CN201843347U - Pouring device provided with embedded part concrete column at top part - Google Patents

Pouring device provided with embedded part concrete column at top part Download PDF

Info

Publication number
CN201843347U
CN201843347U CN2010205924855U CN201020592485U CN201843347U CN 201843347 U CN201843347 U CN 201843347U CN 2010205924855 U CN2010205924855 U CN 2010205924855U CN 201020592485 U CN201020592485 U CN 201020592485U CN 201843347 U CN201843347 U CN 201843347U
Authority
CN
China
Prior art keywords
concrete column
vibrating
embedded part
grouting
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205924855U
Other languages
Chinese (zh)
Inventor
赖晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongse No.12 Metallurgy Construction Co., Ltd.
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010205924855U priority Critical patent/CN201843347U/en
Application granted granted Critical
Publication of CN201843347U publication Critical patent/CN201843347U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a pouring device provided with an embedded part concrete column at the top part, which comprises a reinforced concrete column (1), templates (2) and an embedded part (3), wherein side templates (2) of the reinforced concrete column (1) are respectively provided with more than one hopper-shaped grouting vibrating holes (4), and the hopper-shaped grouting vibrating holes (4) comprise a grouting vibrating hole side baffle plate (5) and a grouting vibrating hole inclined baffle plate (6). The hopper-shaped grouting vibrating holes (4) are arranged at the side surfaces of the concrete column templates (2), therefore, in pouring and vibrating of concrete columns, the hopper-shaped grouting vibrating holes (4) are used in construction to meet the requirement of the design drawing on mounting precision of the embedded part, therefore, the mounting reliability of the embedded part on the top of the concrete column is effectively improved, and also the construction is convenient. The pouring device is applicable to construction and installation of various embedded parts on the top of concrete columns.

Description

A kind of top has the apparatus for pouring of built-in fitting concrete column
Technical field
The utility model relates to a kind of apparatus for pouring of concrete column, particularly relates to the apparatus for pouring that a kind of top has the built-in fitting concrete column.
Background technology
At present, in industrial construction, the top has the cast of built-in fitting concrete column, generally is according to sequence of construction colligation post reinforcing bar at first, props up fixedly built-in fitting of column template then, and the sequence of construction of last fluid concrete is handled.This method is in the middle of practical design and construction, normal for satisfying the bigger embedded part of installation requirement setting, make the embedded part size differ too small with column cross-section size, the operating surface width is not enough, make concrete be difficult to cast, vibrating spear is difficult to stretch into, and can't guarantee the vibration compacting of post, thereby will cause the destruction of post.For avoiding above shortcoming, the normal processing mode that adopts is to pour the post concrete in practice of construction, before concrete initial set, embedded part is pressed in the concrete.Handling the deficiency that exists like this is because the inconvenience of concrete resistance and operation often causes the embedded part out-of-flatness, the distortion of the damage of template or embedded part anchor bar, thus do not reach instructions for use from now on.
Summary of the invention
The problem that the utility model solves is: the capital embedded part is wide, and (it is wide to equal post as the embedded part width greatly, embedded part length equals column length) time, original device construction can cause the destruction of post or embedded part not to reach instructions for use, and the utility model provides a kind of top to have the apparatus for pouring of built-in fitting concrete column.
The technical solution of the utility model: a kind of top has the apparatus for pouring of built-in fitting concrete column, comprises reinforced concrete post, template and built-in fitting, and the Side shuttering of concrete column is provided with the above infundibulate grouting hole of vibrating.
The infundibulate grouting hole of vibrating is made of grouting hole side board and the grouting hole deviation baffle plate that vibrates that vibrates.
The utility model has guaranteed the vibration compacting of concrete column, has improved the security reliability of concrete column, makes that embedded part is smooth and has reached required precision to embedded part.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model;
1. reinforced concrete posts among the figure, 2. concrete column side and bottom surface template, 3. capital built-in fitting, the 4. infundibulate grouting hole of vibrating, 5. side board, 6. the grouting hole deviation baffle plate that vibrates.
The specific embodiment
Embodiment: the structure that the utility model adopted such as Fig. 1.During concrete the construction, can be earlier according to the template 2 of the form of construction work assembling reinforcement pillar of no built-in fitting concrete column 1, in the template 2 of concrete column 1 the infundibulate grouting hole 4 of vibrating is set then, and according to the fixing back built-in fitting 3 of design drawing, mold forming is once propped up in concrete column template 2, the grouting of capital built-in fitting 3 and the infundibulate hole 4 of vibrating.The infundibulate grouting hole 4 of vibrating is provided with side board 5 and slanting baffle 6, during the concrete column cast, carries out concrete pouring and vibrates by the infundibulate grouting hole 4 of vibrating.Cast finishes after the form removal, and the infundibulate grouting formed concrete block in hole that vibrates is knocked out and gets final product.
Employing this method can effectively improve the installation reliability of concrete capital embedded part, the safety that also can improve post itself greatly, and the method has simple to operate and advantage benefit economy.

Claims (2)

1. a top has the apparatus for pouring of built-in fitting concrete column, comprises reinforced concrete post (1), template (2) and built-in fitting (3), it is characterized in that: the template (2) of concrete column (1) is provided with the above infundibulate grouting hole (4) of vibrating.
2. a kind of top according to claim 1 has the apparatus for pouring of built-in fitting concrete column, it is characterized in that: the grouting of described infundibulate is vibrated hole (4) by grouting hole side board (5) and grouting hole deviation baffle plate (6) formation of vibrating of vibrating.
CN2010205924855U 2010-11-05 2010-11-05 Pouring device provided with embedded part concrete column at top part Expired - Lifetime CN201843347U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205924855U CN201843347U (en) 2010-11-05 2010-11-05 Pouring device provided with embedded part concrete column at top part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205924855U CN201843347U (en) 2010-11-05 2010-11-05 Pouring device provided with embedded part concrete column at top part

Publications (1)

Publication Number Publication Date
CN201843347U true CN201843347U (en) 2011-05-25

Family

ID=44038240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205924855U Expired - Lifetime CN201843347U (en) 2010-11-05 2010-11-05 Pouring device provided with embedded part concrete column at top part

Country Status (1)

Country Link
CN (1) CN201843347U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561692A (en) * 2010-12-22 2012-07-11 贵阳铝镁设计研究院有限公司 Method and template for pouring concrete beam or column with embedded part at top

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561692A (en) * 2010-12-22 2012-07-11 贵阳铝镁设计研究院有限公司 Method and template for pouring concrete beam or column with embedded part at top

Similar Documents

Publication Publication Date Title
CN105926935A (en) Integral column formwork based on 3d printing and used for concrete pouring and column pouring method
CN102535849B (en) Constructional column top concreting method
CN205907674U (en) Wall template reinforcement bearing structure is led on circulated servicetype ground even wall
CN207079910U (en) A kind of steel concrete shuttering for being easy to quick form removal
CN201835524U (en) Pouring device for concrete beam with top embedded part
CN103883088B (en) A kind of inclined slope roof concrete working device and method
CN206220489U (en) Concrete post formwork for placing tightening device
CN201843347U (en) Pouring device provided with embedded part concrete column at top part
CN102121313B (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN104328919A (en) Construction method for fixing preburied iron elements
CN207812625U (en) Special-shaped gutter template integrated apparatus
CN202658802U (en) Positioning tool for pillar reinforcing bar
CN205046856U (en) Concrete excellent slant control guide rail that vibrates
CN104908148A (en) Cable trough cover plate prefabricated template and construction method thereof
CN201962948U (en) Concrete beam pouring template with embedded part at top
CN201915635U (en) Form erecting device free of bar planting for brickwork construction
CN102561692A (en) Method and template for pouring concrete beam or column with embedded part at top
CN103243915B (en) Formwork removing and hole sealing method for closed box-shaped structural concrete
CN209723594U (en) A kind of positioning of assembled architecture reinforcing bar and check device
CN202787992U (en) Constructional column top concrete pouring structure
CN205024573U (en) Concrete trowelling machine that vibrates fast
CN201908437U (en) Concrete column casting die plate with embedded part at top
CN201714085U (en) Shear wall door opening side molding plate reinforcing device
CN207268048U (en) A kind of bar reinforcement positioning device
CN206536626U (en) Prefabricated composite wallboard magnetic holder frock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 No. 208, Beijing Road, Guiyang, Guizhou

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550003 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

ASS Succession or assignment of patent right

Owner name: ZHONGSE NO.12 METALLURGY CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE CO., LTD.

Effective date: 20120301

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550081 GUIYANG, GUIZHOU PROVINCE TO: 043304 YUNCHENG, SHAANXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120301

Address after: 043304 middle section, No.1 aluminium base, Hejin, Shanxi

Patentee after: Zhongse No.12 Metallurgy Construction Co., Ltd.

Address before: 550081 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110525