CN108265986A - A kind of large-scale circular underground structure circulating line installation method - Google Patents

A kind of large-scale circular underground structure circulating line installation method Download PDF

Info

Publication number
CN108265986A
CN108265986A CN201810065921.4A CN201810065921A CN108265986A CN 108265986 A CN108265986 A CN 108265986A CN 201810065921 A CN201810065921 A CN 201810065921A CN 108265986 A CN108265986 A CN 108265986A
Authority
CN
China
Prior art keywords
movable platform
underground structure
flat surface
circulating line
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810065921.4A
Other languages
Chinese (zh)
Other versions
CN108265986B (en
Inventor
王坤
蔡亮亮
赵浩
魏学杰
张澍良
万同
武军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
63926 Troops Of Pla
Original Assignee
63926 Troops Of Pla
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 63926 Troops Of Pla filed Critical 63926 Troops Of Pla
Priority to CN201810065921.4A priority Critical patent/CN108265986B/en
Publication of CN108265986A publication Critical patent/CN108265986A/en
Application granted granted Critical
Publication of CN108265986B publication Critical patent/CN108265986B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of large-scale circular underground structure circulating line installation methods, stir yourself platform is installed in round underground structure, support is provided for assembled, processing, welding, mapping installation process, it can provide to stablize to support and construction personnel's safety is effectively ensured, and increase work surface raising Pipe installing efficiency by setting up scaffold in movable platform, mapping promise Pipe installing precision is provided.Using the method for the present invention, construction personnel can carry out operation on the entire inner wall of round underground structure simultaneously based in stable movable platform; and pass through movable platform and detach levels; ensure the safety of construction personnel below movable platform, and stable mapping basis can be provided, improve installation accuracy.

Description

A kind of large-scale circular underground structure circulating line installation method
Technical field
The present invention relates to pipelaying techniques field in technical field of building construction more particularly to underground structure, specially A kind of large-scale circular underground structure circulating line installation method.
Background technology
The existing method that circulating line is installed in large-scale circular underground structure is to carry constructor with lifting equipment handling The hanging basket of member and a variety of materials, the component such as pipeline, are installed one by one in round underground structure, have the suspension centre activity unstable, vertical The shortcomings that straight operational hazards are more, the small efficiency of working face is low, unwrapping wire difficult low precision, hanging basket area is small, low bearing capacity, it is difficult to install Scale and the larger component of weight, and need to occupy special handling appliance for a long time, installation cost is very high.
Invention content
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of large-scale circular undergrounds Structure annular pipe installation method.The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of large-scale circular underground structure circulating line installation method, includes the following steps:
Step 1:During civil construction, the pre- buried layer of multiple and different level heights is set in round underground structure wall, it is each pre- Buried layer sets the pre-buried site of at least three, and the pre-buried site location of different pre- buried layers is corresponding;Each pre-buried site is respectively provided with pre-buried Reinforcing bar, embedded bar one end are exposed to round underground structure inner space for installation activity platform slot pedestal;
Step 2:After movable platform slot floor installation, by movable platform handling into round underground structure, the activity is put down Platform includes the fixed support column of flat surface and flat surface bottom on top;The number of the support column and installation site and the work Moving platform slot pedestal is corresponding, is fixed with the mode and flat surface bottom of welding;The number of the support column and installation site It is corresponding with the movable platform slot pedestal;Support column is inserted into the movable platform slot pedestal of the pre- buried layer of top layer, It is fixed with bolt;
Step 3:Mapping movable platform is set up in movable platform, carries out mapping unwrapping wire;
Step 4:Scaffold, pipe laying stent are set up in movable platform;
Step 5:Pipe laying;
Step 6:Fixing bolt is dismantled after the completion of the Pipe installing of top layer, downward handling movable platform, support column is inserted successively In the movable platform slot pedestal for entering next pre- buried layer, and step 3 is repeated to step 5, until Pipe installing finishes;
Step 7:Movable platform is dismantled, movable platform handling is gone out into round underground structure.
Further, flat surface described in step 2 is welded for steel plate, under have made of channel steel keel as support, Centre has the hole with cover board to be used for surveying and drawing lead.
Further, in step 3 above movable platform, by the use of the pipe built-in casing on round underground structure wall as Support, sets up mapping movable platform, carries out mapping unwrapping wire.
Further, flat surface is integral planar.
Further, the concrete operations of step 5 include:Handling pipeline and related components splice pipeline;Measure installation essence Degree carries out position adjustment;Intersection is cut, retaining wall on slope, welding tee, elbow are connected with main pipeline;It is fixed with U-shaped card Pipeline location;Acid wash passivation, rust prevention by applying liquid material paint.
Further, scaffold can be removed in step 5 after pipe laying or by scaffold and movable platform one Next layer is transported in lifting.
Further, at least two movable platform suspension centres are provided in the flat surface of movable platform.
The beneficial effects of the invention are as follows:
1. construction personnel in stable movable platform or by scaffold building based in movable platform, improving stability;
2. can operation be carried out on the entire inner wall of round underground structure simultaneously, installation effectiveness is improved;
3. detaching levels by movable platform, reduce security risk, it is ensured that the safety of construction personnel below movable platform;
4. providing stable mapping unwrapping wire basis, installation accuracy is improved.
Invention is described in detail with reference to the accompanying drawings and examples.
Description of the drawings
Fig. 1 working section figures of the present invention;
Fig. 2 is movable platform bottom view.
Description of symbols in figure:
1- movable platforms;12- support columns;13- movable platform suspension centres;14- steel plates;15- keel;16- has the mapping hole of cover board; 17- support column diagonal braces;2- movable platform slot pedestals;21-embedded bar;3- circle underground structure walls.
Specific embodiment
As shown in Figure 1, a kind of large-scale circular underground structure circulating line installation method, includes the following steps:
Step 1:During civil construction, the pre- buried layer of multiple and different level heights is set in round underground structure wall 3, it is each pre- Buried layer sets the pre-buried site of at least three, and the pre-buried site location of different pre- buried layers is corresponding;Each pre-buried site is respectively provided with pre-buried Reinforcing bar 21, embedded bar one end are exposed to round underground structure inner space for installation activity platform slot pedestal 2;
Step 2:After movable platform slot pedestal 2 installs, by 1 handling of movable platform into round underground structure, the activity Platform 1 includes the fixed support column 12 of flat surface and flat surface bottom on top, separately there is the fixed support of the auxiliary of support column diagonal brace 17 Column 12;The flat surface is welded for steel plate 14, is integral planar, under have keel 15 made of channel steel as support, it is intermediate There is the hole 16 with cover board to be used for surveying and drawing lead, the number of the support column 12 and installation site and the movable platform slot Pedestal 2 is corresponding;Support column 12 is inserted into the movable platform slot pedestal 2 of the pre- buried layer of top layer, is fixed with bolt;
Step 3:Above movable platform, by the use of the pipe built-in casing on round underground structure wall as support, mapping is set up Movable platform carries out mapping unwrapping wire;
Step 4:Scaffold, pipe laying stent are set up in movable platform 1;
Step 5:Pipe laying:Handling pipeline and related components splice pipeline;Installation accuracy is measured, carries out position adjustment;It cuts Intersection, retaining wall on slope are cut, welding tee, elbow are connected with main pipeline;With U-shaped card fixed -piping position;Acid wash passivation, Rust prevention by applying liquid material paint;
Scaffold can be removed in step 5 after pipe laying;It can be by scaffold and activity but if lifting conditions permit Platform together handling to next layer;
Step 6:Fixing bolt is dismantled after the completion of the Pipe installing of top layer, successively downward handling movable platform 1, by support column 12 It is inserted into the movable platform slot pedestal 2 of next pre- buried layer, and repeats step 3 to step 5, until Pipe installing finishes;
Step 7:Movable platform is dismantled, movable platform handling is gone out into round underground structure.
At least two movable platform suspension centres 13 are provided in the flat surface of movable platform 1 convenient for lifting, lifting point can weld It is connected in movable platform.

Claims (7)

1. a kind of large-scale circular underground structure circulating line installation method, it is characterised in that:Include the following steps:
Step 1:During civil construction, the pre- buried layer of multiple and different level heights is set in round underground structure wall, it is each pre- Buried layer sets the pre-buried site of at least three, and the pre-buried site location of different pre- buried layers is corresponding;Each pre-buried site is respectively provided with pre-buried Reinforcing bar, embedded bar one end are exposed to round underground structure inner space for installation activity platform slot pedestal;
Step 2:After movable platform slot floor installation, by movable platform handling into round underground structure, the activity is put down Platform includes the fixed support column of flat surface and flat surface bottom on top;The number of the support column and installation site and the work Moving platform slot pedestal is corresponding, is fixed with the mode and flat surface bottom of welding;Support column is inserted into the pre- buried layer of top layer Movable platform slot pedestal in, fixed with bolt;
Step 3:Above movable platform, mapping movable platform is set up, carries out mapping unwrapping wire;
Step 4:Scaffold, pipe laying stent are set up in movable platform;
Step 5:Pipe laying;
Step 6:Fixing bolt is dismantled after the completion of the Pipe installing of top layer, downward handling movable platform, support column is inserted successively In the movable platform slot pedestal for entering next pre- buried layer, and step 3 is repeated to step 5, until Pipe installing finishes;
Step 7:Movable platform is dismantled, movable platform handling is gone out into round underground structure.
2. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:In step 2 The flat surface is steel plate, and there are keel made of channel steel in flat surface lower part as supporting, have the hole with cover board among flat surface Hole is used for surveying and drawing lead.
3. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:In step 3 Above movable platform, by the use of the pipe built-in casing on round underground structure wall as supporting, mapping movable platform is set up, into Row mapping unwrapping wire.
4. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:Step 5 Concrete operations include:Handling pipeline and related components splice pipeline;Installation accuracy is measured, carries out position adjustment;Cutting is mutually passed through Line, retaining wall on slope, welding tee, elbow are connected with main pipeline;With U-shaped card fixed -piping position;Acid wash passivation, spraying are anti- Rust paint.
5. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:In step 5 Can be removed after pipe laying scaffold or by scaffold together with movable platform handling to next layer.
6. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:Movable platform Flat surface on be provided at least two movable platform suspension centres.
7. large-scale circular underground structure circulating line installation method according to claim 1, it is characterised in that:Flat surface is Integral planar.
CN201810065921.4A 2018-01-24 2018-01-24 Method for installing large circular underground structure annular pipeline Expired - Fee Related CN108265986B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810065921.4A CN108265986B (en) 2018-01-24 2018-01-24 Method for installing large circular underground structure annular pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810065921.4A CN108265986B (en) 2018-01-24 2018-01-24 Method for installing large circular underground structure annular pipeline

Publications (2)

Publication Number Publication Date
CN108265986A true CN108265986A (en) 2018-07-10
CN108265986B CN108265986B (en) 2020-12-18

Family

ID=62776356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810065921.4A Expired - Fee Related CN108265986B (en) 2018-01-24 2018-01-24 Method for installing large circular underground structure annular pipeline

Country Status (1)

Country Link
CN (1) CN108265986B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201437633U (en) * 2009-05-27 2010-04-14 中建三局建设工程股份有限公司 Elevator shaft shaping operation platform
CN201843324U (en) * 2010-07-15 2011-05-25 中国建筑第二工程局有限公司 Shaping lifting operation platform
CN104453199A (en) * 2014-11-24 2015-03-25 西安市建筑工程总公司 Elevator shaft construction operation platform
CN206233545U (en) * 2016-10-26 2017-06-09 中国建筑第八工程局有限公司 For the pipeline installation rack of piping shaft
CN206554485U (en) * 2017-02-22 2017-10-13 中建六局建设发展有限公司 Hoisting type operating platform in a kind of vertical shaft

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201437633U (en) * 2009-05-27 2010-04-14 中建三局建设工程股份有限公司 Elevator shaft shaping operation platform
CN201843324U (en) * 2010-07-15 2011-05-25 中国建筑第二工程局有限公司 Shaping lifting operation platform
CN104453199A (en) * 2014-11-24 2015-03-25 西安市建筑工程总公司 Elevator shaft construction operation platform
CN206233545U (en) * 2016-10-26 2017-06-09 中国建筑第八工程局有限公司 For the pipeline installation rack of piping shaft
CN206554485U (en) * 2017-02-22 2017-10-13 中建六局建设发展有限公司 Hoisting type operating platform in a kind of vertical shaft

Also Published As

Publication number Publication date
CN108265986B (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN104866659B (en) Steel construction integral hoisting method based on BIM
CN208056682U (en) Bracing means in ancient building
CN103556823B (en) The construction method of lamina tecti form bracing system made by silo sliding formwork operating platform
CN103669634B (en) Construction method and the structure of after-pouring damping wall
CN104420694A (en) General mounting method for benzene hydrogenation engineering tower equipment
CN111675111A (en) Boiler hoisting sling in closed plant area and construction method
CN205637525U (en) Temporary supporting platform for super high-rise building equipment
CN109736591A (en) A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof
CN108265986A (en) A kind of large-scale circular underground structure circulating line installation method
CN102642790B (en) A kind of computer-controlled hydraulic jacking system
CN213976724U (en) Curtain cell cube track hoisting structure
CN103174300B (en) Viscous damper installation construction method
CN102704952B (en) Self-propelled tunnel grouting trolley
CN210827478U (en) Deep foundation pit underground structure reverse construction method steel pipe column positioning device
CN104045014A (en) Pole arraying frame for pole welding
CN209975999U (en) Anticorrosive platform of flat type storage tank inner wall rust cleaning
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN207332281U (en) A kind of movable operation platform for being used to overhang I-steel dismounting
CN209670395U (en) A kind of ruggedized construction suitable for building hoist basement roof
CN112110330B (en) Curtain wall unit body rail hoisting system and method
CN106065689B (en) High-rise steel structure construction of frame beam method
CN217151483U (en) Measurement encryption point matching device for nuclear power station
CN110747875A (en) Construction method for building scaffold for open caisson construction of cyclone tank
CN110130629A (en) A kind of platybasic type reservoir walls derusting anti-corrosive platform and method
CN110206298A (en) A kind of optimization sliding-mode structure construction technology for the matrix side storehouse that misplaces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201218