A kind of ruggedized construction suitable for building hoist basement roof Download PDFInfo
- Publication number
- CN209670395U CN209670395U CN201920237058.6U CN201920237058U CN209670395U CN 209670395 U CN209670395 U CN 209670395U CN 201920237058 U CN201920237058 U CN 201920237058U CN 209670395 U CN209670395 U CN 209670395U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- guide rail
- basement roof
- building hoist
- connection system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of ruggedized construction suitable for building hoist basement roof, including connection system for guide rail and hard rubber buffer layer;Connection system for guide rail is arranged on basement bottom board, and specially bowl fastening type or Bayenet type steel tube scaffold system, and connection system for guide rail upper end is equipped with basement roof, is equipped with building hoist above basement roof;Hard rubber buffer layer is disposed between lifter foundation and basement roof;Connection system for guide rail specifically includes steel pipe support vertical rod, horizon bar and bridging, and steel pipe support vertical rod constitutes the basic framework of scaffold frame body, and horizon bar level is set between upright bar, and bridging is arranged in the outer periphery and internal vertical, horizontal of scaffold frame body;Wherein, the top Yu bottom end of steel pipe support vertical rod further respectively have jacking, heelpiece.The utility model uses bowl fastening type or spigot-and-socket scaffold system, and cooperates the structures such as jacking, heelpiece, keel, it is ensured that stress transmitting reaches good basement roof consolidation effect.
Description
Technical field
The utility model relates to technical field of building construction, more particularly to one kind to be suitable for building hoist basement roof
Ruggedized construction.
Background technique
With the development of the city and the exploitation of the underground space, large size city synthesis gradually increase, underground garage with live
Residence building is connected.In work progress, building hoist be must be necessarily arranged on basement roof, the live load that building hoist generates
Load and impact load, it is hardened to underground ceiling to be configured to adversely affect, in some instances it may even be possible to lead to the cracking of basement roof structure.Cause
This, it is necessary to anti-top support is carried out to the basement roof structure in building hoist basic scope.In this regard, most common branch
Support method is to be reinforced using fashioned iron rigid steel pile or the anti-top support of thick steel pipe, but the two cannot be guaranteed consolidation effect, steel column with
Concrete slab contact is not easy to guarantee closely, to influence instead to push up stressed effect.
Accordingly, it is badly in need of the ruggedized construction that a kind of consolidation effect is preferably suitable for building hoist basement roof at present.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of consolidation effects to be preferably suitable for lifting of constructing
The ruggedized construction of machine basement roof.
The utility model solves above-mentioned technical problem using following technical scheme:
A kind of ruggedized construction suitable for building hoist basement roof, including connection system for guide rail and hard rubber buffer
Layer;The connection system for guide rail is arranged on basement bottom board, and specially bowl fastening type or Bayenet type steel tube scaffold system, foot
The upper end of hand cradle system is equipped with basement roof, and the top of basement roof is equipped with building hoist;The building hoist
Junction between lifter foundation and basement roof there also is provided hard rubber buffer layer;
The connection system for guide rail specifically includes steel pipe support vertical rod, horizon bar and bridging, the steel pipe support vertical rod structure
At the basic framework of scaffold frame body, horizon bar is horizontally placed between each steel pipe support vertical rod, and bridging is respectively arranged in foot
The outer periphery of hand cradle frame body and internal vertical, horizontal;Wherein, the top Yu bottom end of the steel pipe support vertical rod further respectively have top
It holds in the palm, heelpiece, is provided with keel in jacking, keel directly hold out against the bottom surface in basement roof.
One of preferred embodiment as the utility model, the horizon bar include longitudinal horizontal rod and horizontal rod, are indulged
The lateral stiffening feature of steel pipe support vertical rod is collectively formed to horizon bar and horizontal rod;The bridging includes vertical scissors
Support and horizontal cross brace, vertical bridging is arranged along 45 degree of angles of surrounding of outside steel pipe support vertical rod, and continuous setting is erected to top
The horizontal cross brace is then provided with to the top intersection point plane of bridging;The vertical bridging and horizontal cross brace are common
Constitute the vertical ruggedized construction of steel pipe support vertical rod.
One of preferred embodiment as the utility model is additionally provided with longitudinal bar of sweeping the floor on the connection system for guide rail, laterally sweeps
The thin end of the scroll;Longitudinal direction bar of sweeping the floor is fixed on using the connection type of bowl fastening type or spigot-and-socket and is not more than apart from basement bottom board
On steel pipe support vertical rod at 200mm, bar of laterally sweeping the floor then is fixed on the steel pipe support vertical rod below longitudinal bar of sweeping the floor.
One of preferred embodiment as the utility model, longitudinal direction bar of sweeping the floor are set with the bar of sweeping the floor laterally swept the floor where bar
It sets and is additionally provided with the second horizontal cross brace on layer.
One of preferred embodiment as the utility model, the steel pipe in the connection system for guide rail are all made of 48 × 3.0mm of Φ
Steel pipe uses bowl fastening type or bayonet joint between each steel pipe.
One of preferred embodiment as the utility model, the building hoist are specially that SC200/200 type people's goods is dual-purpose
Building hoist, specification are 0.65 × 0.65 × 1.508m;The guide rail of the building hoist is set near structural column, guide rail
It is 0.65 × 0.65m with ground contact surface;The size of the lifter foundation is 5600mm × 4200mm, with a thickness of 330mm, is mixed
Solidifying soil strength grade is C30.
One of preferred embodiment as the utility model, the hard rubber buffer layer with a thickness of 30mm.
One of preferred embodiment as the utility model, the heelpiece are specially 16# channel steel, and heelpiece puts direction with after
It is parallel to pour band, and elongated setting.
The arrangement range of one of preferred embodiment as the utility model, the connection system for guide rail is specially lifter foundation
And its every increased 1-1.5m stressing influence range in side;Wherein, the connection system for guide rail at saddle position, post-cast strip position scaffold
The size or structure of system and outer, in reinforcing scope the connection system for guide rail of saddle range are not exactly the same.
One of preferred embodiment as the utility model, the saddle range is outer, in the connection system for guide rail in reinforcing scope,
The vertically and horizontally spacing of each steel pipe support vertical rod is less than or equal to 600 × 600mm, and upright bar step pitch is less than or equal to 1200mm;It is described
The free end height of jacking is no more than 500mm, is provided with 100 × 100mm rough ground or 16# I-shaped steel joist in jacking, accordingly
Keel directly hold out against the bottom surface in basement roof.
One of preferred embodiment as the utility model, in the connection system for guide rail at the saddle position, each steel pipe support is vertical
The vertically and horizontally spacing of bar is less than or equal to 300 × 300mm, and upright bar step pitch is less than or equal to 1200mm;The free end of the jacking
Height is no more than 500mm, is provided with 100 × 100mm rough ground or 16# I-shaped steel joist in jacking to encrypt anti-top and reinforce, adds
Close range 1.2m × 1.2m.
One of preferred embodiment as the utility model, in the connection system for guide rail at the post-cast strip position, post-cast strip two sides
It is respectively arranged 2-3 row's steel pipe support vertical rod, for the vertically and horizontally spacing of each steel pipe support vertical rod less than 600 × 600mm, upright bar step pitch is small
In or equal to 1200mm;The free end height of the jacking is no more than 500mm, is provided with 16# I-shaped steel joist, 16# in jacking
I-steel keel top is provided with 100 × 100mm rough ground as secondary joist, and secondary joist is directly held out against under basement roof
Bottom surface.
Application principle:
Using the transfer principle and pressure law of power, building hoist load is transmitted on lifter foundation, elevator
The load of floor that basis and basis are contacted passes through supporting rod together and is transmitted on Base isolation system, makes the basement of construction part
Top plate is in the equilibrium state of power;Meanwhile one layer of hard rubber buffer layer is arranged in lifter foundation and basement roof junction,
Influence of the elevator impact lotus to structure can further be reduced.
The utility model compared with prior art the advantages of be:
(1) the utility model use bowl fastening type or spigot-and-socket scaffold system, and cooperate jacking, heelpiece, rough ground (or,
I-shaped steel joist) etc., it is ensured that stress transmitting reaches and holds out against effect;
(2) the utility model is structurally reasonable, quick construction is flexible, applied widely, can be adjusted and be added according to varying environment
Gu range is especially encountering post-cast strip location arrangements elevator, effect is more excellent;
(3) at low cost, economic benefit, social benefit show huge.
Detailed description of the invention
Fig. 1 is the integral planar layout drawing in embodiment 1 suitable for the ruggedized construction of building hoist basement roof;
Fig. 2 is the whole facade layout drawing in embodiment 1 suitable for the ruggedized construction of building hoist basement roof;
Fig. 3 is the facade layout drawing of post-cast strip position ruggedized construction in embodiment 1.
In figure: 1 is connection system for guide rail, and 11 be scaffold frame body, and 12 be steel pipe support vertical rod, and 121 be jacking, and 1211 be dragon
Bone, 12111 be 16# I-shaped steel joist, and 12112 be 100 × 100mm rough ground, and 122 be 16# channel steel heelpiece, and 13 be level
Bar, 131 be longitudinal horizontal rod, and 132 be horizontal rod, and 14 be bridging, and 141 be vertical bridging, and 142 be horizontal cross
Support, 2 be hard rubber buffer layer, and 3 be basement bottom board, and 4 be basement roof, and 5 be lifter foundation, and 6 be post-cast strip, and 7 be to lead
Frame.
Specific embodiment
It elaborates below to the embodiments of the present invention, the present embodiment before being with technical solutions of the utility model
It puts and is implemented, the detailed implementation method and specific operation process are given, but the protection scope of the utility model is unlimited
In following embodiments.
Embodiment 1
As shown in Figure 1-3, a kind of ruggedized construction suitable for building hoist basement roof of the present embodiment, including foot
Hand cradle system 1 and hard rubber buffer layer 2.Wherein, connection system for guide rail 1 is arranged on basement bottom board 3, and specially bowl fastening type
Or Bayenet type steel tube scaffold system, the upper end of connection system for guide rail 1 are equipped with basement roof 4, the top of basement roof 4 is equipped with
Building hoist.Junction between the lifter foundation 5 and basement roof 4 of building hoist is disposed with one layer of 30mm thickness
Hard rubber buffer layer 2.
Connection system for guide rail 1 specifically includes steel pipe support vertical rod 12, horizon bar 13 and bridging 14, wherein steel pipe support is vertical
The basic framework of the composition scaffold frame body 11 of bar 12.Horizon bar 13 is horizontally placed between each steel pipe support vertical rod 12, and specific
Including longitudinal horizontal rod 131 and horizontal rod 132, longitudinal horizontal rod 131 and transversely and horizontally 132 bars collectively form steel pipe support
The lateral stiffening feature of upright bar 12.Bridging 14 is arranged in the outer periphery and internal vertical, horizontal of scaffold frame body 11, and specific
Including vertical bridging 141 and horizontal cross brace 142,45 degree of surrounding along outside steel pipe support vertical rod 12 of vertical bridging 141
Angle setting, and continuous setting is then provided with the (arrangement of horizontal cross brace 142 to pushing up at the top intersection point plane of vertical bridging 141
Vertical, horizontal inside scaffold frame body 11);Above-mentioned vertical bridging 141 and horizontal cross brace 142 collectively form steel pipe support
The vertical ruggedized construction of upright bar 12.The top and bottom end of the steel pipe support vertical rod 12 further respectively have jacking 121,16# channel steel
Heelpiece 122 processed;Keel 1211 are provided in jacking 121, keel 1211 are directly held out against in the bottom surface of basement roof 4;16# slot
Steel heelpiece to put direction parallel with post-cast strip 6, and elongated setting.
Further, the steel pipe in connection system for guide rail 1 is all made of Φ 48 × 3.0mm steel pipe, and bowl is used between each steel pipe
Button or bayonet joint.
Further, it is additionally provided with longitudinal bar (not indicating in figure) of sweeping the floor on connection system for guide rail 1, laterally sweeps the floor bar (in figure not
Mark).Bar of longitudinally sweeping the floor is fixed on apart from basement bottom board 3 using the connection type of bowl fastening type or spigot-and-socket no more than 200mm
On the steel pipe support vertical rod 12 at place, bar of laterally sweeping the floor then is fixed on the steel pipe support vertical rod 12 below longitudinal bar of sweeping the floor.
The longitudinal direction, which is swept the floor, to be additionally provided with the second horizontal cross brace on bar and the bar setting layer of sweeping the floor laterally swept the floor where bar and (does not mark in figure
Show).
Further, building hoist is specially the dual-purpose building hoist of SC200/200 type people's goods, and specification is 0.65 ×
0.65×1.508m;The guide rail of building hoist is set near structural column, and guide rail and ground contact surface are 0.65 × 0.65m;
The size of lifter foundation 5 is 5600mm × 4200mm, with a thickness of 330mm, strength grade of concrete C30.
In addition, the arrangement range about above-mentioned connection system for guide rail 1, is specially that lifter foundation 5 and its every side are increased
1-1.5m stressing influence range;Wherein, the connection system for guide rail 1 at 7 position of saddle, 6 position of post-cast strip connection system for guide rail 1 and lead
The size or structure of outer, in reinforcing scope the connection system for guide rail 1 of 7 range of frame are not exactly the same.
In connection system for guide rail 1 outside 7 range of saddle, in reinforcing scope, the vertically and horizontally spacing of each steel pipe support vertical rod 12
Less than or equal to 600 × 600mm, upright bar step pitch is less than or equal to 1200mm;The free end height of the jacking 121 is no more than
500mm, 100 × 100mm rough ground 12112 or 16# I-shaped steel joist 12111 are provided in jacking 121, and corresponding keel 1211 are straight
It connects and holds out against in the bottom surface of basement roof 4.
In the connection system for guide rail 1 at 7 position of saddle, the vertically and horizontally spacing of each steel pipe support vertical rod 12 is less than or equal to 300
× 300mm, upright bar step pitch are less than or equal to 1200mm;The free end height of the jacking 121 is no more than 500mm, in jacking 121
100 × 100mm rough ground 12112 or 16# I-shaped steel joist 12111 is provided with to reinforce with the anti-top of encryption, encryption range 1.2m ×
1.2m。
In the connection system for guide rail 1 at 6 position of post-cast strip, 6 two sides of post-cast strip are respectively arranged 2-3 row's steel pipe support vertical rod, respectively
The vertically and horizontally spacing of steel pipe support vertical rod 12 is less than or equal to 1200mm less than 600 × 600mm, upright bar step pitch;The jacking 121
Free end height be no more than 500mm, be provided with 16# I-shaped steel joist 12111,16# I-shaped steel joist 12111 in jacking 121
Top is provided with 100 × 100mm rough ground 12112 as secondary joist, and secondary joist is directly held out against in the bottom of basement roof 4
Face.
Principle:
Using the transfer principle and pressure law of power, building hoist load is transmitted on lifter foundation 5, elevator
The load of floor that basis 5 and basis are contacted passes through supporting rod together and is transmitted on Base isolation system, makes the underground of construction part
Ceiling plate 4 is in the equilibrium state of power;Meanwhile arranging that one layer of hard rubber is slow in lifter foundation 5 and 4 junction of basement roof
Layer 2 is rushed, influence of the elevator impact lotus to structure can be further reduced.
Reinforcement means:
(1) determine building hoist and its installation site:
According to the vertical cart-load of woods material needs of engineering skyscraper, suitable lifting means, i.e. selection SC200/200 type people's goods are selected
Dual-purpose building hoist;Building hoist is mounted on basement roof 4, guide rail is arranged near structural column;
(2) lifter foundation is determined:
The actual conditions of the key dimension and scene that are provided according to building hoist service manual, are arranged lifter foundation 5,
Having a size of the ㎜ of 5600 ㎜ × 4200, with a thickness of 330 ㎜, strength grade of concrete C30;
Meanwhile in order to reduce influence of the building hoist lifting to floor, one layer 30 is laid in the bottom of lifter foundation 5
The rubber slab of ㎜ thickness makees hard rubber buffer layer 2;
(3) force analysis, checking computations:
4 beam of basement roof, plate, the post design bearing capacity of analysis and research building hoist installed position;Analytical calculation
The maximum working load of building hoist;Calculate the difference of 4 design bearing capacity of basement roof and construction elevator maximum working load
Value;
(4) unwrapping wire, positioning:
Anti- top reinforcing area is determined according to arrangement and method for construction;Before reinforcing, basement bottom board 3 in region must be cleaned out, and
12 position line of steel pipe support vertical rod is popped up, guarantees the accurate of upright bar position;
(5) it reinforces:
Ruggedized construction includes connection system for guide rail 1 and above-mentioned hard rubber buffer layer 2;Wherein, connection system for guide rail 1 is arranged in underground
Between room bottom plate 3 and basement roof 4, and specifically use bowl fastening type or Bayenet type steel tube scaffold system;Connection system for guide rail 1 wraps
Steel pipe support vertical rod 12, horizon bar 13 and bridging 14 are included, steel pipe support vertical rod 12 constitutes the basic framework of scaffold frame body 11,
Horizon bar 13 is horizontally placed between each steel pipe support vertical rod 12, and bridging 14 was respectively arranged in the outside of scaffold frame body 11 week
Side and internal vertical, horizontal;The top of steel pipe support vertical rod 12 and bottom end are also separately installed with jacking 121, heelpiece, in jacking 121
Keel 1211 are provided with, keel 1211 are directly held out against in the bottom surface of basement roof 4;
Reinforcing scope is specially the increased 1-1.5m stressing influence range of lifter foundation 5 and its every side;Wherein, saddle 7
The structure of outer, in reinforcing scope the connection system for guide rail 1 of position, 6 position of post-cast strip and 7 range of saddle is essentially identical, difference
Locate as follows:
7 range of saddle is outer, in the connection system for guide rail 1 in reinforcing scope, each steel pipe support vertical rod 12 vertically and horizontally between
Away from 600 × 600mm is less than or equal to, upright bar step pitch is less than or equal to 1200mm;The free end height of 121 supports of the top is no more than
500mm, 100 × 100mm rough ground 12112 or 16# I-shaped steel joist 12111 are provided in jacking 121, and corresponding keel 1211 are straight
It connects and holds out against in the bottom surface of basement roof 4.
In the connection system for guide rail 1 at 7 position of saddle, the vertically and horizontally spacing of each steel pipe support vertical rod 12 is less than or equal to
300 × 300mm, upright bar step pitch are less than or equal to 1200mm;The free end height of the jacking 121 is no more than 500mm, jacking
It is provided with 100 × 100mm rough ground 12112 or 16# I-shaped steel joist 12111 in 121 to encrypt anti-top and reinforce, encrypts range
1.2m×1.2m;
In the connection system for guide rail 1 at 6 position of post-cast strip, 6 two sides of post-cast strip are respectively arranged 2-3 row's steel pipe support vertical rod,
The vertically and horizontally spacing of each steel pipe support vertical rod 12 is less than or equal to 1200mm less than 600 × 600mm, upright bar step pitch;The jacking
121 free end height is no more than 500mm, is provided with 16# I-shaped steel joist 12111,16# I-shaped steel joist top in jacking 121
12111 ends are provided with 100 × 100mm rough ground 12112 as secondary joist, and secondary joist is directly held out against under basement roof 4
Bottom surface;
(6) peace of building hoist, tear open:
Building hoist installation removes and is responsible for progress by professional contingent, special operation workers;
(7) dismounting of lifter foundation 5:
After building hoist use, the dismounting of lifter foundation 5 is carried out;When dismounting, piecemeal cutting is carried out, and is paid attention to pair
Original structure top plate carries out finished product protection;
(8) dismounting of connection system for guide rail 1:
After the dismounting of lifter foundation 5, scaffold frame body 11 can be from top to bottom removed;The dismounting of scaffold frame body 11,
It is carried out by " first prop up and tear open afterwards, that props up afterwards first tears open " principle;When support removing, fence and caution notice are set in its periphery, and send
Special messenger guard forbids non-operator to enter interior.
The application of the present embodiment:
The present embodiment structure is respectively applied to following engineering:
(1) riverfront garden 1#、4#Building engineering is located at Hefei City, the road Wei Wu, Changfeng County and the road Ying Zhou with one voice, and overall floorage is
31357m2, wherein the building 1# is 28 floor frame-shear structure, and building is total 86.3 meters high, and 81.2 meters of accessible roof absolute altitude, the building 4# is 32 floor
Frame-shear structure, building is total 97.9 meters high, and accessible roof absolute altitude is 92.8 meters.Outdoor basement roof is that cast-in-place hollow overlaps building
Plate, plate thickness 550mm, basement clear height 3.7m.According to this engineering high-rise residential engineering masonry construction and fitting-up project amount,
2 dual-purpose building hoists of SC200/200 type people's goods are selected, are limited by construction site, elevator is mounted on basement roof,
Wherein, the building 4# building hoist is mounted at post-cast strip.The engineering went into operation on October 20th, 2013, and on April 12nd, 2015 completes
Work.
(2) it includes 5 11 floor, 1 10 floor, 56 floor, 15 floor house, 53 floor that peace, which builds LongXi mountain villa first stage of the project,
Retail shop, 52176.83 ㎡ of overall floorage, building maximum height are 38.3m;Basement roof is in-situ reinforced concrete slab,
Plate thickness is 300mm, the high 3.8m of underground garage structure layer.The building 7#, 8#, 9#, 10#, 11#, 12#, 19#, 20#, 21# room located underground
On top plate, SCD100/100 type building hoist is selected to be mounted on basement roof, wherein the building 7#, 8#, 9# building hoist
It is mounted at post-cast strip.The engineering went into operation on January 1st, 2015, and on June 1st, 2016 is completed.
(3) it includes 6 eleventh floor residential buildings and 1 underground garage, overall floorage that peace, which builds LongXi mountain villa the second stage of the project,
48839.07㎡.Wherein 31987.89 ㎡ of residential building construction area, building height 32.2m;Basement roof is mixed for cast in place reinforced bar
Solidifying Tulou plate, plate thickness 300mm, the high 3.8m of underground garage structure layer.The building 6#, 7#, 12#, 13#, 17#, 18# ceiling located underground
On plate, SCD100/100 type building hoist is selected to be mounted on basement roof, wherein the building 6#, the building 13# building hoist peace
At post-cast strip.The engineering went into operation on September 15th, 2015, and building hoist is all removed at present.
By the riverfront garden 1 of my company's construction#、4#Building engineering and peace build LongXi mountain villa first and second phases of projects basement roof
The practice test of more building hoists of upper installation, the technology ensure building hoist basis to be located on building top plate and adopt
It is applied successfully with the construction technology of reinforcing;Compared by technology and economic both sides, it was demonstrated that the technology has safe and reliable, warp
Ji be applicable in, convenient, flexible feature, provide engineering example for its high-building construction under special operation condition, be worthy to be popularized.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (10)
1. a kind of ruggedized construction suitable for building hoist basement roof, which is characterized in that including connection system for guide rail and firmly
Cushion rubber layer;The connection system for guide rail is arranged on basement bottom board, and specially bowl fastening type or spigot-and-socket steel pipe feet hand
Frame system, the upper end of connection system for guide rail are equipped with basement roof, and the top of basement roof is equipped with building hoist;The construction
Junction between the lifter foundation and basement roof of elevator there also is provided hard rubber buffer layer;
The connection system for guide rail specifically includes steel pipe support vertical rod, horizon bar and bridging, and the steel pipe support vertical rod constitutes foot
The basic framework of hand cradle frame body, horizon bar are horizontally placed between each steel pipe support vertical rod, and bridging is respectively arranged in scaffold
The outer periphery of frame body and internal vertical, horizontal;Wherein, the top Yu bottom end of the steel pipe support vertical rod further respectively have jacking,
Heelpiece is provided with keel in jacking, and keel directly hold out against the bottom surface in basement roof.
2. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
Horizon bar includes longitudinal horizontal rod and horizontal rod, and longitudinal horizontal rod and horizontal rod collectively form steel pipe support vertical rod
Lateral stiffening feature;The bridging includes vertical bridging and horizontal cross brace, and vertical bridging is vertical along outside steel pipe support
45 degree of angle settings of surrounding of bar, and continuous setting is then provided with the level at the top intersection point plane of vertical bridging to pushing up
Bridging;The vertical bridging and horizontal cross brace collectively form the vertical ruggedized construction of steel pipe support vertical rod.
3. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
Steel pipe in connection system for guide rail is all made of Φ 48 × 3.0mm steel pipe, uses bowl fastening type or bayonet joint between each steel pipe.
4. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
Building hoist is specially the dual-purpose building hoist of SC200/200 type people's goods, and specification is 0.65 × 0.65 × 1.508m;It is described to apply
The guide rail of work elevator is set near structural column, and guide rail and ground contact surface are 0.65 × 0.65m;The lifter foundation
Having a size of 5600mm × 4200mm, with a thickness of 330mm, strength grade of concrete C30.
5. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
Hard rubber buffer layer with a thickness of 30mm.
6. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
Heelpiece is specially 16# channel steel, heelpiece to put direction parallel with post-cast strip, and elongated setting.
7. the ruggedized construction according to claim 1 suitable for building hoist basement roof, which is characterized in that described
The arrangement range of connection system for guide rail is specially the increased 1-1.5m stressing influence range of lifter foundation and its every side;Wherein, it leads
Scaffold system outside the connection system for guide rail at frame position, the connection system for guide rail at post-cast strip position and saddle range, in reinforcing scope
The size or structure of system are not exactly the same.
8. the ruggedized construction according to claim 7 suitable for building hoist basement roof, which is characterized in that described
Saddle range is outer, in the connection system for guide rail in reinforcing scope, and the vertically and horizontally spacing of each steel pipe support vertical rod is less than or equal to 600 ×
600mm, upright bar step pitch are less than or equal to 1200mm;The free end height of the jacking is no more than 500mm, is provided in jacking
100 × 100mm rough ground or 16# I-shaped steel joist, corresponding keel directly hold out against the bottom surface in basement roof.
9. the ruggedized construction according to claim 7 suitable for building hoist basement roof, which is characterized in that described
In the connection system for guide rail at saddle position, the vertically and horizontally spacing of each steel pipe support vertical rod is less than or equal to 300 × 300mm, upright bar step
Away from less than or equal to 1200mm;The free end height of the jacking is no more than 500mm, and 100 × 100mm wood dragon is provided in jacking
Bone or 16# I-shaped steel joist are reinforced with encrypting anti-top, encrypt range 1.2m × 1.2m.
10. the ruggedized construction according to claim 7 suitable for building hoist basement roof, which is characterized in that institute
In the connection system for guide rail for stating post-cast strip position, post-cast strip two sides are respectively arranged 2-3 row's steel pipe support vertical rod, each steel pipe support vertical rod
Vertically and horizontally spacing less than 600 × 600mm, upright bar step pitch is less than or equal to 1200mm;The free end height of the jacking does not surpass
500mm is crossed, 16# I-shaped steel joist is provided in jacking, 16# I-steel keel top is provided with 100 × 100mm rough ground conduct
Secondary joist, secondary joist directly hold out against the bottom surface in basement roof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920237058.6U CN209670395U (en) | 2019-02-25 | 2019-02-25 | A kind of ruggedized construction suitable for building hoist basement roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920237058.6U CN209670395U (en) | 2019-02-25 | 2019-02-25 | A kind of ruggedized construction suitable for building hoist basement roof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209670395U true CN209670395U (en) | 2019-11-22 |
Family
ID=68569680
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920237058.6U Active CN209670395U (en) | 2019-02-25 | 2019-02-25 | A kind of ruggedized construction suitable for building hoist basement roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209670395U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736591A (en) * | 2019-02-25 | 2019-05-10 | 安徽省第二建筑工程有限公司 | A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof |
-
2019
- 2019-02-25 CN CN201920237058.6U patent/CN209670395U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736591A (en) * | 2019-02-25 | 2019-05-10 | 安徽省第二建筑工程有限公司 | A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105297630B (en) | A kind of double limb steel pipe construction methods of main arch arch arc | |
WO2017084210A1 (en) | Inner support wire saw lossless cutting and disassembling structure and construction method therefor | |
CN206512764U (en) | A kind of horizontally loading test system for applying vertical load in stake top | |
CN103939114B (en) | A kind of outstanding rail chassis lining construction method | |
CN103590602B (en) | The construction method of cast-in-place concrete hollow building roof | |
CN105040970A (en) | Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system | |
CN109736591A (en) | A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof | |
CN103510523A (en) | Sectional cutting and overall craning method for supporting beam in deep foundation pit multilayered reinforced concrete | |
CN103643971B (en) | Tunnel invert sizing end mould rapid constructing method | |
CN107152160A (en) | A kind of shuttering supporting builder's jack operation platform erection method | |
CN108277818A (en) | Basement top-down method Combined tower crane foundation structure and construction method | |
CN202090605U (en) | Tool type floor evenness and floor slab negative reinforcement protecting layer control device | |
CN106087746A (en) | A kind of cast-in-situ box girder falsework construction method and bridge | |
CN103758348A (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
CN110080454A (en) | LPM light filling body Construction of Cast-in-situ Concrete Hollow | |
CN209670395U (en) | A kind of ruggedized construction suitable for building hoist basement roof | |
CN115369778A (en) | Construction method of steel cross beam rotating body structure | |
CN107905609A (en) | Underground people's air defense construction method | |
CN110409624A (en) | A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method | |
CN102322140B (en) | Supporting construction method for large-span creasing formwork | |
CN102071780B (en) | Method for manufacturing and mounting 120-meter long roof tile at high altitude | |
CN103967052B (en) | A kind of method of protecting the new and old frame core-tube system substrate discrepancy in elevation soil body | |
CN111236632A (en) | Construction method of heavy bracket and profile steel combined supporting system for super-thick top plate | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN114277672B (en) | Large-span prestressed concrete bent cap structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |