CN201876118U - 感应体对接专用冷却装置 - Google Patents
感应体对接专用冷却装置 Download PDFInfo
- Publication number
- CN201876118U CN201876118U CN2010206002188U CN201020600218U CN201876118U CN 201876118 U CN201876118 U CN 201876118U CN 2010206002188 U CN2010206002188 U CN 2010206002188U CN 201020600218 U CN201020600218 U CN 201020600218U CN 201876118 U CN201876118 U CN 201876118U
- Authority
- CN
- China
- Prior art keywords
- water
- cooling device
- induction furnace
- inductors
- inductor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
一种感应体对接专用冷却装置,该专用冷却装置包括水套和固接在其上端面的进、出水管道,所述进、出水管道和所述感应电炉外界的冷却水联通。在感应电炉低液面保温状态,利用本实用新型使单台受损感应体周边迅速冷却,电炉局部母液凝固后,实施感应体对接作业,改变了该领域电炉大修模式,实现了不停炉感应体一体化维护作业模式,有效地解决了单台感应体维护和电炉停炉大修之间的矛盾,且检修作业时间只需6~8小时,还可不停炉同时更换2~3台感应体。
Description
技术领域
本实用新型涉及一种有芯电炉感应体对接时的冷却装置。
背景技术
在电炉实际运行中,感应体内部因局部高温使耐火材料经常龟裂,导致感应体内部或法兰对接面漏液而停止工作,传统维护检修工艺是待电炉感应体3台以上漏液,停炉放空炉内母液,更换6台感应体,电炉大修,仅重新砌炉工期历时7天,该工艺除检修维护工作量大、施工工期长外还有感应体维护成本高等弊病,这种检修工艺还缩短了电炉运行寿命,严重制约了电炉产能效能的发挥。
实用新型内容
本实用新型提供一种在实施电炉感应体对接工艺时,使感应体周围的母液迅速冷却凝固的冷却装置,从而可实现不停炉感应体一体化维护作业模式。
为此,采用如下技术方案:一种感应体对接专用冷却装置,该专用冷却装置包括水套和固接在其上端面的进、出水管道,所述进、出水管道和所述感应电炉外界的冷却水联通。
在电炉低液面保温状态,利用本实用新型使单台受损感应体周边迅速冷却,电炉局部母液凝固后,实施感应体对接作业,改变了该领域电炉大修模式,实现了不停炉感应体一体化维护作业模式,有效地解决了单台感应体维护和电炉停炉大修之间的矛盾,且检修作业时间只需6~8小时,还可不停炉同时更换2~3台感应体。同比原工艺,检修工期缩短,检修工作量大为降低,同时改变了电炉检修方式,将以前不定期停炉大修改为计划检修的小型维护模式,节省了电炉及感应体的大修费用,有效地提高了电炉运行寿命,电炉大修周期提高至1次/2年,感应体使用寿命原来只有4~6月,现平均在1.5年以上。利用本实用新型,电炉可甩掉煤气辅助加热,电炉炉况大为改善,作业环境也明显改善,为电炉的稳定生产创造了有力条件。
本实用新型在实际生产应用中取得了显著的经济效益,停用煤气后每年可节费用近150万元,减少电炉大修和降低感应体维护费用每年近35万元,职工劳动强度的降低和电炉作业环境的改善也取得了良好的社会效益。
附图说明
图1为本实用新型的结构示意图;
图2为图1的俯视图。
具体实施方式
下面结合附图对本实用新型作进一步的说明。
参照图1、图2,一种新型感应体对接工艺的专用冷却装置,所述专用冷却装置包括水套1和固接在其上端面的进、出水管道2、3,所述进、出水管道2、3和所述感应电炉外界的冷却水联通。
所述冷却装置的水套1的承压一般设计为0.15~0.6MPA, 以保证水套内部有较大的流量和出水压力;并且根据电炉锌液温度、水套容积和水套放置位置等因素计算冷却水循环量,考虑不周将导致水套放置后感应体喉口周围不能迅速“冻结”,对接作业时发生跑锌事故或者造成水套在锌液内炸裂事故,一般按感应体功率90KW~300KW计算,所述水套结构尺寸设计为长:900~2000mm,宽200~1500mm,高:400~800mm,采用δ=8~12mm的钢板制作。当水套1的横截面为梯形时,优先采用长1600mm和1000mm,高800mm,宽287mm,用厚8mm的钢板焊接而成。
Claims (2)
1.一种感应体对接专用冷却装置,其特征在于:所述专用冷却装置包括水套(1)和固接在其上端面的进、出水管道(2、3),所述进、出水管道(2、3)和所述感应电炉外界的冷却水联通。
2.根据权利要求1所述的专用冷却装置,其特征在于:所述水套(1)的横截面为梯形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206002188U CN201876118U (zh) | 2010-11-10 | 2010-11-10 | 感应体对接专用冷却装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206002188U CN201876118U (zh) | 2010-11-10 | 2010-11-10 | 感应体对接专用冷却装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201876118U true CN201876118U (zh) | 2011-06-22 |
Family
ID=44164035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206002188U Expired - Fee Related CN201876118U (zh) | 2010-11-10 | 2010-11-10 | 感应体对接专用冷却装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201876118U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012162A (zh) * | 2010-11-10 | 2011-04-13 | 白银有色集团股份有限公司 | 一种新型感应体对接工艺及其专用冷却装置 |
-
2010
- 2010-11-10 CN CN2010206002188U patent/CN201876118U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012162A (zh) * | 2010-11-10 | 2011-04-13 | 白银有色集团股份有限公司 | 一种新型感应体对接工艺及其专用冷却装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201876118U (zh) | 感应体对接专用冷却装置 | |
CN201680741U (zh) | 发电机空气冷却器 | |
CN202441659U (zh) | 一种具有冷却装置的液压油箱 | |
CN207276361U (zh) | 一种无功补偿发生装置密闭冷却水系统 | |
CN201764518U (zh) | 螺旋膜式壁结构通流两级冷却冷渣机 | |
CN201353641Y (zh) | 金属液保温气垫装置 | |
CN202766548U (zh) | 一种高炉微型冷却器 | |
CN201381967Y (zh) | 一种新型热能转换器 | |
CN101749958B (zh) | 一种锌丝牵引炉机组冷却装置 | |
CN204993023U (zh) | 矿用h桥级联型高压防爆变频器水冷系统装置 | |
CN102012162A (zh) | 一种新型感应体对接工艺及其专用冷却装置 | |
CN202304445U (zh) | 高强度闪速熔炼炉底强制冷却装置 | |
CN201678743U (zh) | 电加热保持炉虹吸进铝免加热式前炉装置 | |
CN201465580U (zh) | 水冷却系统 | |
CN212469683U (zh) | 一种变频式浪涌冷却装置 | |
CN201195734Y (zh) | 一种水套冷却装置 | |
CN201245697Y (zh) | 海绵锆蒸馏冷却水套 | |
CN204630465U (zh) | 一种水电混合的内置式水轮机冷却塔节能装置 | |
CN201611223U (zh) | 电熔镁余热锅炉 | |
CN201755639U (zh) | 一种连铸板坯火切机水冷板 | |
CN219013062U (zh) | 电炉液压站循环泵冷却装置 | |
CN220926855U (zh) | 一种天然气退火炉余热利用装置 | |
CN219869155U (zh) | 一种熔化炉电磁感应线圈冷却液持续降温装置 | |
CN2376330Y (zh) | 热矿破碎机水冷衬式箅板 | |
CN203422678U (zh) | 除盐水密闭循环系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110622 Termination date: 20141110 |
|
EXPY | Termination of patent right or utility model |