CN201843324U - Shaping lifting operation platform - Google Patents

Shaping lifting operation platform Download PDF

Info

Publication number
CN201843324U
CN201843324U CN2010202593013U CN201020259301U CN201843324U CN 201843324 U CN201843324 U CN 201843324U CN 2010202593013 U CN2010202593013 U CN 2010202593013U CN 201020259301 U CN201020259301 U CN 201020259301U CN 201843324 U CN201843324 U CN 201843324U
Authority
CN
China
Prior art keywords
platform
operating platform
steel
promotes operating
scaffold floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202593013U
Other languages
Chinese (zh)
Inventor
蒯俊山
朱崇选
吴胜辉
沈凤忠
高伟轩
王永生
武特库
高云翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN2010202593013U priority Critical patent/CN201843324U/en
Application granted granted Critical
Publication of CN201843324U publication Critical patent/CN201843324U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a shaping lifting operation platform which comprises a platform skeleton, a scaffold board and four supporting legs; the scaffold board is fixed on the platform skeleton; the platform skeleton is in a rectangular shape, and comprises a frame and at least two crossbars which are connected onto the frame; both sides of both ends of the crossbars are downwards and symmetrically connected with fixed bolts; the outer side of each fixed bolt is fixedly connected with a limit plate; the supporting legs are hinged between the two fixed bolts through pin shafts; and the gravity centers of the supporting legs are arranged on the inner side of a hinge point. The operation platform has a very simple structure, is easy to manufacture, consumes little material, has light self-weight, simultaneously can bear very large load, and is very suitable to be constructed in the elevator shafts of medium- and high-rise buildings.

Description

Typing promotes operating platform
Technical field
The utility model relates to a kind of construction operation platform, particularly a kind of construction operation platform of setting up in elevator hoistways.
Background technology
There are many deficiencies in the existing construction operation platform of setting up in elevator hoistways concrete textural, for example, the operability of platform is poor, the structure of platform is relatively complicated, the too big and load-bearing of the deadweight of platform is too little etc., these problems have all influenced the construction application of platform in elevator hoistways, and construction has brought a lot of inconvenience to elevator hoistways, so be badly in need of improving.
The utility model content
The purpose of this utility model provides a kind of typing and promotes operating platform, solve that existing construction operation platform operability is poor, complex structure, load-bearing is too little, deadweight is too big technical problem.
For achieving the above object, the utility model adopts following technical scheme: a kind of typing promotes operating platform, comprise platform skeleton, scaffold floor and four legs, it is characterized in that: described scaffold floor is fixed on the platform skeleton, described platform skeleton is a rectangle, include frame and at least two stulls that are connected on the frame, both sides in the end, two ends of stull are symmetrically connected with dead bolt downwards, the outside of dead bolt is fixedly connected with limiting plate again, described leg is articulated and connected between two dead bolts by bearing pin, and the center of gravity of leg is positioned at the inboard of pin joint.
Also can be connected with the bracing piece parallel with stull on the described frame, this bracing piece is welded together by two shaped steel and forms, and two outer hoops of shaped steel have ferrule.
Described two shaped steel can one for channel-section steel, another root be i iron.
Described scaffold floor can be taken the upper surface that is placed on the platform skeleton and by steel wire and platform skeleton tighten.
Described scaffold floor can be wooden or the steel scaffold floor, and the thickness of scaffold floor is 40mm~60mm.
On leg and the contact surface of reserving the hole, can be fixedly connected with backing plate on the leg.
Suspension ring can be welded to connect on the upper surface of described stull.
Described stull can have 2~6.
Described frame can be channel-section steel, i iron, square steel or angle steel.
Compared with prior art the utlity model has following characteristics and beneficial effect: structure of the present utility model is very simple, makes to get up to be easy to, and consumptive material is few, conduct oneself with dignity and can bear very big load-carrying low the time, is fit to very much be applied in elevator hoistways on the middle and senior level and constructs.Operability of the present utility model is very good, can obviously shorten the construction operation time, the trouble of scaffold building when reducing the elevator shaft structure construction.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the schematic diagram that leg is connected with stull by dead bolt.
Fig. 3 is that the utility model embodiment one is placed in the schematic top plan view in the elevator barrel.
Fig. 4 is the schematic diagram of A-A section among Fig. 3.
Fig. 5 is the schematic diagram of B-B section among Fig. 3.
Fig. 6 is a schematic diagram of laying scaffold on the utility model.
Fig. 7 is that the platform skeleton of the utility model embodiment two is placed in the schematic top plan view in the elevator barrel.
Fig. 8 is that the platform skeleton of the utility model embodiment three is placed in the schematic top plan view in the elevator barrel.
Fig. 9 is the schematic top plan view of the platform skeleton of the utility model embodiment four.
Figure 10 is the schematic diagram of C-C section among Fig. 9.
Reference numeral: 1-elevator barrel, 2-reserve hole, 3-frame, 4-bracing piece, 5-stull, 6-leg, 7-scaffold floor, 8-suspension ring, 9-limiting plate, 10-bearing pin, 11-backing plate, 12-dead bolt, 13-scaffold, 14-ferrule.
The specific embodiment
Embodiment one is referring to shown in Fig. 1-4, this typing promotes operating platform, be placed in the elevator barrel 1, comprise platform skeleton, scaffold floor 7 and four legs 6, described scaffold floor 7 is fixed on the platform skeleton, is exactly that scaffold floor 7 is taken the upper surface that is placed on the platform skeleton and by steel wire and platform skeleton tighten specifically.Scaffold floor 7 is wooden or the steel scaffold floor, and the thickness of scaffold floor is 40mm~60mm.The platform skeleton is a rectangle, includes frame 3 and at least two stulls 5 that are connected on the frame, and wherein frame 3 is channel-section steel, i iron, square steel or angle steel, is channel-section steel in the present embodiment.Both sides in the end, two ends of stull 5 are symmetrically connected with dead bolt 12 downwards, and the outside of dead bolt 12 is fixedly connected with limiting plate 9 again, and described leg 6 is articulated and connected between two dead bolts 12 by bearing pin 10, and the center of gravity of leg 6 is positioned at the inboard of pin joint.On leg 6 and the contact surface of reserving hole 2, be fixedly connected with backing plate 11 on the leg 6, suspension ring 8 have been welded to connect on the upper surface of described stull 5, referring to Fig. 5, Fig. 6, leg 6 is placed in to be reserved in the hole 2, scaffold 13 is placed in again on the scaffold floor 7, simultaneously, for the center of gravity that guarantees leg is positioned at the inboard of pin joint, the inboard of leg 6 also is connected with balancing weight.
Referring to Fig. 7, among the embodiment two, described stull has 2.Referring to Fig. 8, among the embodiment three, described stull has 5.Referring to Fig. 9, Figure 10, among the embodiment four, described stull 5 has 3, and also be connected with the bracing piece 4 parallel on the frame 3 with stull 5, this bracing piece 4 is welded together by two shaped steel and forms, and two outer hoops of shaped steel have ferrule 14, and one of described two shaped steel are i iron for channel-section steel, another root.Bracing piece 4 in the present embodiment has two, can certainly be more.
The utility model utilizes the reservation hole docking operation platform of elevator barrel, along with the rising of operating platform, settles 4 legs that can rotate flexibly on it, successively rises to the upper strata along the borehole wall and reserves the hole.This stage apparatus possesses excellent operability, can obviously shorten the activity duration, the trouble of scaffold building when reducing the elevator shaft structure construction.

Claims (9)

1. a typing promotes operating platform, comprise the platform skeleton, scaffold floor (7) and four legs (6), it is characterized in that: described scaffold floor (7) is fixed on the platform skeleton, described platform skeleton is a rectangle, include frame (3) and be connected at least two stulls (5) on the frame, both sides in the end, two ends of stull (5) are symmetrically connected with dead bolt (12) downwards, the outside of dead bolt (12) is fixedly connected with limiting plate (9) again, described leg (6) is articulated and connected between two dead bolts (12) by bearing pin (10), and the center of gravity of leg (6) is positioned at the inboard of pin joint.
2. typing according to claim 1 promotes operating platform, it is characterized in that: also be connected with the bracing piece (4) parallel on the described frame (3) with stull (5), this bracing piece (4) is welded together by two shaped steel and forms, and two outer hoops of shaped steel have ferrule (14).
3. typing according to claim 2 promotes operating platform, it is characterized in that: one of described two shaped steel are i iron for channel-section steel, another root.
4. typing according to claim 2 promotes operating platform, it is characterized in that: described scaffold floor (7) is taken the upper surface that is placed on the platform skeleton and by steel wire and platform skeleton tighten.
5. typing according to claim 4 promotes operating platform, and it is characterized in that: described scaffold floor (7) is wooden or steel scaffold floor, and the thickness of scaffold floor is 40mm~60mm.
6. .Typing according to claim 2 promotes operating platform, it is characterized in that: on leg (6) and the contact surface of reserving hole (2), be fixedly connected with backing plate (11) on the leg (6).
7. typing according to claim 2 promotes operating platform, it is characterized in that: be welded to connect suspension ring (8) on the upper surface of described stull (5).
8. typing according to claim 2 promotes operating platform, and it is characterized in that: described stull (5) has 2~6.
9. typing according to claim 2 promotes operating platform, it is characterized in that: described frame (3) is channel-section steel, i iron, square steel or angle steel.
CN2010202593013U 2010-07-15 2010-07-15 Shaping lifting operation platform Expired - Fee Related CN201843324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202593013U CN201843324U (en) 2010-07-15 2010-07-15 Shaping lifting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202593013U CN201843324U (en) 2010-07-15 2010-07-15 Shaping lifting operation platform

Publications (1)

Publication Number Publication Date
CN201843324U true CN201843324U (en) 2011-05-25

Family

ID=44038217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202593013U Expired - Fee Related CN201843324U (en) 2010-07-15 2010-07-15 Shaping lifting operation platform

Country Status (1)

Country Link
CN (1) CN201843324U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN102979297A (en) * 2012-12-15 2013-03-20 福州市第三建筑工程公司 Hanging type stairwell operating platform mechanism and construction method thereof
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN108265986A (en) * 2018-01-24 2018-07-10 中国人民解放军63926部队 A kind of large-scale circular underground structure circulating line installation method
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method
CN110578399A (en) * 2019-08-31 2019-12-17 上海宝冶集团有限公司 Temporary operation platform in pre-assembled core barrel and construction method thereof
CN111155754A (en) * 2020-01-08 2020-05-15 甘肃建投建设有限公司 Automatic elevator shaft jacking platform and using method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN102979297A (en) * 2012-12-15 2013-03-20 福州市第三建筑工程公司 Hanging type stairwell operating platform mechanism and construction method thereof
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN108265986A (en) * 2018-01-24 2018-07-10 中国人民解放军63926部队 A kind of large-scale circular underground structure circulating line installation method
CN108265986B (en) * 2018-01-24 2020-12-18 中国人民解放军63926部队 Method for installing large circular underground structure annular pipeline
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method
CN110578399A (en) * 2019-08-31 2019-12-17 上海宝冶集团有限公司 Temporary operation platform in pre-assembled core barrel and construction method thereof
WO2021036026A1 (en) * 2019-08-31 2021-03-04 上海宝冶集团有限公司 Pre-assembled temporary operating platform in core tube and construction method therefor
CN111155754A (en) * 2020-01-08 2020-05-15 甘肃建投建设有限公司 Automatic elevator shaft jacking platform and using method thereof

Similar Documents

Publication Publication Date Title
CN201843324U (en) Shaping lifting operation platform
CN202023360U (en) Hydraulic climbing die plate for building construction
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN202831601U (en) Lifting type structural construction operation platform for elevator shaft
CN202108242U (en) Elevator shaft construction scaffold device constructed and lifted together with a building main structure by layers
CN202023353U (en) Integral lifting scaffold for building operations
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN105952129A (en) Elevator shaft combined type integral lifting operating platform and construction method thereof
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN202899608U (en) Climbing device of building construction hydraulic pressure template
CN201980944U (en) Hanging system of electric hanging basket capable of increasing loading capability and ascending system of electric hanging basket
CN210369846U (en) Operating platform capable of being clamped on elevator shaft shear wall surface and lifted layer by layer
CN204357138U (en) Simple steel structure lifting upending frame
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN203499232U (en) Attached lifting scaffold
CN204326487U (en) A kind of novel movable lift-type hoistway operation platform
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN203603438U (en) Movable operating platform for elevator shaft
CN205777434U (en) A kind of hoistway operation rack device
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN205531262U (en) Steel construction construction platform can rise automatically
CN109505234A (en) A kind of bridge vase pier connecting frame structure and its construction method
CN216105611U (en) Connecting and fixing device for hoisting steel structure for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20130715