CN201891255U - Assembly/disassembly-free, movable and reusable operating platform of inner pipe well - Google Patents

Assembly/disassembly-free, movable and reusable operating platform of inner pipe well Download PDF

Info

Publication number
CN201891255U
CN201891255U CN2010205900776U CN201020590077U CN201891255U CN 201891255 U CN201891255 U CN 201891255U CN 2010205900776 U CN2010205900776 U CN 2010205900776U CN 201020590077 U CN201020590077 U CN 201020590077U CN 201891255 U CN201891255 U CN 201891255U
Authority
CN
China
Prior art keywords
operating platform
surface layer
pipe well
inner pipe
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205900776U
Other languages
Chinese (zh)
Inventor
张琨
罗宏
黄晨光
宋文霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN2010205900776U priority Critical patent/CN201891255U/en
Application granted granted Critical
Publication of CN201891255U publication Critical patent/CN201891255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to an assembly/disassembly-free, movable and reusable operating platform of an inner pipe well. The operating platform comprises a beam, four rotatable support beams, two surface layer base plates, two side baffle plates, two springs, two support stand columns and a connecting transverse rod. The operating platform is characterized in that the two support stand columns are welded in the middle of the beam, the connecting transverse rod is fixed between the two support stand columns, the two ends of the beam are respectively connected with two rotatable support beams by bearings, one surface layer base plate is welded on every two rotatable support beams, each surface layer base plate is vertically welded with one side baffle plate, the two ends of each spring are respectively connected with one surface layer base plate and one support stand column, and the surface layer base plates and the side baffle plates are arranged on a concrete beam in a clamping way to form into the operating platform. After using the operating platform of the inner pipe well, a scaffold bracket does not need to be repeatedly assembled and disassembled, the great waste of labor force is avoided, the construction period is compressed, and the danger caused by assembling and disassembling the scaffold bracket of the inner pipe well is avoided.

Description

Interior pipe well is exempted to take and is torn the removable operating platform that can use repeatedly open
Technical field
The utility model belongs to technical field of building construction, particularly relate to a kind of in pipe well exempt to take and tear the removable operating platform that can use repeatedly open.
Background technology
At present, the job practices of interior pipe well operating platform is: set up five layers of builder's jack (generally being no more than 24m), these builder's jacks of setting up are removed in five layers of builder's jack place work planes construction finishing back of setting up, and set up again during follow-up construction again, remove again.Setting up and removing so again and again, waste great amount of manpower and construction period, and interior pipe well builder's jack set up and remove dangerous than higher.
Summary of the invention
The purpose of this utility model provides a kind of interior pipe well to exempt to take and tears the removable operating platform that can use repeatedly open in order to overcome problem and the shortcoming that above-mentioned prior art exists.
The technical solution of the utility model is:
Interior pipe well is exempted to take and is torn the removable operating platform that can use repeatedly open, comprise a crossbeam, four swivel bearing beams, two chunk facing backing plates, two side shields, two springs, two supporting upright posts, a connection cross bar, it is characterized in that: two supporting upright posts are welded on the crossbeam middle part, fix a connection cross bar between two supporting upright posts, the crossbeam two ends connect two swivel bearing beams by bearing respectively, welding one chunk facing backing plate on per two swivel bearing beams, side shield of the vertical welding of every chunk facing backing plate, every both ends of the spring is connected with supporting upright post with a surface layer backing plate respectively, and surface layer backing plate and side shield holding are formed an operating platform on concrete beam.。
Four suspension centres of design on crossbeam, operating platform can move to next work plane by suspension centre.
When described operating platform is run into the concrete beam on upper strata in moving process, be rotated down by spring and bearing.Described operating platform restores automatically by spring and bearing when losing the resistance that concrete beam gives.
Interior pipe well operating platform that the utility model provides has been avoided builder's jack setting up and removing again and again, has avoided a large amount of labor wastes, has compressed the construction period, has evaded the danger that interior pipe well builder's jack is set up and removed.
Description of drawings
Fig. 1, Fig. 2 are structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail:
As Fig. 1, shown in Figure 2, the utility model comprises a crossbeam 1, four swivel bearing beams 2, two chunk facing backing plates 3, two side shields 4, two springs 5, two supporting upright posts 6, a connection cross bar 7, it is characterized in that: two supporting upright posts 6 are welded on crossbeam 1 middle part, fix a connection cross bar 7 between two supporting upright posts 6, crossbeam 1 two ends connect two swivel bearing beams 2 by bearing respectively, welding one chunk facing backing plate 3 on per two swivel bearing beams 2, side shield 4 of every chunk facing backing plate 3 vertical welding, every spring 5 two ends are connected with supporting upright post 6 with a surface layer backing plate 3 respectively, and surface layer backing plate 3 and side shield 4 holdings are formed an operating platform on concrete beam 9.4 suspension centres 8 of design on crossbeam, operating platform can move to next work plane by suspension centre.
Fig. 1 is in carrying out during the pipe well structure construction, crossbeam 1 is formed a rotary bearing cross beam with swivel bearing beam 2 by bearing, surface layer backing plate 3 and side shield 4 holdings are on the concrete beam of having constructed, the longitudinal supporting beam is vertically welded on the crossbeam 1, construct used scaffold building on the longitudinal supporting beam, each scaffold operation layer is completely spread scaffold floor, carries out the construction of the related scope inner structure of scaffold.
When Fig. 2 changes in time one deck the pipe well structure construction for finishing when the construction of the related scope inner structure of scaffold, by four suspension centres 8 on the crossbeam the described operating platform that has assembled is hung, along with the increase of hanging distance, described bearing cross beam can be run on the concrete beam 9 of having constructed, concrete beam 9 is given resistance of described bearing cross beam, under drag effect, swivel bearing beam 2 is along with the compression of spring 5 rotates.Behind concrete beam 9, because the resilience of spring 5 makes swivel bearing beam 2 return to horizontal level.Repeat the next deck of constructing like this.

Claims (2)

1. interior pipe well is exempted to take and is torn the removable operating platform that can use repeatedly open, comprise a crossbeam, four swivel bearing beams, two chunk facing backing plates, two side shields, two springs, two supporting upright posts, a connection cross bar, it is characterized in that: two supporting upright posts are welded on the crossbeam middle part, fix a connection cross bar between two supporting upright posts, the crossbeam two ends connect two swivel bearing beams by bearing respectively, welding one chunk facing backing plate on per two swivel bearing beams, side shield of the vertical welding of every chunk facing backing plate, every both ends of the spring is connected with supporting upright post with a surface layer backing plate respectively, and surface layer backing plate and side shield holding are formed an operating platform on concrete beam.
2. pipe well is exempted to take and is torn the removable operating platform that can use repeatedly open in according to claim 1, it is characterized in that: four suspension centres of design on crossbeam.
CN2010205900776U 2010-11-03 2010-11-03 Assembly/disassembly-free, movable and reusable operating platform of inner pipe well Expired - Fee Related CN201891255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205900776U CN201891255U (en) 2010-11-03 2010-11-03 Assembly/disassembly-free, movable and reusable operating platform of inner pipe well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205900776U CN201891255U (en) 2010-11-03 2010-11-03 Assembly/disassembly-free, movable and reusable operating platform of inner pipe well

Publications (1)

Publication Number Publication Date
CN201891255U true CN201891255U (en) 2011-07-06

Family

ID=44220732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205900776U Expired - Fee Related CN201891255U (en) 2010-11-03 2010-11-03 Assembly/disassembly-free, movable and reusable operating platform of inner pipe well

Country Status (1)

Country Link
CN (1) CN201891255U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526918A (en) * 2013-10-18 2014-01-22 中国建筑第八工程局有限公司 Adjustable steel pipe operation platform
CN107035156A (en) * 2017-04-19 2017-08-11 上海建工建集团有限公司 Core Walls Structure horizontal structure self-crawling type protective platform
CN107813328A (en) * 2017-12-11 2018-03-20 大连四达高技术发展有限公司 The legal position punching system of removable hyperboloid automatic seeking
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526918A (en) * 2013-10-18 2014-01-22 中国建筑第八工程局有限公司 Adjustable steel pipe operation platform
CN107035156A (en) * 2017-04-19 2017-08-11 上海建工建集团有限公司 Core Walls Structure horizontal structure self-crawling type protective platform
CN107813328A (en) * 2017-12-11 2018-03-20 大连四达高技术发展有限公司 The legal position punching system of removable hyperboloid automatic seeking
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method

Similar Documents

Publication Publication Date Title
CN201891255U (en) Assembly/disassembly-free, movable and reusable operating platform of inner pipe well
CN202755634U (en) Suspension type operational platform
CN206328678U (en) Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN205711776U (en) A kind of supporting bracket of bridge construction
CN210164286U (en) Support arrangement for high altitude large-span steel structure truss installation usefulness
CN109594759B (en) Height-adjustable assembled double-layer outer protection frame device and using method thereof
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN204059206U (en) A kind of bridge construction Support bracket
CN207567835U (en) For the detachable experimental rig of shaketalle test
CN110206156A (en) A kind of jack-up system of jacking type building roof platform
CN202000268U (en) Foldable front outrigger for bridge girder erection machine
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN215101546U (en) Chinese ancient architecture pavilion maintenance and roof lifting device
CN109139037B (en) Overturning device for disassembling and assembling push bench
CN214541305U (en) Tower crane jacking operation programming teaching model
CN210790857U (en) Movable maintenance working platform for maintenance of hydraulic damper of nuclear power station
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN212078772U (en) Cutting unloading device for building steel structure engineering
CN203834365U (en) Assembly device for continuous beam pier construction supporting frames
CN105544955A (en) Elevator shaft tool type operation steel platform and manufacturing method thereof
CN202299458U (en) Jig frame for high-altitude large-span rod piece
CN110303459A (en) A kind of packaged type overhaul working platform for the maintenance of nuclear power station hydraulic damper
CN205591511U (en) Grillage is folded in support for building
CN214952713U (en) Static load test auxiliary assembly
CN205296794U (en) Portable builder's jack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20151103

EXPY Termination of patent right or utility model