成基坑侧壁位移监测工作不需要通过在土层中钻孔或者在围护桩中预埋的方式来安装测斜管等复杂操作;通过横向架在竖直方向的转动,以及竖向架在水平面上的周向转动,可以实现激光测距仪大范围的测点监测,尤其适合基坑短边部位的变形和侧壁深部的水平变形;本实用新型适用范围广,能够快速地同时对基坑多部位的变形作出判断,有助于分析基坑受力特点和变形趋势,进而有利于较好的进行基坑安全评估。The utility model has the advantages of flexible movement, low cost, simple operation, and convenient portability. It does not need complicated operations such as drilling holes in the soil layer or pre-buried in the surrounding protection piles to install inclinometer pipes to complete the displacement monitoring work of the side wall of the foundation pit. ;Through the rotation of the horizontal frame in the vertical direction and the circumferential rotation of the vertical frame on the horizontal plane, a wide range of measuring points can be monitored by the laser rangefinder, especially suitable for the deformation of the short side of the foundation pit and the depth of the side wall Horizontal deformation: the utility model has a wide range of applications, can quickly and simultaneously judge the deformation of multiple parts of the foundation pit, and is helpful for analyzing the force characteristics and deformation trends of the foundation pit, which in turn is conducive to better safety assessment of the foundation pit.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其发明构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Any equivalent replacement or change of the new technical solution and its inventive concept shall be covered by the protection scope of the present utility model.

Claims (4)

1. a foundation pit side-wall displacement monitor, is characterized in that comprising: support frame, the pedestal be placed on described support frame, the vertical frame be arranged on by the first rotating shaft on pedestal, the laser range finder that is arranged on the transverse strands on described vertical frame by the second rotating shaft and is fixed in described transverse strands; Described vertical frame can around the first axis of rotation, and described transverse strands can around the second axis of rotation; The axis of described first rotating shaft and the axes normal of described second rotating shaft.
2. foundation pit side-wall displacement monitor according to claim 1, is characterized in that described pedestal being laid with the circular scale centered by vertical frame axis.
3. foundation pit side-wall displacement monitor according to claim 1, is characterized in that the upper and lower symmetria bilateralis of the transverse strands of horizontal positioned is provided with fan dial.
4. foundation pit side-wall displacement monitor according to claim 1, is characterized in that described support frame comprises a rectangle underframe and 4 columns be connected with underframe plane orthogonal; Described column upper end connects described pedestal.
CN201420857711.6U 2014-12-30 2014-12-30 Foundation pit side wall displacement monitoring device Expired - Fee Related CN204286365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420857711.6U CN204286365U (en) 2014-12-30 2014-12-30 Foundation pit side wall displacement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420857711.6U CN204286365U (en) 2014-12-30 2014-12-30 Foundation pit side wall displacement monitoring device

Publications (1)

Publication Number Publication Date
CN204286365U true CN204286365U (en) 2015-04-22

Family

ID=52869516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420857711.6U Expired - Fee Related CN204286365U (en) 2014-12-30 2014-12-30 Foundation pit side wall displacement monitoring device

Country Status (1)

Country Link
CN (1) CN204286365U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988928A (en) * 2015-05-25 2015-10-21 浙江省围海建设集团股份有限公司 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images
CN108107443A (en) * 2017-11-29 2018-06-01 国网河南省电力公司修武县供电公司 The device of measurement space distance during a kind of distribution is built
CN108360576A (en) * 2018-01-25 2018-08-03 温州中奇建设监理有限公司 A kind of foundation pit displacement automatic monitoring system and method
CN109029320A (en) * 2018-08-07 2018-12-18 安徽恒信建设工程管理有限公司 A kind of foundation pit displacement automatic monitoring system
CN110645932A (en) * 2019-11-06 2020-01-03 电子科技大学中山学院 Plate column node column end displacement measurement device based on Beidou technology
CN108663021B (en) * 2018-08-22 2020-10-16 温州华厦建设监理有限公司 Building wall perpendicularity detection device and detection method using same
CN111829460A (en) * 2020-07-08 2020-10-27 惠州市筑成工程管理有限公司 Engineering construction supervision quality acceptance actual measurement device and method
CN112097584A (en) * 2020-07-31 2020-12-18 上海二十冶建设有限公司 Device for measuring horizontal safe distance of foundation pit and using method
CN115182396A (en) * 2022-07-05 2022-10-14 中国十七冶集团有限公司 Deep basal pit excavation deformation real-time supervision device
CN115574732A (en) * 2022-12-08 2023-01-06 北京新兴环宇信息科技有限公司 Foundation pit detection method and detection system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988928A (en) * 2015-05-25 2015-10-21 浙江省围海建设集团股份有限公司 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images
CN108107443A (en) * 2017-11-29 2018-06-01 国网河南省电力公司修武县供电公司 The device of measurement space distance during a kind of distribution is built
CN108360576A (en) * 2018-01-25 2018-08-03 温州中奇建设监理有限公司 A kind of foundation pit displacement automatic monitoring system and method
CN109029320A (en) * 2018-08-07 2018-12-18 安徽恒信建设工程管理有限公司 A kind of foundation pit displacement automatic monitoring system
CN108663021B (en) * 2018-08-22 2020-10-16 温州华厦建设监理有限公司 Building wall perpendicularity detection device and detection method using same
CN110645932A (en) * 2019-11-06 2020-01-03 电子科技大学中山学院 Plate column node column end displacement measurement device based on Beidou technology
CN111829460A (en) * 2020-07-08 2020-10-27 惠州市筑成工程管理有限公司 Engineering construction supervision quality acceptance actual measurement device and method
CN111829460B (en) * 2020-07-08 2021-10-08 广东筑成工程管理有限公司 Engineering construction supervision quality acceptance actual measurement device and method
CN112097584A (en) * 2020-07-31 2020-12-18 上海二十冶建设有限公司 Device for measuring horizontal safe distance of foundation pit and using method
CN112097584B (en) * 2020-07-31 2023-03-03 上海二十冶建设有限公司 Use method of device for measuring horizontal safe distance of foundation pit
CN115182396A (en) * 2022-07-05 2022-10-14 中国十七冶集团有限公司 Deep basal pit excavation deformation real-time supervision device
CN115182396B (en) * 2022-07-05 2023-08-25 中国十七冶集团有限公司 Deep foundation pit excavation deformation real-time monitoring device
CN115574732A (en) * 2022-12-08 2023-01-06 北京新兴环宇信息科技有限公司 Foundation pit detection method and detection system
CN115574732B (en) * 2022-12-08 2023-03-10 北京新兴环宇信息科技有限公司 Foundation pit detection method and detection system

Similar Documents

Publication Publication Date Title
CN110206493B (en) A construction technology of full-casing and full-rotation bored pile
CN103266600B (en) Construction method of occlusion pile of full reinforcement pile
CN104328799B (en) A kind of sheltered reverse excavation subway station steel pipe column accurate positioning method
CN205718762U (en) A kind of stake holes measuring instrument
CN105672314B (en) A kind of semi-inverse method steel pipe post pile construction method
JPH08120673A (en) Accurate erection method and equipment for steel frame column under ground surface of reverse construction method
CN104833294A (en) Device and method for measuring verticality of pipe pile
JP6044360B2 (en) Installation error measuring system for building member, measuring error measuring method for building member, and erection method for struts
CN113048961A (en) Measuring tool for independent foundation positioning and using method
CN207248186U (en) Casing construction centralising device
CN205120093U (en) Novel test is subsided on earth's surface device
CN208024341U (en) A kind of rotary digging stake locator
CN103076010A (en) Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN105241418B (en) A kind of new ground settlement test device and method
CN103628511B (en) Setting-out plumbing method for pile foundation casing
CN115710893A (en) Foundation pit measuring device
CN115787754A (en) Foundation pit side slope gradient measurement and side slope deformation monitoring device
CN208619860U (en) A kind of anti-bias measuring device of push-bench
CN108759787A (en) A kind of excavation slope slope is than verifying attachment and its application method
CN106123873A (en) Upright projection positioning measuring device location cultellation construction method
CN206876176U (en) A kind of pre- embedding middle device of the positive nanubrium of target type
CN210460637U (en) A but, rotation of shaft orientation is accurate appearance support that hangs down
CN103469827A (en) Tower base hot rod mounting technique in permafrost regions
CN106480901B (en) Precise positioning method for lattice type steel stand column

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170504

Address after: Dalian high tech Industrial Park, Liaoning province 116000 Kehai Street No. 68

Patentee after: Dalian sea Hanson Civil Engineering Technology Co. Ltd.

Address before: 116000 No. 1, Ling Hai Road, Dalian hi tech park, Liaoning

Patentee before: Jiang Hongren

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20201230

CF01 Termination of patent right due to non-payment of annual fee