CN201962948U - Concrete beam pouring template with embedded part at top - Google Patents

Concrete beam pouring template with embedded part at top Download PDF

Info

Publication number
CN201962948U
CN201962948U CN2010206747059U CN201020674705U CN201962948U CN 201962948 U CN201962948 U CN 201962948U CN 2010206747059 U CN2010206747059 U CN 2010206747059U CN 201020674705 U CN201020674705 U CN 201020674705U CN 201962948 U CN201962948 U CN 201962948U
Authority
CN
China
Prior art keywords
cast
template
fitting
built
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206747059U
Other languages
Chinese (zh)
Inventor
赖晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010206747059U priority Critical patent/CN201962948U/en
Application granted granted Critical
Publication of CN201962948U publication Critical patent/CN201962948U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete beam pouring template with an embedded part at the top, comprising a beam pouring template (1) for pouring a concrete beam, wherein a template on the side surface of the beam pouring template (1) is provided with more than one beam pouring vibrating hole (1.1) along the horizontal line direction. The concrete beam pouring template not only has the advantages of simple structure and convenient use, but also has the advantages of lower manufacturing cost, good construction quality and the like.

Description

A kind of top has the concrete beam cast template of built-in fitting
Technical field
The utility model relates to the concrete beam cast template that a kind of top has built-in fitting, belongs to technical field of building construction.
Background technology
In industrial construction, often need be on floor beam or post place apparatus, beam or post and equipment are that the built-in fitting by beam or capital welds and is connected, and are to satisfy the standing tops of bigger built-in fitting at beam or post of putting of needs are installed.The sequence of construction of built-in fitting beam or post generally is at first colligation beam or post reinforcing bar, strutbeam or post cast template then, fixing built-in fitting, last fluid concrete.But in the middle of practical design and construction, consider economy, do not need to be provided with the beam or the post of broad, usually cause built-in fitting width and beam or post width to differ little, the operating surface width is not enough, make concrete be difficult to cast, vibrating spear is difficult to stretch into and vibrates, and can't guarantee the vibration compacting of beam or post.If the closely knit of beam or post can't guarantee that it is destroyed that will cause beam or post to be easy in use.At present, processing method commonly used is after pouring beam or post concrete, before concrete initial set, built-in fitting to be pressed in the concrete on the engineering.But because the inconvenience of concrete resistance and operation often causes the damage of built-in fitting out-of-flatness, cast template or the distortion of built-in fitting anchor bar, thereby does not reach instructions for use from now on.Therefore, existing top has the concrete beam of built-in fitting or the pouring procedure of post still is not ideal enough, the needs that still can not satisfy construction and use.
Summary of the invention
The purpose of this utility model be to provide a kind of simple in structure, easy to use, cost of manufacture is lower, and can guarantee that the top of construction quality has the concrete beam cast template of built-in fitting, to overcome the deficiency of existing job practices.
The utility model is to realize like this, a kind of top of the present utility model has the concrete beam cast template of built-in fitting, comprise the beam cast template that is used for the fluid concrete beam, be provided with more than one beam in the Side shuttering upper edge of beam cast template horizon direction and pour into a mould the hole of vibrating.
On being vibrated in the hole in the cast of each beam on the Side shuttering of above-mentioned beam cast template, all be fixed with the cast funnel that vibrates, and the vibrate upper port height of funnel of cast equates with the top edge level height of beam cast template.
Above-mentioned each cast funnel that vibrates is all interconnected by two blocks of side plates, a front apron and an inclined bottom plate respectively and forms, and two blocks of side plates and inclined bottom plate are fixed on the beam cast and vibrate on the bore edges in hole.
Owing to adopted technique scheme, adopt the utility model, its job practices is different fully with prior art, prior art is placed pouring concrete for the close built-in fitting of the width of width and beam or capital and is placed built-in fitting later on again, the utility model is to carry out fluid concrete again after in advance built-in fitting being fixed, so the various situations that the utility model structure top of being highly suitable for concrete beam or post is embedded with the built-in fitting of broad are used.Method and structure that the utility model employing is simple, practical, investment is little have remedied the deficiencies in the prior art, have improved the security reliability of engineering construction.The utility model does not need to drop into a large amount of funds and manpower when construction, when construction, its built-in fitting and structural beams or post once prop up mold forming and anchoring is reliable.The utility model can prevent effectively that fluid concrete beam or post or concrete beam or post can not be taken place by the situation of vibration compacting reliably because the built-in fitting broad makes that operating surface is less; And adopt the utility model can effectively improve the installation reliability of structural beams or capital built-in fitting.Therefore, the utility model compared with prior art, the utility model not only has advantage simple in structure, easy to use, but also has advantages such as cost of manufacture is lower, construction quality is good.
Description of drawings
Structural representation when Fig. 1 is the use of the utility model beam cast template;
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Being labeled as in the accompanying drawing: 1-beam cast template, the 1.1-beam is poured into a mould the hole of vibrating, and 2-pours into a mould the funnel that vibrates, 2.1-side plate, 2.2-front apron, 2.3-inclined bottom plate, 3-concrete beam, 4-built-in fitting.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Embodiment 1 of the present utility model: when implementing the utility model, produce the concrete beam cast template that a kind of top of the present utility model has built-in fitting earlier, the structural representation of this template as depicted in figs. 1 and 2, comprise the existing beam cast template 1 that is used for fluid concrete beam 3, producing more than one beam cast the vibrate quantity in hole 1.1 of hole 1.1(beam cast of vibrating on the Side shuttering of beam cast template 1 can determine according to actual mode of occupation, if when all being provided with built-in fitting 4 at the top of concrete beam, can be by the beam cast hole 1.1 of vibrating is set every 0.5~2 meter length); On being vibrated in hole 1.1 in the cast of each beam on beam cast template 1 Side shuttering, all fix the cast funnel 2 that vibrates then, and the vibrate upper port height of funnel 2 of cast is made into the top edge level height of beam cast template 1 and equates; The funnel 2 that preferably each cast vibrated all is made into respectively by two blocks of side plates 2.1, a front apron 2.2 and an inclined bottom plate 2.3 and interconnects the chute structure (as shown in Figure 2) of forming tilting, and two blocks of side plates 2.1 and inclined bottom plate 2.3 are fixed on cast vibrate and get final product on the bore edges in hole 1.1; Pour into a mould the funnel 2 that vibrates and also can adopt traditional circular arc pyramidal structure.When adopting beam cast template 1 to pour into a mould the concrete beam 3 that has built-in fitting 4, the side of beam cast template 1 is produced the vibrate cast template in hole 1.1 of beam cast in advance to be supported by traditional approach, carry out concrete pouring (built-in fitting 4 can be fixed on the reinforcing bar of the concrete beam of tying up in advance in the beam cast template 1) again after being fixed in the beam cast template 1 earlier by instructions for use built-in fitting 4 then, when fluid concrete, can't stretch into routinely when vibrating in the beam cast template 1 when can't in beam cast template 1, carry out fluid concrete or vibrating spear routinely because of the built-in fitting 4 that is arranged on concrete beam 3 tops, carry out concrete pouring or vibrate getting final product by setting in advance in the beam cast of the cast template side hole of vibrating; When carrying out concrete pouring and vibrate after hours by setting in advance in the beam of the beam cast template 1 side cast hole 1.1 of vibrating, treat that the concrete initial set in the beam cast template 1 can remove the Side shuttering of beam cast template 1 later on, will water the concrete beam side that outpours simultaneously and cut and remove because of vibrate unnecessary concrete block that hole 1.1 forms of the beam cast of beam cast template 1.

Claims (3)

1. a top has the concrete beam cast template of built-in fitting, comprise the beam cast template (1) that is used for the fluid concrete beam, it is characterized in that: be provided with more than one beam in the Side shuttering upper edge of beam cast template (1) horizon direction and pour into a mould the hole (1.1) of vibrating.
2. top according to claim 1 has the concrete beam cast template of built-in fitting, it is characterized in that: on being vibrated in hole (1.1) in the cast of each beam on the Side shuttering of beam cast template (1), all be fixed with the cast funnel (2) that vibrates, and the vibrate upper port height of funnel (2) of cast equates with the top edge level height of beam cast template (1).
3. top according to claim 2 has the concrete beam cast template of built-in fitting, it is characterized in that: each cast funnel (2) that vibrates is all interconnected by two blocks of side plates (2.1), a front apron (2.2) and an inclined bottom plate (2.3) respectively and forms, and two blocks of side plates (2.1) and inclined bottom plate (2.3) are fixed on the beam cast and vibrate on the bore edges of hole (1.1).
CN2010206747059U 2010-12-22 2010-12-22 Concrete beam pouring template with embedded part at top Expired - Fee Related CN201962948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206747059U CN201962948U (en) 2010-12-22 2010-12-22 Concrete beam pouring template with embedded part at top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206747059U CN201962948U (en) 2010-12-22 2010-12-22 Concrete beam pouring template with embedded part at top

Publications (1)

Publication Number Publication Date
CN201962948U true CN201962948U (en) 2011-09-07

Family

ID=44525481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206747059U Expired - Fee Related CN201962948U (en) 2010-12-22 2010-12-22 Concrete beam pouring template with embedded part at top

Country Status (1)

Country Link
CN (1) CN201962948U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561692A (en) * 2010-12-22 2012-07-11 贵阳铝镁设计研究院有限公司 Method and template for pouring concrete beam or column with embedded part at top
CN105201215A (en) * 2015-08-28 2015-12-30 济南城建集团有限公司 Mounting method of embedded part for brickwork structures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561692A (en) * 2010-12-22 2012-07-11 贵阳铝镁设计研究院有限公司 Method and template for pouring concrete beam or column with embedded part at top
CN105201215A (en) * 2015-08-28 2015-12-30 济南城建集团有限公司 Mounting method of embedded part for brickwork structures

Similar Documents

Publication Publication Date Title
CN202644997U (en) Simple plugging device for wall-penetrating holes of wall
CN202170600U (en) Anti-segregation device for concrete pouring of large-angle sloping roof
CN203247600U (en) Equipment foundation bolt preformed hole die
CN108301618A (en) A kind of steel and wood composite construction column template and its construction method
CN105952154B (en) A kind of concrete-pouring template stent
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN201962948U (en) Concrete beam pouring template with embedded part at top
CN103615075A (en) Concrete sloping roof continuous casting forming method
CN102561692A (en) Method and template for pouring concrete beam or column with embedded part at top
CN203462754U (en) Free-disassembly suspension template
CN205712565U (en) A kind of prefabricated two-sided wall
CN210658959U (en) Constructional column concrete placement construction structures of smashing
CN102121313B (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN201835524U (en) Pouring device for concrete beam with top embedded part
CN201908437U (en) Concrete column casting die plate with embedded part at top
CN207419778U (en) A kind of free removal wall body casting template device
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN206245726U (en) Built for mushroom body of constructing and with the profiled template in hole of vibrating
CN209654079U (en) Tunnel center gutter template component and its gutter structure of formation
CN210134641U (en) Construction structures is pour to concrete link plate secondary under roof beam
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN208167766U (en) A kind of simple and fast connection precast concrete plate fetal membrane
CN206376557U (en) Heavy grade Sloping roof concrete casting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20141222

EXPY Termination of patent right or utility model